USCG REGIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT (RMACC III)
Solicitation number
70Z08725RRMACC003
Issued by

About this file

This document is a Request for Proposals (RFP) for the U.S. Coast Guard's Regional Multiple Award Construction Contracts (RMACC III), a multi-regional indefinite delivery/indefinite quantity (IDIQ) construction contract. The solicitation seeks up to ten small business contractors for each of nine geographic regions across the United States, with contract values ranging from $2,000 to $10-20 million per task order and an anticipated aggregate capacity of $4 billion. The contracts will be set aside for specific small business socioeconomic programs, including 8(a), HUBZone, Service-Disabled Veteran-Owned Small Businesses (SDVOSB), and total small businesses, with each region having a designated socioeconomic category.

The contract will have a three-year base period with two two-year option periods, potentially totaling seven years. Contractors will perform construction services including real property repairs, maintenance, general construction, marine construction, demolition, historical restoration, and remediation across various facility types such as operations buildings, hangars, boat houses, firing ranges, and waterfront facilities. The procurement will be conducted in two phases, with Phase I focusing on evaluating contractors' corporate experience, past performance, regional management capabilities, technical capabilities, and safety records. Proposals for different regions are due between October 30 and December 4, 2025, with an anticipated contract award in May 2026. The contract will be awarded to contractors who demonstrate the most highly qualified capabilities in each region.

View the file

Other files

File Type Posted
AMEND0012_70Z08725RRMACCIII.pdf PDF
REV2 Solicitation USCG RMACC III 12-19-2025.pdf PDF
AMEND0011_70Z08725RRMACCIII.pdf PDF
AMEND0010_70Z08725RRMACCIII_12-4-2025.pdf PDF
AMEND0009_70Z08725RRMACCIII.pdf PDF
AMEND0008_70Z08725RRMACCIII.pdf PDF
AMEND0007_70Z08725RRMACCIII.pdf PDF
AMEND0006_70Z08725RRMACCIII.pdf PDF
AMEND0006_70Z08725RRMACCIII.pdf PDF
AMEND0005_70Z08725RRMACCIII_10-27-2025.pdf PDF
REV RMACC III ATTACHMENT A.xlsx XLSX spreadsheet
REV RMACC III ATTACHMENT B.docx DOCX document
AMEND0004_70Z08725RRMACCIII.pdf PDF
AMEND0003_70Z08725RRMACCIII_RFIs_Extend.pdf PDF
AMEND0002_70Z08725RRMACCIII.pdf PDF
AMEND0001_70Z08725RRMACCIII.pdf PDF
REV Solicitation USCG RMACC III 10-1-2025.pdf PDF
RMACC III ATTACHMENT A.xlsx XLSX spreadsheet
RMACC III ATTACHMENT B.docx DOCX document
RMACC III ATTACHMENT C.docx DOCX document
Consolidated QA for RMACC III.pdf PDF
Draft Solicitation USCG RMACC III.pdf PDF
USCG Set Aside Table.pdf PDF
USCG Region-District Map.pdf PDF
ATTACHMENT B SOURCES SOUGHT CONTRACTING INFO FORM_11-13-2024.pdf PDF
ATTACHMENT A RMACC III SOURCES SOUGHT NOTICE_11-13-2024.pdf PDF
ATTACHMENT A RMACC III SOURCES SOUGHT NOTICE V2_10-10-2024.pdf PDF
ATTACHMENT A RMACC III SOURCES SOUGHT NOTICE_10-10-2024.pdf PDF
ATTACHMENT B SOURCES SOUGHT CONTRACTING INFO FORM_10-10-2024.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSALS 70Z08725RRMACCIII

INDEFINITE DELIVERY/INDEFINITE QUANTITY REGIONAL

MULTIPLE AWARD CONSTRUCTION CONTRACTS (RMACC)

AT

VARIOUS DEPARTMENT OF HOMELAND SECURITY (DHS)

FACILITIES THROUGHOUT THE UNITED STATES AND TERRITORIES

Table of Contents

Section Description Page

PART I – THE SCHEDULE

A Introduction and Solicitation/Contract Form

3-7

B Supplies or Services and Prices/Costs 8 C Description/Specs/Work Statement 9-11 D Packaging and Marking 12 E Inspection and Acceptance 12-14 F Deliveries or Performance 15-19 G Contract Administration Data 20-23 H Special Contract Requirements 24-35

