Appendix B - Architectural Drawings.pdf
PDF 826 KB Posted
- Attached to
- Procure services to refurbish LGF Bathroom building works within the U. S. Embassy Juba, South Sudan
- Solicitation number
- 72066825Q00004
About this file
This file contains architectural drawings and specifications for the renovation of a Local Guard Force (LGF) bathroom building at the U.S. Embassy compound in Juba, South Sudan. The drawings detail a comprehensive renovation project funded by USAID/South Sudan that includes three main bathroom sections - two male bathrooms and one female bathroom.
The renovation scope includes replacing exterior aluminum doors, toilet/shower cubicle doors, window glazing, floor and wall tiles, ceiling materials (replacing plywood with gypsum PVC laminated tiles), roofing sheets and steel trusses, and bathroom lockers. Specific technical requirements include installing 600x600x15mm suspended ceiling panels, 26-gauge roofing sheets with RHS 60x40x3mm purlins, and aluminum perforated ceiling tiles on the eaves. The drawings provide detailed floor plans, elevations, cross-sections, and new roof truss designs with precise measurements and specifications. The contractor must obtain relevant building permits, maintain site safety, verify all drawing information, and restore the site to pre-construction condition upon completion. The drawings include comprehensive schedules for rooms, doors, and windows with exact dimensions and materials specified.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LGF BATHROOM BUILDING ARCHITECTURAL
DRAWINGS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PROJECT DIRECTORY PROJECT DATA
PROJECT
BUILDING CODES
1. ASCE STANDARD
2. OBO BUILDING CODE
LGF BATHROOM BUILDING RENOVATION
U.S EMBASSY COMPOUND
JUBA, SOUTH SUDAN
LGF BATHROOM BUILDING RENOVATION
U.S EMBASSY COMPOUND, JUBA, SOUTH SUDAN
FUNDER
USAID/SOUTH SUDAN
U.S EMBASSY COMPOUND
JUBA, SOUTH SUDAN
EMAIL: RNYARSUK@USAID.GOV
CONTACT: RICHARD NYARSUK
STRUCTURAL ENGINEER
GPTECH
CLASSIFICATION OF WORK
DESIGN AND CONSTRUCTION
ABBREVIATED SCOPE OF WORK
USAID SOUTH SUDAN REQUIRES THE PROVISION OF DESIGN & CONSTRUCTION
SERVICES (LABOR, MATERIALS, EQUIPMENT, MANAGEMENT & SERVICES)
NECESSARY TO RENOVATE AN EXISTING BATHROOM BUILDING FOR THE LOCAL
GUARD FORCE AT THE U.S EMBASSY COMPOUND . THE BUILDING CONSISTS OF
BATHROOM FACILITIES FOR MALE AND FEMALE USERS. IT IS THEREFORE
PARTITIONED INTO TWO MALE SECTIONS AND A FEMALE SECTION. THE BUILDING IS
IN NEED OF IMMEDIATE RENOVATION TO ENHANCE ITS SERVICEABILITY TO MEET
THE DEMANDS OF THE USERS.
KEY PLAN
SCOPE OF WORK
BUILDER'S WORKS
1. DOORS AND WINDOWS
· RETAIN ALL EXISTING EXTERIOR STEEL
DOORS IN MEN'S BATHROOM 1. HOWEVER,
APPLY NEW PAINTING. REPLACE ALL
EXISTING ALUMINIUM DOORS TO TOILETS
AND SHOWER CUBICLES IN MEN'S
BATHROOM 1WITH NEW ONES.
· REPLACE ALL EXISTING EXTERIOR
ALUMINIUM DOORS IN MEN'S BATHROOM 2
AND WOMEN'S BATHROOM WITH NEW ONES.
REPLACE ALL WOODEN DOORS TO TOILETS
AND SHOWER CUBICLES IN THE SAME
FACILITY WITH NEW ALUMINIUM DOORS.
· RETAIN THE STEEL FRAMES ON EXISTING
WINDOWS BUT REPLACE THE CLEAR GLASS
PANES AND ALUMINIUM PANELS WITH
OBSCURE GLASSES IN BOTH FIXED AND
LOCKABLE SASHES FOR THE ENTIRE
BUILDING.
2. FLOOR AND WALL TILES
· REMOVE EXISTING FLOOR AND WALL TILES
INCLUDING THE SCREED AND REPLACE ALL
WITH NEW.
