About this file

This is a technical schematic and design document for Fire Protection Pump Stations prepared by the Department of the Air Force for facilities at Tinker Air Force Base, Oklahoma City, Oklahoma.

The document presents two detailed isometric drawings of fire protection pump station configurations. The upper drawing (B 2113, No Scale) illustrates a fire pump station design with labeled components including pump assembly, suction and discharge manifolds, and various piping connections. The notation indicates all materials shall have an 8-inch suction flanged connection and 6-inch discharge connection, with the contractor responsible for furnishing and installing necessary material for mounting through pump selected by existing steel beams. The lower drawing (B 3202, No Scale) depicts an alternative fire protection pump station configuration with similar pump components, suction/discharge piping, and a ground-level water supply connection. The schematic indicates this configuration requires the contractor to furnish and install a drive coupling to existing diesel engine on existing diesel engine. Both designs show internal pump systems, control mechanisms, and connection points for water supply and discharge systems. The document is marked as "As Built 18 Jan 66" and indicates "New Work" sections, suggesting this represents completed construction specifications for Air Force facilities. The technical drawings serve as design and installation reference documentation for fire protection infrastructure at the designated military installation.

View the file

Other files

File Type Posted
240176_ROUND 3_PRE BID RFIs_For Signature 2 - COR Signed.pdf PDF
240176_Site Visit Sign In.pdf PDF
SOW Att 02a_Controlled Area Training.pptx PPTX presentation
240176_ATT 11_Submittal Register.pdf PDF
240176_Final_ Plan Set.pdf PDF
WWYK143004_CU502.pdf PDF
WWYK143004_CU513.pdf PDF
WWYK143004_CU501.pdf PDF
WWYK143004_CU505.pdf PDF
20090026A.pdf PDF
B02119.txt TXT text file
690255.pdf PDF
480211.pdf PDF
Combined As-Built Record Dwgs.pdf PDF
FIRE SUPPRESSION GEODESIC SHOP DRAWINGS AS-BUILTS.pdf PDF
2025 TAFB Mechanical Standard_Signed.pdf PDF
01 33 00.pdf PDF
01 33 16.00 10.pdf PDF
01 32 16.00 20.pdf PDF
tinkerafb_INRMP.pdf PDF
afman32-7003.pdf PDF
afman48-148.pdf PDF
dafi13-213_tinkerafbsup.pdf PDF
017800_Attch1_DD1354.pdf PDF
007200_Attch14_Information for New Boilers.pdf PDF
017800_Attch2_DD1354 Checklist.docx DOCX document
007200_Attch9_EMS Awareness Training.pdf PDF
Wage Determination - 18 May 2026.pdf PDF
240176_ATT10_Design_Narrative.pdf PDF
240176_ATT12_ Drawings.pdf PDF
240176_Amendment 1 Drawings.pdf PDF
240176_ATT 3_Green Procurement Statement.pdf PDF
SOW Att 02c_Controlled Area Training - Certificate.pdf PDF
SOW Att 01_Appointment of Security Representative Template 496.docx DOCX document
02122M-EQ01.pdf 2024.pdf PDF
1993_IndWaste.pdf PDF
1994_IndWaste.pdf PDF
Industrial Waste Distribution East of 18_36.pdf PDF
WWYK143004_CU514.pdf PDF
WWYK143004_CU509.pdf PDF
WWYK143004_CU512.pdf PDF
WWYK143004_CU510.pdf PDF
WWYK921223.pdf PDF
02119A-FP01-Model.pdf PDF
610080.pdf PDF
581021.pdf PDF
2020 TAFB Facility Standard.pdf PDF
2023 TAFB Fire Protection Standard.pdf PDF
00 70 00.pdf PDF
01 50 00.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

02119A1 710237-01

File details come from the government source that posted it. Updated .