PART II – CONTRACT CLAUSES

I Contract Clauses 36-79

PART III – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

J Attachments 80-88

PART IV – REPRESENTATIONS AND INSTRUCTIONS

K Representations, Certifications And

Other Statements Of Offerors 89-95

L Instructions, Conditions And Notices To Offeror

96-106

M Evaluation Factors for Award 107-114

SECTION A

INTRODUCTION AND

SOLICITATION/CONTRACT FORM

The U.S. Coast Guard (USCG), United States Coast Guard (USCG), Program Executive Office (PEO) - Shore Infrastructure (CG-SHORE) Contracting Office, has determined the need to re-procure a suite of up to ten Indefinite Delivery Indefinite Quantity (IDIQ) Regional Multiple Award Construction Contracts (RMACCs) to perform construction on a regional basis nationwide. The contracts will be available on a non-mandatory, enterprise-wide basis to all DHS Directorates and Components. The DHS Components include United States Citizen and Immigration Services (USCIS), United States Customs and Border Protection (CBP), United States Coast Guard (USCG), Federal Emergency and Management Agency (FEMA), Federal Law Enforcement Training Center (FLETC), United States Immigration and Customs Enforcement (ICE), Transportation Security Administration (TSA), and United States Secret Service (USSS).

The contracts will meet the majority of the DHS infrastructure needs for maintenance, repair, and construction for all projects with a maximum value, as determined by each RMACC $10M and possibly up to $20M in Artic District within the 50 United States and its territories. These contracts are intended to provide prompt responses on an as-needed basis for routine and emergent requirements. The contracts offer a streamlined approach to construction contracting and ongoing competition between qualified contractors.

The scope of work will include real property repairs, maintenance, and general construction, marine construction, demolition, historical restoration, and remediation. Facilities include, but are not limited to, operations buildings, hangars, boat houses, firing ranges, residential and light commercial buildings and their mechanical and electrical systems, site utilities, waterfront facilities, electronic surveillance/security construction, dredging, and airports/runways. Design- Build including One-Step Turnkey, and Design/Bid/Build project or other delivery methods will be used.

Each of the resulting contracts will be aligned with a specific geographical region corresponding to Coast Guard Districts. A map of the Coast Guard Districts has been provided in the files accompanying this notice. A separate contract will cover the United States territories within the Region of Caribbean and Puerto Rico (Contract Region 7.5) which is a part of Coast Guard District 7. Contract Regions 11 and 13 will be combined as they were on the predecessor RMACC. A regional map is depicted below:

Note renamed Districts as follows:

Identification in RFP* Previous Name July 2025 Name Change Region 1 District 1 USCG Northeast District Region 5 District 5 USCG East District

Region 7/7.5 District 7/7.5 USCG Southeast District** Region 8 District 8 USCG Heartland District Region 9 District 9 USCG Great Lakes District Region 11 District 11 USCG Southwest District Region 13 District 13 USCG Northwest District Region 14 District 14 USCG Oceania District Region 17 District 17 USCG Arctic District

*For the purposes of this solicitation, the Districts will be referred to as Region and by Number. Task orders may include the July 2025 name change.

The Coast Guard has six different Civil Engineering Units (CEUs). Each of the CEUs is aligned with one or two of the Coast Guard Districts. Each CEU will award and administer the contracts for the regions that correspond with the District(s) to which they are aligned. After the contract award, the ordering authority and ordering procedures will be provided to all DHS components.

All contract awards will be based on a single solicitation. The solicitation will prescribe phased proposal due dates for each regional contract. Offerors will submit a separate proposal for each regional contract to the CEU assigned to conduct the procurement. The terms and ordering procedures of each contract will be uniform among the resulting contracts, in the manner of promoting a standardized method of delivery. The evaluation factors for each region will be uniform and a single source selection authority will take responsibility for all contract awards that stem from the solicitation; but separate source selection teams will be formed to evaluate each regional contract.

Pre-proposal inquiries will be reviewed programmatically, and any amendments will be issued to the solicitation as required. Any protests received after close of the solicitation will be directed in a manner to allow ongoing efforts to continue, where possible. For instance, in the case of a protest related to a specific regional contract, it is our intention to resolve these matters at the regional contract level, in order to isolate any delays to the regional contract that is under protest.

In essence, each regional award decision will be considered a separate source selection.

Each Regional Multiple Award Construction Contract is set aside for contractors in one or more small business socioeconomic programs. Each of the contracts will include a three-year (3) base period and two (2) two-year (2) option periods. Task order limits generally range from $2,000 to $10M for Regions 1, 5, 7, 7.5, 8. 9. 11/13 and 14; Region 17 task order limits are $2,000 to $20M. As previously noted, ordering authority will be available to any Department of Homeland Security components with appropriate construction warrant authority. The minimum guarantee for each individual contract will be $5,000. The anticipated aggregate capacity for new regional RMACCs is $4 Billion. Approximately ten individual contracts (individual contractors) are anticipated for each region.

