REV RMACC III ATTACHMENT B.docx
DOCX document 39 KB Posted
- Solicitation number
- 70Z08725RRMACC003
About this file
Attachment B is an Experience Information Form for the U.S. Coast Guard's Regional Multiple Award Construction Contract (RMACC III). The form is designed for offerors to provide detailed information about a specific project, including a project description, scope, magnitude, problems encountered, design disciplines, construction trades involved, and any industry awards or special recognitions. The form is structured with sections to capture information such as the project's contract number, design disciplines (civil, structural, mechanical, electrical), trade involvement, and a description of designers' roles during the construction phase, specifically for Design-Build projects.
This form is part of a Sources Sought Notice for small businesses interested in performing Design-Build/Design-Bid-Build Indefinite Delivery Indefinite Quantity (IDIQ) construction services across the United States, Puerto Rico, Guam, and the U.S. Virgin Islands. The U.S. Coast Guard is seeking small business concerns, including 8(a) firms, women-owned small businesses, service-disabled veteran-owned small businesses, HUBZone businesses, and joint ventures. The anticipated solicitation release is now projected for prior to September 30, 2025, with an anticipated award in May 2026. The opportunity includes socioeconomic set-asides for different USCG districts, with specific set-aside types varying by region.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVISED ATTACHMENT B
EXPERIENCE INFORMATION FORM
PROJECT No. (Check one): - 1 - 2 - 3 - 4 - 5
| 1 |
| Name of Offeror: |
| 2 |
| Project Title: |
| 3 |
| Contract Number: |
| 4 |
| Description of the Project’s Scope and Magnitude (12-point font): |
| 5 |
| Describe any problems encountered with this project and corrective action taken. (12-point font) |
| 6 |
| List the firm performing the design, design disciplines used and a brief description of the major design components. Complete this question for Design-Build projects only. |
| Discipline |
| Description |
Civil
Structural
Mechanical
Electrical
Other
| 7 |
| Describe involvement of the designers during the construction phase of the job (12-point font) Complete this question for Design-Build projects only: |
| 8 |
| List the most relevant construction trades involved in the project as well as the firm that provided that trade. Also provide a brief description of jobs performed by each trade. |
| Trade |
| Firm |
| Description |
1.
2.
3.
4.
| 9 |
| Attach any copies or photographs of industry awards/special recognitions, etc. received for this project (maximum of one page-this is not included in the 4-page maximum for Attachment B). Photo page may be sent separately due to file size restrictions. |
image1.png image2.png image3.png
File details come from the government source that posted it. Updated .