3. CEILING
· REPLACE EXISTING PLYWOOD CEILING
BOARD WITH GYPSUM PVC LAMINATED
TILES (DEW DROP 154) IN SUSPENDED
CEILING COMPRISING 600 X 600 X 15 MM
THICK PANELS CONCEALED 'Z' SUSPENSION
SYSTEM AT 500 MM UNDERSIDE OF ROOF IN
MEN'S BATHROOM 1.
· REPLACE EXISTING GYPSUM SUSPENDED
WITH GYPSUM PVC LAMINATED TILES
(DEW DROP 154) IN SUSPENDED CEILING
COMPRISING 600 X 600 X 15 MM THICK
PANELS LAID ON IMPORTED CONCEALED 'Z'
SUSPENSION SYSTEM AT 500 MM
UNDERSIDE OF ROOF IN MEN'S BATHROOM 2
AND WOMEN'S BATHROOM.
4. ROOFING
· REMOVE ALL EXISTING ROOFING SHEETS
ALONG WITH STEEL TRUSS MEMBERS FOR
ALL THE ROOFS AND REPLACE WITH A NEW
ROOFING STRUCTURE.
· INSTALL ALUMINIUM PERFORATED CEILING
TILES 600 X 600 X 0.6 MM LAID ON IMPORTED
CONCEALED 'Z' SUSPENSION SYSTEM ON
THE EAVE OF THE PROPOSED ROOFING.
5. BATHROOM LOCKERS
· REMOVE AND REPLACE ALL THE EXISTING
LOCKERS IN ALL THE CHANGING ROOMS.
CONTRACTOR'S REQUIREMENTS
THE CONTRACTOR'S REQUIREMENTS INCLUDE,
BUT WILL NOT NECESSARILY BE LIMITED TO
THE FOLLOWING:
6. OBTAIN ALL THE RELEVANT BUILDING
PERMITS ISSUED BY THE U.S EMBASSY AND
COMPLY WITH ALL APPLICABLE LOCAL,
NATIONAL AND UNITED STATE CODES,
STANDARDS AND REGULATIONS
7. ESTABLISH AND MAINTAIN A SAFE
CONSTRUCTION SITE FOR WORKERS , AND
FOR RESIDENTS AND GUESTS AT THE
PROPERTY.
8. VERIFY ALL INFORMATION PROVIDED IN
THIS SET OF DRAWINGS PRIOR TO STARTING
WORK, REQUEST CLARIFICATION AS
NEEDED AND NOTIFY THE ENGINEER OF
ANY DISCREPANCIES.
9. APPLY PLASTER TO SURFACE OF NEWLY
BUILT MASONRY WALLS USING HAND
TOOLS
10. CLEAN AND PAINT ALL NEW PLASTERS TO
MATCH THE REQUIRED.
11. REMOVE EXCESS MATERIALS AND RESTORE
THE SITE TO ITS PRE-CONSTRUCTION
CONDITION
N
LGF
BATHROOM
MH
MH
MH
PAVED
WALKWAY
PAVED WALKWAY
WORKSHOP
SECURITY
ROOM
WATER
HEATER
STORE
DRAWING INDEX
A-001 - GENERAL NOTES
A-002 - GENERAL NOTES
A-003 - AREAL SITE LAYOUT
A-004 - FLOOR & ROOF PLANS
A-005 - SOUTH & NORTH ELEVATIONS
A-006 - WEST & EAST ELEVATIONS
A-007 - TRAVERSE CROSS-SECTION
A-008 - LONGITUDINAL CROSS-SECTION
A-009 - GENERAL SCHEDULES FOR
EXISTING ITEMS
A-010 - NEW ELEVATIONS
A-011 - PROPOSED NEW ROOF LAYOUT
A-012 - PROPOSED NEW ROOF TRUSS
690MM BLOCK APRON COMPOUND PERIMETER
WALL FENCE
WEST CAC
USAID ENGINEERING SUPPORT PROGRAM II:
EMBASSY COMPOUND
LOCAL GUARD FORCE (LGF) BATHROOM BUILDING
RENOVATION WORKS
DRAWING NO. A-OO1
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
FILE NAME: LGF-BATHROOM
REMARKS
MURYE GODFREY
AJANG ISAAC
FEMI ADE GENERAL NOTES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133
USAID ENGINEERING SUPPORT PROGRAM II:
EMBASSY COMPOUND
LOCAL GUARD FORCE (LGF) BATHROOM BUILDING
RENOVATION WORKS
DRAWING NO. A-OO2
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
FILE NAME: LGF-BATHROOM
REMARKS
MURYE GODFREY
AJANG ISAAC
FEMI ADE GENERAL NOTES
LGF BATHROOM BUILDING RENOVATION
U.S EMBASSY COMPOUND, JUBA, SOUTH SUDAN
GENERAL NOTES
1. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR CONSTRUCTION
SITE SAFETY, AS WELL AS THE MEANS AND METHODS OF CONSTRUCTION
INCLUDING TEMPORARY SHORING (AS REQUIRED)
2. THESE PLANS AND DETAILS WERE DEVELOPED FROM LIMITED SITE
OBSERVATIONS. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS AND
NOTIFY THE ENGINEER OF ANY SIGNIFICANT DISCREPANCIES BETWEEN THE
CONSTRUCTION DRAWINGS AND AS-BUILT CONDITIONS.