Following is a table showing the CEU assignment and the socioeconomic program set aside:

RMACC Contract Region Regional CEU Contract Set-Aside

Region 1 (USCG Northeast District, formerly District 1) CEU Providence 8(a)

Region 5 (USCG East District, formerly District 5) CEU Cleveland SDVOSB Region 7 (USCG Southeast District, formerly District 7) CEU Miami 8(a) Region 7.5* (USCG Southeast District, formerly District 7.5) CEU Miami To Be

Determined Region 8 (USCG Heartland District, formerly District 8) CEU Miami HUBZone Region 9 (USCG Great Lakes District, formerly District 9) CEU Cleveland 8(a) Region 11 / 13 (USCG Southwest/Northwest District, formerly District 11/13) CEU Oakland SDVOSB

Region 14** (USCG Oceania District, formerly District 14) CEU Honolulu 8(a) Region 17 (USCG Artic District, formerly District 17) CEU Juneau Total Small

Business *Note on Region 7.5: Puerto Rico & U.S. Virgin Island socioeconomic set-aside will be determined following additional market research conducted via SAM.gov posting September 2025. An amendment to the RMACC III solicitation will be issued to announce the determination and provide RFP response due dates.

**Note on Region 14: Guam is included in this region

SOLICITATION,

OFFER, AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NUMBER

70Z08725RRMACCIII

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

09/29/2025

PAGE OF PAGES

6 114

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SEE SECTION L United States Coast Guard CG-SHORE Contracting 709 W 9th St, Rm. 817 Juneau, AK 99801

9. FOR INFORMATION

CALL:

a. NAME

Cheryl Berry

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

206-815-5287

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

Department of Homeland Security Regional Multiple Award Construction Contracts (RMACC)

North American Industry Classification System Code (NAICS) 236220 Commercial and Institutional Building Construction Small Business Size Standard: $45M

Each Regional Multiple Award Construction Contract is set aside for contractors in one or more small business socioeconomic programs. It is anticipated that up to ten Regional Multiple Award Indefinite Delivery Indefinite Quantity (IDIQ) contracts will be awarded from this single solicitation.

Term of IDIQ Contracts: a three-year (3) base period and two (2) two-year (2) option periods. (potentially totaling 7 years).

Two-Phase Design-Build Selection Procedures outlined in FAR Subpart 36.3 will be used for this procurement. Those offerors selected as most highly qualified during Phase I will receive the requirements and wage determination for a regional seed project as part of Phase II.

Site Visit information for regional seed projects will be provided during Phase II.

The RMACC is being issued as a single solicitation. Offerors will need to submit unique proposals for each region they wish to be considered for. Proposal submission procedures are described in Section L.

11. The contractor shall begin performance within 15 calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See ) .

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

12b. CALENDAR DAYS

a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

b. An offer guarantee is, X is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than 180 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

STANDARD FORM 1442 (REV. 8/2014)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d)

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in

Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA

BY

31c. DATE

STANDARD FORM 1442 (REV. 8/2014) BACK

AMOUNTS

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

B.1. Construction This contract will require general construction as defined by individual task orders. Work to be performed may include but is not limited to structural, civil, mechanical, electrical, environmental, architectural, and other specialized services.

The Contractor shall provide all resources necessary to delivery and/or perform each task order, in accordance with the Statement of Work (SOW), specifications and/or drawings called for by individual task orders when issued

B.2. Type of Contract

Regional Multiple Award Construction Contract (RMACC), Indefinite Delivery Indefinite Quantity (IDIQ) Contract, Firm Fixed Price (FFP)

B.3. Indefinite Delivery Indefinite Quantity (IDIQ) Minimum/ Maximum Quantity

• The guaranteed minimum amount of work which will be ordered under each awarded RMACC contract is $5,000.00.

o An Offeror that is awarded a RMACC contract and is subsequently awarded a Task

Order, within the 7-year period of performance, will meet this guaranteed minimum amount of work.

o All subsequent Task Orders issued under this contract will be Firm Fixed Price (FFP).

o Place of Performance: identified on task order

• The maximum amount of work that may be collectively ordered under all awarded RMACC contracts is $4B for the 7-year period of performance.

CLIN # ITEM UNIT QTY PERIOD OF

PERFORMANCE

0001 Base Period Services

Firm Fixed Price (FFP)

Year 3 TBD

1001 Option Period One Year 2 TBD 1002 Option Period Two Year 2 TBD

B.4. Base and Options (Base Period Three-Year (3) plus two (2) two-year (2) option periods--potentially totaling 7 years)

The initial period of performance for this contract shall be three (3) years from the effective date of this contract. There are two (2) two-year (2) option periods. If exercised, the option period shall be 24 months beginning on the expiration date of the base contract period. If the Government desires to extend the contract after the initial contract period, preliminary notification will be provided to the Contractor in accordance with the clause entitled “Option to Extend the Term of the Contract.”

