This document contains an amendment to a solicitation and a pre-solicitation notice for a federal contract opportunity. The amendment provides responses to requests for information received regarding a requirement for pre-dredge and post-dredge eelgrass surveys for a maintenance dredging project at the U.S. Coast Guard Station Noyo River in Fort Bragg, California. The surveys must document potential effects on adjacent eelgrass beds and be conducted by a qualified firm in accordance with NOAA standards. The pre-solicitation notice provides additional details on the dredging and disposal services sought for this location between $500,000 to $1,000,000. Interested offerors should monitor the federal business opportunities portal for solicitation availability on or around May 25, 2020, with bids due June 25, 2020 to the U.S. Coast Guard Civil Engineering Unit in Oakland. The selected contractor will be responsible for management, labor, equipment, transportation, disposal site furnishing, and all other efforts to complete the dredging in accordance with specifications.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable) 0006 03 July 2020
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE Contracting Officer USCG CEU Oakland 1301 Clay Street 7th Floor, Suite 700N Oakland, CA 94612-5203
Same as Block 6
8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) 9.A AMENDMENT OF SOLICITATION NO.
ALL PROSPECTIVE OFFERORS
X 70Z08820BPQQ12400
9B. DATE (SEE ITEM 11)
07 July 2020
10A. MODIFICATION OF CONTRACT/ORDER
NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc)
SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority).
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment provide responses to RFIs received (see next page).
Due to the Covid-19 Pandemic, a public bid opening will not be held. A tally of the bids received will be posted in FBO, on the same day of the bid opening.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Guiljohn A. Alcantara
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)PREVIOUS
EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.243
1) The specs call for a pre dredge eel grass survey. Could more detail be provided on why this survey is being requested as well as what information the owner is looking for in the associated reports? What particulars is the owner looking for in the reports?
The pre‐dredge and post‐dredge eelgrass surveys are a requirement per the USCG consultation with NOAA National Marine Fisheries Service, as well as a condition in the Army Corps of Engineers Permit. The reason for the surveys and report are to document the potential effects that the dredging may have on the adjacent eelgrass bed.
The survey requirements are detailed on page 17 of the SOW, Section 01 35 43 Subsection 1.06. The surveys must be completed by a firm qualified to conduct such surveys, and shall comply with the standards established by NOAA’s California Eelgrass Mitigation Policy and Implementing Guidelines (CEMP) (October 2014). The report shall include, at a minimum, calculated square meters of eelgrass in the project and buffer areas; a map that clearly show the location(s) of any eelgrass beds; and a brief discussion of the survey methods, survey results relative to the survey parameters (spatial distribution, aerial extent, percent vegetated cover, and turion density), observation of invasive species (caulerpa sp.), and recommendations. Data recording sheets shall also be included in the report.