SOLICITATION DISTRICT 17 ENVIRONMENTAL REMEDIATION SERVICES MULTIPLE AWARD CONTRACT
Solicitation number
70Z08725RJUNE28424423
Issued by

About this file

This document is an Amendment (AMEND 0001) to a Request for Proposal (RFP) for Alaska Environmental Remediation Services Indefinite Delivery/Indefinite Quantity (IDIQ) contract, issued by the U.S. Coast Guard Civil Engineering Unit in Juneau. The amendment addresses five Request for Information (RFI) questions and extends the proposal due date from 11/30/2025 to 12/02/2025. Key changes include removing the Traffic Control Plan requirement from the Site Characterization Work Plan, clarifying the Memorandum of Agreement is for Eldred Rock Light Station, and confirming that project submissions can include standalone Remedial Action or Remedial Action projects incorporated in construction contracts. The amendment references an updated Statement of Work (01_30541698_Eldred_Rock_SI_SOS_Rev1) and directs offerors to Attachment 2.2 Eldred Rock SCR 2015 for additional site characterization details.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMEND 0001 RFP 70Z08725RJUNE28424423

Alaska Environmental Remediation Services IDIQ

Project No. 28424423

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO.

10/10/2025 4. REQUISITION/PURCHASE REQ. NO.

5. PROJECT NO. (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

CONTRACT SPECIALIST

USCG, CIVIL ENGINEERING UNIT JUNEAU

709 WEST 9TH STREET, ROOM 817

JUNEAU, AK 99801

CONTRACTING OFFICER

USCG, CIVIL ENGINEERING UNIT JUNEAU

709 WEST 9TH STREET, ROOM 817

JUNEAU, AK 99801

8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTY, STATE AND ZIP CODE)

9A. AMENDMENT OF SOLICITATION NO.

70Z08725RJUNE28424423

9B. DATED (SEE ITEM 11)

09/30/2025

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET

FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (SPECIFY TYPE OF MODIFICATION AND AUTHORITY)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (ORGANIZED BY UCF SECTION HEADINGS, INCLUDING SOLICITATION/CONTRACT SUBJECT MATTER WHERE FEASIBLE.)

TASK ORDER REQUEST FOR PROPOSAL NO. 70Z08725RJUNE2824423 Alaska Environmental Remediation Services

A. This amendment is issued to answer RFI’s 1-4 and incorporated a revised SOW: 01_30541698_Eldred_Rock_SI_SOS_Rev1

B. PROPOSAL DUE DATES EXTENDED FROM 11/30/2025 to 12/02/2025.

C. PLEASE RETURN A SIGNED COPY OF THIS AMENDMENT WITH YOUR PROPOSAL.

15A. NAME AND TITLE OF SIGNER (Type or Print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Cheryl A. Berry, CONTRACTING OFFICER, USCG

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED

16B UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

AMEND 0001 RFP 70Z08725RJUNE28424423

Alaska Environmental Remediation Services IDIQ

Project No. 28424423

Amend 0001:

Attachments: 01_30541698_Eldred_Rock_SI_SOS_Rev1 Answers RFI Questions 1-5.

RFI Questions:

1. The current due date on the Standard Form 33 states 11/30/2026. Should this be 11/30/2025? If so, that date is Sunday. Is this correct?

Answer 1: RFP Due Date Extended to 12/02/2025.

2. Task 2.1 – Eldred Rock Site Characterization Work Plan, bullet 9 states that a Traffic Control Plan is a required part of the Site Characterization Work Plan.

Traffic control doesn’t seem like it would be an issue on an island. Is this requirement correct?

Answer 2: Not required, removed from Statement of Work. See updated:

01_30541698_Eldred_Rock_SI_SOS_Rev1.

3. Task 4.6 – Memorandum of Agreement (optional). The first sentence refers to the Guard Island Lighthouse which is not one of the light stations mentioned previously in the Statement of Work. Should this be Eldred Rock Sight Station?

Answer 3: Yes, the MOA is for Eldred Rock, Statement of Work updated. See 01_30541698_Eldred_Rock_SI_SOS_Rev1.

4. Section L5.2a states to: “[S]ubmit two (2) projects, for work within Alaska, primarily for Remedial Action or Remedial Action in support of a Construction Project.” Should this state primarily for Remedial Action or Removal Action?

Answer 4: Negative, the intent is to allow submitting standalone Remedial Action projects, or Remedial Action projects incorporated in construction contracts.

5. Please clarify the COCs/COPCs, analytical methods, sample media, and locations requiring additional site characterization for Eldred Rock Light Station, or provide additional GFM where this information is included.

Answer 5: Refer to Attach 2.2 Eldred Rock SCR 2015.