SECTION C

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C.1. Scope of Work

This DHS-wide contract is intended to provide prompt response on an as-needed basis for regional routine and emergency construction services nationwide. This DHS-wide multiple award contract will meet the majority of DHS’s infrastructure needs for maintenance, repair, and construction for projects with a value up to $10M regions 1, 5, 7, 7.5, 8, 9, 11/13 & 14 and up to $20M in region 17 within the 50 United States and its territories. This contract is a re-compete of the current Regional Multiple Award Construction Contract (RMACC II). The multiple award contract offers a streamlined approach to construction contracting and ongoing competition between qualified contractors. The RMACC is set aside for contractors in one or more of the following small business socioeconomic programs: Total Small Business, Historically Underutilized Business Zone (HUBZone), certified Small Disadvantaged Businesses under the Small Business Administration’s 8(a) Program, or Service-Disabled Veteran Owned Small Business (SDVOSB).

The project delivery methods include Design-Build, including One-Step Turnkey, and Design/Bid/Build. The scope of work will include real property repairs, maintenance, and general construction, marine construction, demolition, historical restoration, and remediation.

Facilities include, but are not limited to, operations buildings, hangars, boat houses, firing ranges, residential and light commercial buildings and their mechanical and electrical systems, site utilities, waterfront facilities, electronic surveillance/security construction, dredging, and airports/runways.

The contract awardees under this procurement shall be able to provide all necessary personnel, facilities, equipment, and materials for multiple and concurrent task orders within the respective regions across the United States and its territories. The contract awardees shall provide these construction services across the entire awarded region at all USCG installations, across all urban and remote locations. The firm shall ensure that all activities performed by its personnel, subcontractors and suppliers are executed as required in compliance with all applicable environmental and safety laws and regulations and will meet all relevant, appropriate, and applicable standards. Specific requirements will be detailed in each task order general requirements, specifications, and drawings. The description of these requirements will vary for each acquisition dependent upon the needs of the requiring entity. Projects will include a variety of assignments involving the U.S. Department of Homeland Security (DHS) and Components within DHS.

RMACC contractors should have Design-Build capabilities; however, it should be noted that the Coast Guard is expected to place the majority of orders on the contract and the Coast Guard does not intend to routinely use the RMACC for projects that require complex or collaborative designs that are difficult to forward price, require lengthy review processes, or require significant expense for the presentation of a proposal. Instead, the Coast Guard intends that the majority of the work on the RMACC will utilize the Design/Bid/Build project delivery method or the One- Step (Design-Build) Turnkey delivery method for which the Coast Guard has special statutory authority (See 14 USC 677). The One-Step Turnkey process on this contract will entail selection of a contractor through the fair opportunity process on the basis of price or price in combination with other evaluation criteria to perform, in accordance with the provisions of a firm fixed price contract, both the design and construction of a facility using performance specifications.

When utilizing this process, the Coast Guard will be sensitive to any advanced design costs necessary to offer a proposal and will attempt to minimize or eliminate these costs by restricting the One-Step Turnkey process to only non-complex design that can be easily coordinated between the contractor and designer and approved through a contract submittal process.

The intent of this contract is that all RMACC Contractors participate in pre-proposal conferences and site visits and submit proposals for each task order. Contract awardees will be expected to submit a proposal for all Task Order Requests for Proposal (RFP) received from the Government. However, in the event an RMACC awardee is unable to submit a proposal on a particular RFP, the contractor is required to notify, in writing, the Contracting Officer who issued the RFP and the ACO for the basic contract within five (5) working days from receipt of the RFP. The USCG understands Small Business concerns and will consider each notification from awardees declining to propose on a project; however, the Government reserves the right to off-ramp or select to not exercise any option period for a RMACC awardee that does not submit a proposal on three (3) task order RFPs during the course of each year of the contract. It is the onus of the contractor to provide sufficient rationale for declining to propose on a project.

C.2. Applicable Publications

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

ENVIRONMENTAL PROTECTION AGENCY (EPA) REGULATIONS:

16 CFR 1303 Ban of Lead-Containing Paint and Certain Consumer Products Bearing

Lead- Containing Paint 40 CFR 61 National Emission Standards for Asbestos

40 CFR 112 Oil Pollution Prevention

40 CFR 136-143 Water Programs 40 CFR 204 Noise Emission Standards for Construction Equipment

40 CFR 260-279 Solid Waste Regulations 40 CFR 280-282 Underground Storage Tank Regulations 40 CFR 311-374 Worker Right-to-Know 40 CFR 761 Polychlorinated Biphenyls (PCB)

Manufacturing, Processing, Distribution in Commerce, and Use Prohibitions

U.S. DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH

ADMINISTRATION (OSHA) REGULATIONS:

29 CFR 1910 Worker Safety Requirements 29 CFR 1926.62 Lead 29 CFR 1926.1101 Asbestos

U. S. DEPARTMENT OF TRANSPORTATION REGULATIONS:

49 CFR 100-199 Hazardous Materials Transportation, Handling, and Storage Regulations COMDTINST M6260.16 U.S. Coast Guard Asbestos Exposure

Control Manual

COMDTINST M5100.47 U.S. Coast Guard Safety and Environmental Health Manual

C.3. Reference Statutes The statutes listed below form a part of this specification to the extent referenced.

