This is a Statement of Work (SOW) and Specifications document for dock-side maintenance and repair services for the USCGC HEALY (WAGB 20), a U.S. Coast Guard icebreaker vessel, during Fiscal Year 2027. The SOW outlines the contractor's responsibility to provide comprehensive maintenance, repair, and modernization services while the vessel is in dock, ensuring operational readiness and compliance with Coast Guard standards.

The scope of work encompasses hull inspection and repair, machinery and propulsion system maintenance, electrical and mechanical systems overhaul, structural modifications, safety system upgrades, and paint/coating applications. The contractor must coordinate with Coast Guard personnel, maintain a qualified workforce with appropriate certifications, and adhere to all applicable federal regulations, environmental standards, and security protocols. Work must be performed at a designated government facility or approved contractor shipyard, with detailed documentation, progress reporting, and quality assurance requirements throughout the project duration. The SOW specifies technical performance standards, compliance with applicable codes and standards, and requirements for scheduling coordination with other government activities. This is a Department of Homeland Security (USCG) solicitation requiring contractors to demonstrate shipyard capabilities, experience with similar vessel maintenance, and the ability to execute complex maritime repair and modernization tasks within defined fiscal year parameters.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC HEALY (WAGB 20)

SPECIFICATION FOR DOCKSIDE REPAIRS

FY2027

Compiled By: Tristan J Hustrulid

(Rev-0, 11 June 2026)

USCGC HEALY (WAGB-420) DOCKSIDE AVAILABILITY FY2027

ii (Rev-0)

TABLE OF CONTENTS

REVISIONS RECORD .............................................................................................................................. iv CONSOLIDATED LIST OF REFERENCES .......................................................................................... v CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY ...................................... xv CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS ......................................................... xix PRINCIPAL CHARACTERISTICS ....................................................................................................... xx General Requirements WORK ITEM 1: Fire Prevention, Provide WORK ITEM 2: Temporary Services, Provide - Cutter WORK ITEM 3: Tenting, Provide (Optional) WORK ITEM 4: Sea Trial Performance, Support, Provide WORK ITEM 5: Recapitalize Science Data Network Infrastructure (SLEP) WORK ITEM 6: Recapitalize CGOne Network Infrastructure (SLEP) WORK ITEM 7: Recapitalize Ice Radar (SLEP) WORK ITEM 8: Impressed Current Cathodic Protection, Upgrade WORK ITEM 9: Oceanographic Winch, Inspect and Test WORK ITEM 10: Scientific and Ocean Engineering Systems, Control System Groom and Indicator

Calibration WORK ITEM 11: Damage Control and Firefighting Systems, PMS WORK ITEM 12: Oily Water Separator, Annual Maintenance WORK ITEM 13: Auxiliary Seawater System (ASW) Orifice Plate, Renew WORK ITEM 14: Aux Diesel Generator Starter (SLEP) WORK ITEM 15: Boiler Tube Sheet and Gauge Glass, Replace (SLEP) WORK ITEM 16: Steam Coil Pre-Heaters, Inspect and Test WORK ITEM 17: Refrigeration Plant, Maintain WORK ITEM 18: Boiler, Annual Maintenance WORK ITEM 19: Bow Crane, Biennial Inspect and Test WORK ITEM 20: Internal Hoists, Maintenance, Inspection and Test WORK ITEM 21: Grey Water Holding Tank(s), Clean and Inspect WORK ITEM 22: Sewage Piping, Clean and Flush WORK ITEM 23: Sewage Holding Tank(s), Clean and Inspect WORK ITEM 24: Main Motor Lube Oil Tank Heater, Inspect WORK ITEM 25: Ship Service Air Compressor, Overhaul WORK ITEM 26: Flex Hose Assemblies, Renew WORK ITEM 27: Fuel Oil Purifier (FOP) Overhaul WORK ITEM 28: Lube Oil Purifier (LOP) Overhaul WORK ITEM 29: Relocate Cycloconverter Strainers (SLEP) WORK ITEM 30: Recapitalize MSW & ASW Valves (SLEP) WORK ITEM 31: Science Sea Water Strainer (SLEP) WORK ITEM 32: A-Frames, Inspect and Repair WORK ITEM 33: Science Van Monorail System, Overhaul WORK ITEM 34: Steam Trap, Renew WORK ITEM 35: Steam Trap, Replace WORK ITEM 36: Distilling Plant Condensate Dump Valves, Replace WORK ITEM 37: Anchor Windlass, Inspect and Repair WORK ITEM 38: Mooring Capstan, Level 2 Overhaul WORK ITEM 39: Port & Starboard Miranda Davit, Biennial Inspect and Repair WORK ITEM 40: Aft Crane (Starboard), Biennial maintenance, Inspect and Repair WORK ITEM 41: Aft Articulating Crane (Port), Annual maintenance, Inspect and Repair iii (Rev-0)

WORK ITEM 42: Deck Crane (Starboard), TB 100-55, Annual maintenance, Inspect and Repair WORK ITEM 43: Deck Crane (Port), TB 100-55, Bi-Annual maintenance, Inspect and Repair WORK ITEM 44: Trawl / Core Winch, Inspect and Test WORK ITEM 45: Decks (Interior), Preserve WORK ITEM 46: U/W Body, Diver Inspect WORK ITEM 47: Deck Covering (Slip-Resistant) Forecastle Deck, Renew WORK ITEM 48: Deck Covering (Insulating), Replace WORK ITEM 49: Superstructure, Preserve (Partial) WORK ITEM 50: Stack, Preserve (Partial) WORK ITEM 51: Deck sockets, Renewal iv (Rev-0)

REVISIONS RECORD

This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

v (Rev-0)

CONSOLIDATED LIST OF REFERENCES

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.

