A0001 - RFI Response.pdf
PDF 139 KB Posted
- Attached to
- Maintenance Dredging - USCG Station Noyo
- Solicitation number
- 70Z08820BPQQ12400
About this file
This document contains a pre-solicitation notice and request for information for maintenance dredging services at the U.S. Coast Guard Station Noyo River in Fort Bragg, California. The contractor will be required to dredge and dispose of sediment from the mooring area and transport it to an approved upland disposal location using their own equipment and facilities. The estimated value of the contract is between $500,000 to $1,000,000. Interested parties should monitor the FedBizOpps website for the full solicitation to be posted around May 25th, with bids due by June 25th. The work must be completed between July 15th and October 15th. The selected contractor will be responsible for all management, labor, tools, equipment, transportation, permitting, and supervision to perform the dredging and disposal work in accordance with specifications and drawings to be provided with the solicitation. The Davis Bacon Act applies to this project being conducted by the U.S. Coast Guard Civil Engineering Unit in Oakland, California.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable) 0001 19 June 2020
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE Contracting Officer USCG CEU Oakland 1301 Clay Street 7th Floor, Suite 700N Oakland, CA 94612-5203
Same as Block 6
8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) 9.A AMENDMENT OF SOLICITATION NO.
ALL PROSPECTIVE OFFERORS
X 70Z08820BPQQ12400
9B. DATE (SEE ITEM 11)
30 June 2020
10A. MODIFICATION OF CONTRACT/ORDER
NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc)
SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority).
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to provide the following additional information:
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Guiljohn A. Alcantara
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)PREVIOUS
EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.243
1. Can we utilize another dewatering area, at our own finding, instead of the North Jetty Disposal Area?
R: The new location is subject to approval by the COR and Contracting Officer. The new location, at a minimum, must be fully permitted by the US Army Corps of Engineers and the Regional Water Board.
2. What is the estimated start date of this project?
R: The project starts at the time of the award. We are authorized to dredge between 15July to 15October. For actual dredging, the rough estimate is 5 weeks from the time of award, assuming: that we do a kick off meeting (within 5 days of award), do the pre-dredge hydrographic survey (up to contractor to set up- could be 1-2 weeks after award), submit a pre-dredge plan to the agencies (20 days before dredge), and get approval to dredge (1-2 weeks after submittal of dredge plan to agencies).