Clean Air Act (CAA) (42 U.S.C.7401 to 7642)

Clean Water Act (33 U.S.C. 1251 to 1387)

Safe Drinking Water Act (SDWA)

Coastal Zone Management Act (CZMA)

Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (42 U.S.C. 9601 to 9675)

Emergency Planning and Right-to-Know Act (EPCRA)

Endangered Species Act (ESA)

Energy Independence and Security Act of 2007 (EISA)

Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) (7 U.S.C. 136 to 139y) National Historic Preservation Act (NHPA)

Noise Control Act (NCA) (42 U.S.C. 4901 to 4918)

Pollution Prevention Act (PPA) - (42 U.S.C. 13101 to 13109)

Residential Lead-Based Paint Exposure Reduction Act (15 U.S.C. 2681 to 2692) Resource Conservation and Recovery Act (RCRA) (42 U.S.C. 6901 to 6991i)

Solid Waste Disposal Act (SWDA) - (42 U.S.C. 6901 to 6991i) Toxic Substance Control Act (TSCA) (15 U.S.C. 2601 to 2654)

SECTION D

PACKAGING AND MARKING

D.1. Packaging And Marking

All shipments of materials, equipment and/or supplies to the project site shall be addressed to the Contractor and not the Government. Preservation, packaging and packing shall be in accordance with standard practices for commercial packaging.

Government personnel are not authorized to accept deliveries for the contractor, nor are they responsible for off-loading shipments. A contractor’s representative must be present to accept deliveries.

All emails shall be marked in a logical manner with the Contract number appearing in the subject line. Emails associated with any resulting Task Order may use an abbreviated Task Order number in the subject line. These will vary by region, and the Contract Specialist will confirm abbreviated task order number during Post- Award Conference.

SECTION E

INSPECTION AND ACCEPTANCE CONSTRUCTION

E.1. FAR Clauses by Full Text:

52.246-12 Inspection of Construction (AUG 1996)

(a) Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

Government inspections and tests are for the sole benefit of the Government and do not- Relieve the Contractor of responsibility for providing adequate quality control measures;

Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

Constitute or imply acceptance; or Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.

The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.

The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge the Contractor for any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

If the Contractor does not promptly replace or correct rejected work, the Government may-

By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or Terminate for default the Contractor's right to proceed.

If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.

E.2. Daily Reporting Requirement

The Contractor shall prepare and file a "Contractor's Daily Report", for each day of contract performance. Description must include task order numbers and work being performed. These reports shall be delivered to, or if directed, e-mailed to the USCG Construction Project Manager (CPM) or Contracting Officer’s Representative (COR) on Fridays. The daily report shall include the name of Contractors and Subcontractors on-site, the number of workers and their labor categories employed on- site, the work being performed, the type of equipment on-site, any change order work being performed, and whether the work being performed is on schedule.

Reports shall be numbered, dated and signed by the Contractor or his Project Manager. Failure to submit the daily reports could result in payments being withheld until such time as all daily reports are current.

E.3. Final Inspection

A Contracting Officer's Representative (COR) to represent the Contracting Officer and inspect all work under the contract will be designated in writing as needed on an individual task order basis. In no instance is the COR authorized to sign contractual documents, order contract changes, modify contract terms, or create any liability on the part of the Government different from that set forth in the contract.

The Contracting Officer's Representative (COR) is authorized to issue Notices regarding non-compliance with contract/task order requirements. Issuing of a Notice of Non-compliance as described herein does not constitute a suspension of work as described in Clause 52.212-12, Suspension of Work.

Contractor Self-Inspection. Prior to the completion date of each task order, the Contractor’s Quality Control Manager shall conduct a self-inspection of the site and document all items needing correction by means of a punch list. The corrected punch list shall be provided to the Contracting Officer’s Representative at the same time the pre-final inspection is requested. All punch list items must be corrected prior to requesting the pre-final inspection.

The Contractor and the Contracting Officer’s Representative will jointly conduct a pre-final inspection prior to requesting a final inspection. Any item needing correction shall be noted on the Pre-Final Inspection Punch List. Any discrepancies noted will be corrected prior to any final inspection. The Contracting Officer Representative may schedule more than one pre-final inspection if he determines it necessary.