3. WHERE INDICATED, PLANS AND DETAILS ARE PROVIDED FOR REFERENCE
ONLY TO IDENTIFY LOCATIONS/SCOPES OF WORK.
4. DETAIL CALL-OUTS ARE TYPICAL . WHAT IS SHOWN OR REFERENCED AT
A GIVEN LOCATION SHALL BE PROVIDED AS THOUGH SHOWN THROUGHOUT
UNLESS OTHERWISE NOTED.
5. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN. INCASE OF A
CONFLICT, THE CONTRACTOR SHALL NOTIFY THE ENGINEER.
6. ALL WORK SHALL CONFORM TO THE CONTRACT DOCUMENT, WHICH
INCLUDE DRAWINGS AND ALL ADDENDUMS OR MODIFICATIONS ISSUED BY
THE ENGINEER.
7. PERFORM ALL WORK ACCORDING TO INDUSTRY STANDARDS,
MANUFACTURER REQUIREMENTS, CODES, LAWS, ORDINANCES, RULES AND
REGULATIONS OF PUBLIC AUTHORITIES GOVERNING THE WORK. INCASE OF
DISCREPANCIES, THE CONTRACTOR SHALL NOTIFY THE ENGINEER BEFORE
PROCEEDING
8. THE CONTRACTOR SHALL VISIT THE PROJECT SITE AND BE ACQUAINTED
WITH THE ALL THE CONDITIONS RELATING TO THE CONSTRUCTION OF THE
PROJECT. THE CONTRACTOR SHALL OBTAIN ALL FIELD MEASUREMENTS
REQUIRED FOR THE ACCURATE FABRICATION AND INSTALLATION OF THE
WORK.
9. THE CONTRACTOR SHALL EXAMINE, READ AND BE THOROUGHLY
FAMILIAR WITH THE CONSTRUCTION DOCUMENTS. SHOULD THE CONTRACTOR
FIND DISCREPANCIES OR OMISSIONS IN THE DRAWINGS AND/OR NOTES, OR
SHOULD THE CONTRACTOR BE IN DOUBT AS TO THE INTENT OR MEANING OF
ANY PARTS OF THE CONSTRUCTION DOCUMENTS, THE CONTRACTOR SHALL
REQUEST CLARIFICATION FROM THE ENGINEER PRIOR TO PERFORMING THE
WORK IN QUESTION.
10. THE CONTRACTOR SHALL SUBMIT REQUESTS FOR SUBSTITUTIONS,
REVISIONS OR CHANGES TO THE ENGINEER FOR REVIEW AND ACCEPTANCE
PRIOR TO PURCHASE, FABRICATION OR INSTALLATION.
11. THE CONTRACTOR SHALL OBTAIN ALL PERMITS AND INSPECTIONS
REQUIRED BY PUBLIC AUTHORITIES GOVERNING THE WORK.
12. ALL WORK SHALL BE PERFORMED IN A SAFE AND ORDERLY MANNER
WITHOUT DAMAGE TO OTHER PARTS OF THE PREMISES AND/OR ADJACENT
PROPERTIES . DAMAGE OR LOSS SHALL BE CORRECTED AND/OR REPLACED BY
THE CONTRACTOR AT NO COST TO THE OWNER.
