This document is an Amendment to Solicitation No. 70Z0G125BSYN00190 issued by the U.S. Coast Guard for the "REPAIR BUOY YARD" construction project. The amendment addresses questions received from potential offerors, clarifying that one original signed SF1442 and one copy must be submitted, and that the fillable table in Section I.9 FAR 52.225-9 should be completed if applicable. The Solicitation is for a construction project to perform a topographic survey, demolish and relocate existing site elements, regrade and repave the Buoy Yard, and install new fencing, landscaping, and other site improvements. The work will be performed in two phases to allow continued Coast Guard access during construction. Mobilization is scheduled for April 2025 at the earliest to accommodate cold weather requirements. This is a non-standardized Coast Guard requirement.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 17.a ABSTRACT OF OFFERS IFB 70Z0G125BSYN00190.pdf | ||
| 12i SF30 - Amendment 00009.pdf | ||
| 12g SF30 - Amendment 00008 11-29-24.pdf | ||
| 12f SF30 - Amendment 00007.pdf | ||
| 12f Attachment 1 - List of Attendees (Amendment 00006).pdf | ||
| 12f SF30 - Amendment 00006.pdf | ||
| 12e SF30 - Amendment 00005.pdf | ||
| 12d SF30 - Amendment 00004.pdf | ||
| 12b SF30 - Amendment 00002.pdf | ||
| 12b SF30 - Amendment 00001.pdf | ||
| SF24-23a Bid Bond Form.pdf | ||
| 12a IFB 70Z0G125BSYN00190.pdf | ||
| 3c Drawing P16191810.pdf | ||
| 3c Specifications.pdf | ||
| 7n Wage Determination NJ20230054 9-6-24.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO.
00003
3. EFFECTIVE DATE
11/8/2024
4. REQUISITION/PURCHASE REQ.
5. PROJECT NO. (If applicable)
16191810
6. ISSUED BY CODE 51283 7. ADMINISTERED BY (If other than Item 6) CODE 51283
Contracting Officer USCG Civil Engineering Unit Providence 475 Kilvert St., Suite 100 Warwick, RI 02886
8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTY, STATE AND ZIP CODE)
TO ALL POTENTIAL OFFERORS
AMENDMENT MUST BE ACKNOWLEDGED
9A. AMENDMENT OF SOLICITATION NO.
70Z0G125BSYN00190
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE 834953036 FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[ ] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET
FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (SPECIFY TYPE OF MODIFICATION AND AUTHORITY)
E. IMPORTANT: Contractor is not, is required to sign this document and return __ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this Amendment 00003 is to address questions submitted as follows:
Q6. The SF1442, block 13 indicates an Original and one copy must be submitted. However, the cover page indicates to sign and return one original. Can the government please clarify if one copy is required?
A6. Please sign and submit the Original SF1442 and one signed copy.
(Continued on Page 2)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or Print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED
16B UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-8070 STANDARD FORM 30 (Rev. 10-83) PREVIOUS EDITION UNUSABLE Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 00003 November 7, 2024
Q7. The first page of the Invitation for Bid states that “Sign and return ONE original of the entire solicitation form (see SF 1442, Section B, Section I and Section K for applicable fill-in information).” However, Section I does not include any areas for offeror completion or fill-in. Please confirm if this section should be included in it’s entirety, without any fill-ins.
A7. Referencing Section I, Section I.9 FAR 52.225-9 BUY AMERICAN – CONSTRUCTION MATERIALS (OCT 2022), a fillable table exists on Page 25 entitled “Foreign and Domestic Construction Materials Price Comparison” which, if applicable, should be completed.
(End)