When the Contractor is ready for final inspection, they will request final inspection in writing to the Contracting Officer and Contracting Officer’s Representative (COR). A copy of the Pre-Final Punch List shall be attached to this request with the corrective action taken noted. The final inspection will be requested at least 48 hours before the desired date.

The final inspection shall be performed with the Contractor by the COR, Contracting Officer, Safety Officer, and representatives of the using activity. Any discrepancies noted will be corrected within the time specified in each task order for the completion of work.

Prior to close-out and final payment of each task order, the following are required:

• All submittals. To be submitted as required by each task order and may include product submittals, as- built drawings, manuals, etc.

• All warranties. To be submitted with the request for Final Inspection.

• Contractor’s Release: To be submitted with the Contractor’s final invoice.

SECTION F

DELIVERIES AND PERFORMANCE

F.1 Commencement, Prosecution and Completion of Work

The Contractor shall be required to commence work under this contract within ten calendar days after the date the Contractor receives the notice to proceed, prosecute the work diligently, and complete the entire work ready for use not later than the time stated in each individual task order.

The time stated for completion shall include final cleanup of the premises.

F2. Variation in Estimated Quantity

If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract.

Upon receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgment of the Contracting Officer, is justified.

F.3 FAR Clauses

52.211-12 Liquidated Damages - Construction (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the

Contractor shall pay liquidated damages to the Government in the amount of (each task order may specify the amount of liquidated damages) for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

52.211-13 Time Extensions (SEP 2000)

Time extensions for contract changes will depend upon the extent, if any, by which the changes cause delay in the completion of the various elements of construction. The change order granting the time extension may provide that the contract completion date will be extended only for those specific elements related to the changed work and that the remaining contract completion dates for all other portions of the work will not be altered. The change order also may provide an equitable readjustment of liquidated damages under the new completion schedule.

52.236-15 Schedules for Construction Contracts (APR 1984)

(a) The Contractor shall, within five days after the work commences on the contract or another period of time determined by the Contracting Officer, prepare and submit to the Contracting Officer for approval three copies of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work (including acquiring materials, plant, and equipment). The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period. If the Contractor fails to submit a schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the Contractor submits the required schedule.

(b) The Contractor shall enter the actual progress on the chart as directed by the Contracting

Officer, and upon doing so shall immediately deliver three copies of the annotated schedule to the Contracting Officer. If, in the opinion of the Contracting Officer, the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to improve its progress, including those that may be required by the Contracting Officer, without additional cost to the Government. In this circumstance, the Contracting Officer may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules in chart form as the Contracting Officer deems necessary to demonstrate how the approved rate of progress will be regained.

(c) Failure of the Contractor to comply with the requirements of the Contracting Officer under this clause shall be grounds for a determination by the Contracting Officer that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the Contractor's right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.

52.236-21 Specifications and Drawings for Construction (AUG 2025) (DEVIATION 25-15)(ALT I)

(a) The Contractor shall keep at the site a copy of the drawings and specifications and shall at all times give the Contracting Officer access thereto.

(b) Anything mentioned in the specifications and not shown on the drawings or shown on the drawings and not mentioned in the specifications, shall be of like effect as if shown or mentioned in both.

(1) In case of difference between drawings and specifications, the specifications shall govern.

(2) In case of discrepancy in the figures, in the drawings, or in the specifications, the matter shall be promptly submitted to the Contracting Officer, who shall promptly make a determination in writing.

(3) Any adjustment by the Contractor without such a determination shall be at its own risk and expense.

(c) The Contracting Officer will furnish from time to time such detailed drawings and other information as considered necessary, unless otherwise provided.

(d)(1) Words, such as, “directed”, “required”, “ordered”, “designated”, “prescribed”, or words of like import when used, in the specifications or on the drawings are intended to mean the “direction”, “requirement”, “order”, “designation”, or “prescription”, of the Contracting Officer.

(2) Words, such as, “approved”, “acceptable”, “satisfactory”, or words of like import shall mean “approved by”, or ‘acceptable to”, or “satisfactory to” the Contracting Officer, unless otherwise expressly stated.

(e) Where “as shown”, “as indicated”, “as detailed”, or words of similar import are used, it shall be understood that the reference is made to the drawings accompanying this contract unless stated otherwise. The word “provided” as used herein shall be understood to mean “provide complete in place”, that is “furnished and installed”.

(f) Shop drawings means drawings, submitted to the Government by the Contractor, subcontractor, or any lower tier subcontractor pursuant to a construction contract, showing in detail (1) the proposed fabrication and assembly of structural elements and (2) the installation (i.e., form, fit, and attachment details) of materials or equipment. It includes drawings, diagrams layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials furnished by the contractor to explain in detail specific portions of the work required by the contract. The Government may duplicate, use, and disclose in any manner and for any purpose shop drawings delivered under this contract.