13. THE CONTRACTOR SHALL PROVIDE TRAFFIC CONTROL AND TEMPORARY
BARRICADES AS REQUIRED DURING CONSTRUCTION WHEN ROADWAYS AND/OR
RIGHT-OF-WAYS ARE BLOCKED DUE TO THE WORK. THE CONTRACTOR SHALL
MINIMIZE DISRUPTION TO TRAFFIC FLOW FOR VEHICLES AND MAINTAIN SAFETY
FOR PEDESTRIANS AT THE PROJECT SITE.
14. THE CONTRACTOR SHALL COORDINATE WORK WITH THE OWNER AND
PROPERTY MANAGER, INCLUDING SCHEDULING TIMES AND LOCATIONS FOR
DELIVERIES, BUILDING ACCESS, USE OF ELECTRICITY AND USE OF WATER.
MINIMIZE DISTURBANCE OF BUILDING FUNCTIONS AND OCCUPANTS
15. WORK AREAS SHALL REMAIN SECURE THROUGHOUT CONSTRUCTION. THE
CONTRACTOR SHALL COORDINATE WITH THE OWNER TO ENSURE SECURITY.
16. MAINTAIN EGRESS AND ACCESS TO THE PROPERTY IN ACCORDANCE WITH
CODES AND ORDINANCES.
17. THE SCOPE OF WORK OF THESE REPAIR DRAWINGS ARE LIMITED TO THE
AREAS AND CONDITIONS SHOWN, AND SHALL NOT BE USED BEYOND ITS
SPECIFIED PURPOSE.
18. INSTRUCTIONS FOR ACCESS TO SITE CAN BE FOUND IN THE CONTRACTOR'S
STATEMENT OF WORK.
19. CONTRACTOR TO PROVIDE PROTECTION OF EXISTING FURNITURE AND
SURFACES.
20. CONTRACTOR TO LIMIT DUST AND DEBRIS FROM ALL OPERATIONS BY USE
OF BARRIERS AND OTHER MEANS.
21. ALL MATERIALS STORED ON SITE ARE THE RESPONSIBILITY OF THE
CONTRACTOR. THE OWNER WILL IDENTIFY LAY DOWN AREAS FOR THE
CONTRACTORS USE, HOWEVER, PROTECTION AND SECURITY OF THE STORED
MATERIAL IS THE RESPONSIBILITY OF THE CONTRACTOR.
CONCRETE
1. ALL CONCRETE WORK SHALL COMPLY WITH "ACI 301:SPECIFICATIONS FOR
STRUCTURAL CONCRETE" LATEST EDITION.
2. ALL CONCRETE REINFORCEMENT SHALL BE DETAILED,FABRICATED,
LABELED, SUPPORTED AND SPACED IN FORMS AND SECURED IN PLACE IN
ACCORDANCE WITH THE PROCEDURES AND REQUIREMENTS OUTLINED IN THE
LATEST EDITION OF "ACI 318: BUILDING CODE REQUIREMENTS FOR STRUCTURAL
CONCRETE AND COMMENTARY" AND 'SP-66: ACI DETAILING MANUAL."
3. CEMENT SHALL BE PORTLAND TYPE I OR SIMILAR.
4. THE MAXIMUM WATER CEMENT RATIO OF ALL CONCRETE SHALL BE 0.4,
UNLESS OTHERWISE STATED.
5. ALL REINFORCEMENT SHALL BE HELD RIGIDLY AND ACCURATELY IN
PLACE, AND PROTECTED AGAINST DISPLACEMENT BEFORE AND DURING
PLACEMENT.
6. PRIOR TO THE START OF WORK, THE CONCRETE CONTRACTOR SHALL
COORDINATE AND DETERMINE WITH THE OWNER ALL DIMENSIONS AND
LOCATIONS OF OPENINGS, ELECTRICAL CONDUIT, AND OTHER SIMILAR ITEMS.
GENERAL NOTES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NOTES
1. All dimensions measured are in millimeters
(mm).
2. The Workshop, Store, Security Room and
West CAC drawings are not to scale.