(g)(1) This contract requires shop drawings, the Contractor shall coordinate all such drawings, and review them for accuracy, completeness, and compliance with contract requirements and shall indicate its approval thereon as evidence of such coordination and review. Upon completing the work under this contract, the Contractor shall furnish a complete set of all shop drawings as finally approved. These drawings shall show all changes and revisions made up to the time the equipment is completed and accepted.

(2) Shop drawings submitted to the Contracting Officer without evidence of the Contractor's approval may be returned for resubmission.

(h) The Contracting Officer will indicate an approval or disapproval of the shop drawings and if not approved as submitted shall indicate the Government's reasons therefor.

(1) Any work done before such approval shall be at the Contractor's risk.

(2) Approval by the Contracting Officer shall not relieve the Contractor from responsibility for any errors or omissions in such drawings, nor from responsibility for complying with the requirements of this contract, except with respect to variations described and approved in accordance with paragraph (i) of this clause.

(i)(1) If shop drawings show variations from the contract requirements, the Contractor shall describe such variations in writing, separate from the drawings, at the time of submission.

(2) If the Contracting Officer approves any such variation, the Contracting Officer will issue an appropriate contract modification, except that, if the variation is minor or does not involve a change in price or in time of performance, a modification need not be issued.

(j) The Contractor shall submit to the Contracting Officer for approval four copies (unless otherwise indicated) of all shop drawings as called for under the various headings of these specifications. Three sets (unless otherwise indicated) of all shop drawings, will be retained by the Contracting Officer, and one set will be returned to the Contractor.

52.242-14 Suspension of Work (APR 1984)

(a) The Contracting Officer may order the Contractor, in writing, to suspend, delay, or interrupt all or any part of the work of this contract for the period of time that the Contracting Officer determines appropriate for the convenience of the Government.

(b) If the performance of all or any part of the work is, for an unreasonable period of time, suspended, delayed, or interrupted (1) by an act of the Contracting Officer in the administration of this contract, or by the Contracting Officer’s failure to act within the time specified in this contract (or within a reasonable time if not specified), an adjustment shall be made for any increase in the cost of performance of this contract (excluding profit) necessarily caused by the unreasonable suspension, delay, or interruption, and the contract modified in writing accordingly. However, no adjustment shall be made under this clause for any suspension, delay, or interruption to the extent that performance would have been so suspended, delayed, or interrupted by any other cause, including the fault or negligence of the Contractor, or for which an equitable adjustment is provided for or excluded under any other term or condition of this contract.

(c) A claim under this clause shall not be allowed—

(1) For any costs incurred more than 20 days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act involved (but this requirement shall not apply as to a claim resulting from a suspension order); and

(2) Unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of the suspension, delay, or interruption, but not later than the date of final payment under the contract.

F.2. Site Visit & Pre-Construction Conference As standard practice, the United States Coast Guard (USCG) plans to host site visits and pre-construction conferences for all construction projects solicited by CG-SHORE Contracting Offices at Civil Engineering Units. The USCG's commitment to this practice is not contingent on future changes to Federal Acquisition Regulation (FAR) clauses pertaining to these activities.

F.3. Fair Opportunity Procedures

Consistent with FAR 16.505(b), each awardee will be provided with a fair opportunity to be considered for each order exceeding $2,000.00, except as outlined at FAR 16.505(b)(2).

The Contracting Officer has the discretion to determine the submission requirements for each task order. Each request for proposal will clearly outline the proposal requirements and evaluation criteria. The Contracting Officer may elect to use the appropriate evaluation scheme consistent with FAR 16.505 procedures.

F.3. Task Order (TO)

A task order is the contractual instrument issued by the Government to the Contractor to order work. The task order is issued upon agreement between the Government and the Contractor on the scope of work, performance time, and the fixed price for the work. Order for Supplies or Services Form, OF 347, will be issued for each task order.

Orders placed under this indefinite delivery contract shall contain the following information:

• Date of order

• Contract number and task order number

• Item number and scope of work

• Delivery or performance date

• Place of delivery or performance

• Packaging, packing, and shipping instructions

• Accounting and appropriation data

• Bonding requirements

• Any other pertinent information

Modifications to task orders may be required due to differing site conditions, increased scope of work or a decreased scope of work. Modifications are issued pursuant to specific standard clauses contained in the basic contract. If a modification to a task order is required, the Contractor shall submit a detailed cost proposal to include at minimum the following: material cost breakdown, labor rate breakdown, overhead, and profit.

All task orders are subject to the terms and conditions of this contract. In the event of any inconsistency between a task order and this contract, the terms and conditions of this contract shall govern.

In accordance with FAR 52.216-19, the minimum single order amount is:

Region 1: $2,000 - $10,000,000 Region 5: $2,000 - $10,000,000 Region 7: $2,000 - $10,000,000 Region 7.5: $2,000 - $10,000,000 Region 8: $2,000 - $10,000,000 Region 9: $2,000 - $10,000,000 Region 11/13: $2,000 - $10,000,000 Region 14: $2,000 - $10,000,000 Region 17: $2,000 - $20,000,000

The U. S. Coast Guard CG-SHORE Chief of Contracting Office may approve an exception to the minimum and maximum amounts.

F.4. Guaranteed Minimum Amount

In accordance with FAR 52.216-22(b), the guaranteed minimum quantity of work the Government agrees to order during the life of the contract, including any options exercised is $5,000.00.

SECTION G

CONTRACT ADMINISTRATION DATA

G.1. Clauses Incorporated by Reference (Full text of these clauses can be found at https://www.acquisition.gov/ )

52.216-32 Task-Order and Delivery-Order Ombudsman (Sept 2019)

(a) In accordance with 41 U.S.C. 4106(g), the Agency has designated the following task-order and delivery-order Ombudsman for this contract. The Ombudsman must review complaints from the Contractor concerning all task-order and delivery-order actions for this contract and ensure the Contractor is afforded a fair opportunity for consideration in the award of orders consistent with the procedures in the contract. OPAP@uscg.mil and Cheryl.A.Berry@uscg.mil.

(b) Consulting an ombudsman does not alter or postpone the timeline for any other process (e.g., protests).

(c) Before consulting with the Ombudsman, the Contractor is encouraged to first address complaints with the Contracting Officer for resolution. When requested by the Contractor, the Ombudsman may keep the identity of the concerned party or entity confidential, unless prohibited by law or agency procedure.

(End of clause)

G.2. Contract Administration Cheryl A. Berry, Contracting Officer of Program Executive Office (PEO) - Shore Infrastructure (CG-SHORE) Contracting Office (CG-SHORE-CON) at USCG CEU Juneau, telephone

(206) 815-5287, email address Cheryl.A.Berry@uscg.mil will be the contract administrator for this solicitation.

After the award of Regional Multiple Award Construction Contracts, a contract administrator will be assigned from the specific region issuing Indefinite Delivery Indefinite Quantity Contracts. All matters related to the performance of these contracts shall be coordinated by the appointed regional contract administrator.

Region 1 - CEU Providence Region 5 and Region 9 - CEU Cleveland Region 7, Region 7.5 and Region 8 – CEU Miami Region 11 and Region 13 – CEU Oakland Region 14 – CEU Honolulu Region 17 – CEU Juneau

G.3. Address of Correspondence All correspondence shall be issued via email.

https://www.acquisition.gov/ https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section4106&num=0&edition=prelim mailto:OPAP@uscg.mill mailto:Cheryl.A.Berry@uscg.mil mailto:Cheryl.A.Berry@uscg.mil

G.4. Method of Payment

(a) In accordance with FAR Clause 52.232-33 Payment by Electronic Funds Transfer-

- System for Award Management (Oct 2018), payments under this contract shall be made by electronic funds transfer (ETF). Upon award of a contract the contractor shall ensure updated payment information is entered into the System for Award Management (SAM) database at http://www.sam.gov.

(b) Payments will not be made more frequently than once per month on each Task Order.

(c) The Government shall make payments in accordance with FAR 52.232-5 Payments Under Fixed-Price Construction Contracts (MAY 2014).

G.5. Invoices

Invoicing via IPP. The contractor awarded the resulting task order under this proposed IDIQ is required to submit proper invoices associated with the task order award through the Invoice Processing Platform (IPP) at https://www.ipp.gov/.

IPP Customer Support is available to assist users and can answer questions related to accessing IPP.

• Toll-free number: 866-973-3131

• Email address: IPPCustomerSupport@fiscal.treasury.gov

• Hours of operation: Monday through Friday (excluding bank holidays) 8am-6pm ET

Electronic Submission of Payment Requests

(a) Definitions. As used in these instructions -

(1) "Payment request" means a bill, voucher, invoice, or request for contract financing payment with associated supporting documentation. The payment request must: comply with the requirements identified in FAR 32.905(b), "Content of Invoices" and the applicable Payment clause included in this contract. In addition, discount offerings and small business status if available shall be stated. If travel was allowable and approved, components in accordance with FAR 31.205-46 shall be provided.

(c) Except as provided in paragraph (c) of this clause, the contractor shall submit payment requests electronically using the Invoice Processing Platform (IPP).

Information regarding IPP, including IPP Customer Support contact information, is available at www.ipp.gov or any successor site.

(d) The contractor may submit payment requests using a method other than IPP only when the contracting officer authorizes alternate procedures in writing in accordance with Coast Guard procedures.

(d) If alternate payment procedures are authorized, the contractor shall include a copy of the…