3. Do not scale from drawings
LEGEND
1. MH: Man Hole
2. NGL: Natural Ground Level
N
LGF
BATHROOM
MH
MHMH
PAVED
WALKWAY
PAVED WALKWAY
WORKSHOP
SECURITY
ROOM
WATER
HEATER
STORE
Men's Bathroom 2
Women's Bathroom
Water Heater Room
SCALE: 1:100
Men's Bathroom 1
COMPOUND PERIMETER
WALL FENCE
FLOOR A, 1500 MM WIDE,
120 MM ABOVE NGL
690 MM
BLOCK APRON
WEST CAC
USAID ENGINEERING SUPPORT PROGRAM II:
EMBASSY COMPOUND
LOCAL GUARD FORCE (LGF) BATHROOM BUILDING
RENOVATION WORKS
DRAWING NO. A-OO3
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
FILE NAME: LGF-BATHROOM
REMARKS
MURYE GODFREY
AJANG ISAAC
FEMI ADE AREAL SITE LAYOUT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1430 130 3388
1200 200 1660 1660 1200
280 1430 130 3388 280
280 2900 200 2900 280
280 2160 280
D1
D1
D6
D6
D6
D6
D6
W2
W2W3
W3
W1 W1
D7
D7
D7
D7
D7
D4
D4
D4 D5
D5
D5
D2 D2
2900 2900
NOTES
1. All dimensions measured are in millimeters
(mm).
2. Do not scale from drawings.
3. Schedules for Room Area No. 1 to 10 are provided in Drawing A-007
LEGEND
1. S-0X: Section Number
2. L: Locker Position
2°
2°
2°
Iron sheet roof at a slope of 2 degrees in the direction shown by the arrow
Roof overhang of 580mm
Roof overhang of 580mm
Roof overhang of 580mm
Roof overhang of 580 mm
Roof overhang of 580 mm
Roof overhang of 580 mm
Roof overhang of 430 mm
Roof overhang of 430 mm
Roof overhang of 430 mm
SCALE: 1:100
ROOF A
ROOF B
ROOF C
N
GROUND FLOOR PLAN ROOF FLOOR PLAN
S-02 S-02
S-01 S-01
S-03
S-04
S-04S-03
Iron sheet roof at a slope of 2 degrees in the direction shown by the arrow
Iron sheet roof at a slope of 2 degrees in the direction shown by the arrow
LL
L L
L L L
L
L
L L
L
L
L
L
L
L
L
L
L
DEMOLITIONS AND DOWNTAKINGS
All materials arising from demolitions and downtakings shall be the property of USAID. The materials shall be transported/stored as per USAID's directives and all remaining debris shall be removed from site by the Contractor.
The following are to be demolished or removed:
1. Existing exterior and interior aluminium doors in bathroom facility
2. Interior wooden doors in Men's Bathroom 1 and
Women's Bathroom.
3. Window glazing and aluminium panels in the window sashes for both Men's Bathroom 2 and Women's Bathroom.
4. Floor and wall tiles in all the bathrooms.
5. Plywood board ceiling in Men's Bathroom 1.
6. Gypsum suspended ceiling, 600*600 panels and entire grid system in both Men's Bathroom 2 and Women's Bathroom.
7. Bathroom lockers in all bathrooms.
8. Roofing sheets and all steel trusses from the bathrooms.
9. Extract fans.
MH
ROOF D2°
DRAWING NO. A-004
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
FILE NAME: LGF - BATHROOM
REMARKS
MURYE GODFREY
AJANG ISAAC
FEMI ADE FLOOR & ROOF PLANS
USAID ENGINEERING SUPPORT PROGRAM II:
EMBASSY COMPOUND
LOCAL GUARD FORCE (LGF) BATHROOM BUILDING
RENOVATION WORKS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
GF
RF
5508 933 900 890 21
13502801093
Door Opening
GF
RF
1350 880 565 1200 590 1200 56521
2806600
SOUTH ELEVATION
SCALE: 1:100
NORTH ELEVATION
ROOF C
ROOF A
ROOF C
ROOF B
NOTES
1. All dimensions measured are in millimeters (mm).
2. Do not scale from drawings.
LEGEND
1. RF: Roof Floor
2. GF: Ground Floor
3. Al: Aluminium
Steel window Steel window
Al Door
Roof B
Iron sheet roof at a slope of 2 degrees
Roof at a slope of 2 degrees
Water Heater room
DRAWING NO. A-005
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
FILE NAME: LGF - BATHROOM
REMARKS
MURYE GODFREY
AJANG ISAAC
FEMI ADE EXISTING SOUTH & NORTH ELEVATIONS
USAID ENGINEERING SUPPORT PROGRAM II:
EMBASSY COMPOUND
LOCAL GUARD FORCE (LGF) BATHROOM BUILDING
RENOVATION WORKS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RF
7230 1830 1825 9205
3200 640 3200 1690
00280
0 26
Water Heater Room
WEST ELEVATION
GF
RF
1720 3200 610 3200 1000 880 1100 880 7500
3320 72509520
SCALE: 1:100
EAST ELEVATION
ROOF C ROOF A
ROOF B
ROOF A
ROOF B
ROOF C
ROOF D
Steel window Steel window Steel door Steel door
Steel windowSteel window
DRAWING NO. A-006
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
FILE NAME: LGF - BATHROOM
REMARKS
MURYE GODFREY
AJANG ISAAC
FEMI ADE EXISTING WEST & EAST ELEVATIONS
USAID ENGINEERING SUPPORT PROGRAM II:
EMBASSY COMPOUND
LOCAL GUARD FORCE (LGF) BATHROOM BUILDING
RENOVATION WORKS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RF
2801200186020018601200
Water Heater Building Al Door
580580
Women's Bathroom Men's Bathroom 2
Gypsum Ceiling
GF
RF
580 580
280 4948 280
Plywood Ceiling
ROOF A
ROOF C
SCALE: 1:100
NOTES
1. All dimensions measured are in millimeters (mm).
2. Do not scale from drawings.
3. All interior doors in the Men's
Bathroom 2 are wooden
LEGEND
1. RF: Roof Floor
2. GF: Ground Floor
3. Al: Aluminium
Lockers
Lockers
SECTION S-02
SECTION S-01
Male Bathroom 1
DRAWING NO. A-007
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
FILE NAME: LGF - BATHROOM
REMARKS
MURYE GODFREY
AJANG ISAAC
FEMI ADE TRAVERSE CROSS-SECTIONS
USAID ENGINEERING SUPPORT PROGRAM II:
EMBASSY COMPOUND
LOCAL GUARD FORCE (LGF) BATHROOM BUILDING
RENOVATION WORKS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RF
870 350 870 380 870 400 870 410 870
Water Heater Building
Men's Bathroom 1 Women's Bathroom 7230 3340 280 8960 280
GF
RF
14880 1100 880 210
Men's Bathroom 1 Men's Bathroom 2 280 6670 280
Gypsum Ceiling
Plywood Ceiling
ROOF A
ROOF B
ROOF C
Lockers
ROOF A
ROOF B
ROOF C
Al Door
Wooden Door
Lockers
Wooden Door
NOTES
1. All dimensions measured are in millimeters (mm).
2. Do not scale from drawings.
3. All interior doors in the Men's
Bathroom 2 are wooden
LEGEND
1. RF: Roof Floor
2. GF: Ground Floor
3. Al: Aluminium
SCALE: 1:100
SECTION S-03
SECTION S-04
Changing Room
Steel Windows
Changing Room
DRAWING NO. A-008
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
FILE NAME: LGF - BATHROOM
REMARKS
MURYE GODFREY
AJANG ISAAC
FEMI ADE
LONGITUDINAL CROSS-SECTIONS
USAID ENGINEERING SUPPORT PROGRAM II:
EMBASSY COMPOUND
LOCAL GUARD FORCE (LGF) BATHROOM BUILDING
RENOVATION WORKS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ROOM SCHEDULE
Room Area
Floor Area
Floor Finish Wall Finish Ceiling Finish Count
Men's Bathroom 1
22 m² Ceramic Tiles, 330*330 Red
White Ceramic Tiles, 200*300 mm, 1.54m high plus paint
Suspended plywood panels
16 m² Ceramic Tiles, 330*330 White
Paint Suspended plywood panels
2 m² Ceramic Tiles, 330*330 White
Suspended plywood panels
2 m² Ceramic Tiles, 330*330 Red
16 m²
Cast in situ concrete Floor
Suspended gypsum panels
2 m² Ceramic Tiles, 330*330 White
2 m² Ceramic Tiles, 300*300 White
13 m² Ceramic Tiles, 300*300 White
3 m² Ceramic Tiles, 300*300 White
2 m² Ceramic Tiles, 330*330 White
Grand total: 22
DOOR SCHEDULE
Mark Description Width (mm) Height
(mm) Count
D1 Steel Door 880 2100 2 D2 Aluminium Door 712 2300 1 D2 Aluminium Door 880 2300 1 D4 Aluminium Door 800 1960 1 D4 Aluminium Door 810 1960 1 D4 Aluminium Door 870 1960 1 D5 Aluminium Door 724 1940 1 D5 Aluminium Door 790 1940 1 D5 Aluminium Door 900 1940 1 D6 Wooden Door 870 1980 5 D7 Wooden Door 870 1980 5 D8 Aluminium Door 802 1940 1
Grand total: 21
WINDOW SCHEDULE
Mark Description Sill Height
(mm) Width (mm) Height(mm) Count W1 Steel frames and thick glass window
1800 1200 570 2
W2 Steel frames and thick glass window
1800 3200 600 2
W3 Steel frames and thick glass window
1800 3200 600 2
Grand total: 6
S/N
Bathroom
Men's Bathroom 2
Women's Bathroom
2 m² Ceramic Tiles, 300*300 White
3 m² Paint 1
5Water Heater
Ceramic Tiles, 300*300 White
Concrete slab
White Ceramic Tiles, 200*300 mm, 1.75m high plus paint
White Ceramic Tiles, 200*300 mm, 1.5m high plus paint
White Ceramic Tiles, 200*300 mm, 1.79m high plus paint
White Ceramic Tiles, 200*300 mm, 1.79m high plus paint
White Ceramic Tiles, 200*300 mm, 1.75m high plus paint
White Ceramic Tiles, 200*300 mm, 1.79m high plus paint
White Ceramic Tiles, 200*300 mm, 1.79m high plus paint
White Ceramic Tiles, 200*300 mm, 1.79m high plus paint
White Ceramic Tiles, 200*300 mm, 1.5m high plus paint
Suspended plywood panels
Suspended gypsum panels
Suspended gypsum panels
Suspended gypsum panels
Suspended gypsum panels
Suspended gypsum panels
Suspended gypsum panels
DRAWING NO. A-009
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
FILE NAME: LGF - BATHROOM
REMARKS
MURYE GODFREY
AJANG ISAAC
FEMI ADE GENERAL SCHEDULES FOR EXISTING ITEMS
USAID ENGINEERING SUPPORT PROGRAM II:
EMBASSY COMPOUND
LOCAL GUARD FORCE (LGF) BATHROOM BUILDING
RENOVATION WORKS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
Water Heater
GF
880 565 1200 590 1200 565 880
ROOF C
NEW SOUTH ELEVATION
GF
5307 933 900 890 21
ROOF A
ROOF C
ROOF B
NEW SOUTH ELEVATION
SCALE: 1:100
GF
7230 1830 1825 9205
1360 280
GF
1720 3200 610 3200 1000 880 1100 880 7500
3320 72509520
3200 640 3200 1690
0 26
ROOF A
ROOF B
ROOF C
ROOF A ROOF B
ROOF C
WEST ELEVATION
EAST ELEVATION
SCALE: 1:100
Steel window Steel windowAl door Al door
Steel door Steel door
Steel window Steel window Steel door Steel door
DRAWING NO. A-010
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
FILE NAME: LGF - BATHROOM
REMARKS
MURYE GODFREY
AJANG ISAAC
FEMI ADE NEW ELEVATIONS
USAID ENGINEERING SUPPORT PROGRAM II:
EMBASSY COMPOUND
LOCAL GUARD FORCE (LGF) BATHROOM BUILDING
RENOVATION WORKS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
14.5°
14.5°
14.5°
ROOF A
ROOF B
ROOF C
PROPOSED ROOF FLOOR PLAN
SCALE: 1:100
NOTES
1. All dimensions measured are in millimeters
(mm).
2. Do not scale from drawings.
ROOF D
2°
ROOF DESIGN DETAILS
1. Roofs A, B and C shall be constructed as shown in the sheet A-010.
2. Roof D shall be constructed maintaining the existing design i.e. 26G Roofing sheets screwed to 60x40x3mm purlins at 900mm c/c welded to RHS 80x40x3mm wall plates.
3. The bottom chords/ truss framing is placed at 1500 mm c/c spacing from each otherROOF A
ROOF B
ROOF C
PROPOSED ROOF TRUSS PLAN
SCALE: 1:100
ROOF D
RHS Purlins spaced at 900 mm c/c unless otherwise stated
Steel truss spaced 1500 mm c/c unless otherwise stated
Roof overhang of 600 mm
Roof overhang of 600 mm
Iron sheet roof at a slope of 14.5 degrees in the direction shown by the direction of the arrow
Roof overhang of 600 mm
Roof overhang of 600 mm Roof overhang of 600 mm
Iron sheet roof at a slope of 14.5 degrees in the direction shown by the arrow
Roof overhang of 600 mm
Iron sheet roof at a slope of 14.5 degrees in the direction shown by the arrow
Roof overhang of 600 mm
Roof overhang of 600 mm
DRAWING NO. A-011
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
FILE NAME: LGF - BATHROOM
REMARKS
MURYE GODFREY
AJANG ISAAC
FEMI ADE PROPOSED NEW ROOF LAYOUT
USAID ENGINEERING SUPPORT PROGRAM II:
EMBASSY COMPOUND
LOCAL GUARD FORCE (LGF) BATHROOM BUILDING
RENOVATION WORKS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ROOF C
ROOF A & ROOF B
SCALE: 1:100
NOTES
1. All dimensions measured are in millimeters (mm).
2. Do not scale from drawings.
3. All welds are 8 mm fillet welds
4. All gusset plates are mild steel 3 mm plates
5. The new wall shall be mechanically tied to the already existing masonry using hoop iron
LEGEND
1. PVC: Polyvinyl Chloride
2. RHS: Rectangular Hollow Section
280 mm existing brick wall masonry
Wall Plate RHS, 80x40x3 mm
King Post RHS, 80x40x3 mm
Struts, Ties RHS, 80x40x3 mm
Purlins RHS, 60x40x3 mmGauge 26 roofing sheet
1595 1575
PVC 6"
600 600 Aluminium perforated ceiling 600x600x0.6 mm
Purlins RHS, 60x40x3 mm
Struts, Ties RHS, 80x40x3 mm
Wall Plate RHS, 80x40x3 mm
King Post RHS, 80x40x3 mm
280 mm brick wall
Aluminium perforated ceiling 600x600x0.6 mm
Gauge 26 roofing sheet
PVC 6"
5320600 600
Gusset plate 180x110x3 mm
Gusset plate 180x110x3 mm
Angle section 40x40x3 mm
Gusset Plate, fabricated accordingly at site
Gusset Plate, 110x110x3 mm
Gusset Plate, 180x110x3 mm
1530 1450
150 mm new brick wall
150 mm new brick wall
1262 12621318 1358
Gusset Plate, fabricated accordingly at site
DRAWING NO. A-012
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
FILE NAME: LGF - BATHROOM
REMARKS
MURYE GODFREY
AJANG ISAAC
FEMI ADE PROPOSED NEW ROOF TRUSSES
USAID ENGINEERING SUPPORT PROGRAM II:
EMBASSY COMPOUND
LOCAL GUARD FORCE (LGF) BATHROOM BUILDING
RENOVATION WORKS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
| Sheets and Views |
| LGF BATHROOM BUILDING RENOVATION_ARCHITECTURAL DESIGN DRAWINGS-CIV |
| LGF BATHROOM BUILDING RENOVATION_ARCHITECTURAL DESIGN DRAWINGS-GENERAL NOTES 1 |
| LGF BATHROOM BUILDING RENOVATION_ARCHITECTURAL DESIGN DRAWINGS-GENERAL NOTES 2 |
| LGF BATHROOM BUILDING RENOVATION_ARCHITECTURAL DESIGN DRAWINGS-SITE LAYOUT |
| LGF BATHROOM BUILDING RENOVATION_ARCHITECTURAL DESIGN DRAWINGS-PLANS |
| LGF BATHROOM BUILDING RENOVATION_ARCHITECTURAL DESIGN DRAWINGS-ELEVATIONS1 |
| LGF BATHROOM BUILDING RENOVATION_ARCHITECTURAL DESIGN DRAWINGS-ELEVATIONS (2) |
| LGF BATHROOM BUILDING RENOVATION_ARCHITECTURAL DESIGN DRAWINGS-CROSS-SECTIONS (2) |
| LGF BATHROOM BUILDING RENOVATION_ARCHITECTURAL DESIGN DRAWINGS-CROSS-SECTIONS |
| LGF BATHROOM BUILDING RENOVATION_ARCHITECTURAL DESIGN DRAWINGS-SCHEDULES |
| LGF BATHROOM BUILDING RENOVATION_ARCHITECTURAL DESIGN DRAWINGS-NEW ELEVATION (2) |
| LGF BATHROOM BUILDING RENOVATION_ARCHITECTURAL DESIGN DRAWINGS-NEW ROOF (2) |
| LGF BATHROOM BUILDING RENOVATION_ARCHITECTURAL DESIGN DRAWINGS-NEW ROOF |
File details come from the government source that posted it. Updated .