All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.

COAST GUARD DRAWINGS

420-WAGB-451-011, SLEP Ice Radar Installation BWD & Details

420-WAGB-423-013, SPS-461 GPS System Installation BWD & Details

420-WAGB-426-010, Gyro System MK39 & MK27-F Elementary Wiring Diagram and Details

420-WAGB-423-011, 1SG38-CGECDIS(V)WAGB-420 Install BWD and Details

420-WAGB-423-015, Booklet of Electronic 1SG38-AIS-AFLOAT(V) Installation EWD & Details

420-WAGB-451-005, AN/SPS-50(V)4 Radar Install Block Wiring Diagram

420-WAGB-451-006, AN/SPS-50(V)4 Installation Wiring Data (COED)

420-WAGB-180-003, Rev. H, Mechanical & Electrical Foundation Arrangement

420-WAGB-200-001, Rev. G, Machinery Arrangement for Motor Room, Aux Machinery Rooms, Generator Room, Boiler Room, and Forward & Aft Machinery Spaces

420-WAGB-430-001, Rev. H, General Arrangement of Elec Equipment in IC Equipment Room

420-WAGB-633-002, Rev. D, Elementary & Isometric Cathodic Protection Wiring Diagram

420-WAGB-320-002, Rev. BA, Power System One-Line Diagram

420-WAGB_591_501, Rev E, Winch Assembly Oceanographic

420-WAGB_801_1, Rev K, Booklet of General Drawings

420-WAGB-612-003, Rev E, Helicopter Safety Nets

420-WAGB-801-001, Rev K, Booklet of General Drawings

NAVAIR Drawing 626883, Rev D, Visual Landing Aids Installation and Clearance Requirements, WAGB-420 Class Ships

420-WAGB-412-5, Rev 4, SLEP Polar Science Network Fiber System Block Wiring Diagram & Details

420-WAGB-412-006 Rev 3, CGOne Fiber System Block Wiring Diagram & Details

420-WAGB_591_551 Overall Block Diagram Science Winch Control Diagram

420-WAGB_591_521 Remote VDT Console

420-WAGB_591_550 Trawl/Core Winch Drives

420-WAGB_591_549 Oceanographic Winch Drives 1 & 2

420 WAGB 671-002, Rev D, CO2 Room

FL-1204-3, Rev A, Fleet Welded Padeyes and Links

420-WAGB-593-008, Rev A, Piping Mods GEA Westfalia OWS Install

420-WAGB-524-001, Rev P, Diagram Auxiliary Seawater System vi (Rev-0)

420 WAGB 312-001, Rev -, Emergency Power Generator Set Start Air Reducing Valve

420 WAGB 551-005, Rev D, Diagram Starting Air System

420 WAGB 551-009, Rev 1, SLEP ADG Starter Motor and Regulator Mods

420 WAGB 259-005, Rev C, Machinery Plant Exhaust Gas Piping A & D

420-WAGB-535-001, Rev M, Diagram Steam, Feed & Condensate System

420-WAGB-801-001, Rev K, Booklet of General Drawings

420-WAGB-320-016, Rev-D, HVAC Power System 01 Level

420-WAGB-320-017, Rev-D, HVAC Power System 02 Level

420-WAGB-320-018, Rev-E, HVAC Power System 03 Level

420-WAGB-320-019, Rev-C, HVAC Power System 04 Level & Above

420-WAGB-508-001, Rev-F, PP & Machinery Insulation Schedule

420-WAGB-508-002, Rev-D, Piping & Machinery Insulation Schedule L/M

420-WAGB-509-001, Rev-B, HVAC Insulation Schedule

420-WAGB-509-002, Rev-B, HVAC Insulation Schedule L/M

420-WAGB-510-002, Rev-H, HVAC 01 Level & Above

420-WAGB-511-001, Rev-E, HVAC Heater List

420-WAGB-512-642, Rev-C, Coil Assy Model# 1D5-9-5610F-.5-H-B

420-WAGB-512-643, Rev-D, Coil Assy Model# 1D5-12-5608F-.7-H-B

420-WAGB-512-644, Rev-D, Coil Assy Model# 1D5-18-5608F-1.5-H-B

420-WAGB-512-647, Rev-C, Coil Assy Model# 1D11-18-5608F-2.1-H-B

420-WAGB-512-649, Rev-C, Coil Assy Model# 1D13-24-5609F-3.3-H-B

420-WAGB-512-650, Rev-C, Coil Assy Model# 1D14-18-5606F-2.6-H-B

420-WAGB-512-654, Rev-D, Coil Assy Model# 1D22-36-5606F-8.3-H-B

420-WAGB-512-655, Rev-E, Coil Assy Model# 1D16-12-5606F-2-H-B

420-WAGB-512-675, Rev-C, Coil Assy Model# 1D24-42-5604F-10.5-H-B

420-WAGB-512-676, Rev-D, Coil Assy Model# 1D16-42-5604F-7-H-B

420-WAGB-512-677, Rev-D, Coil Assy Model# 1D12-30-5604F-3.8-H-B

420-WAGB-514-015, Rev -, Ship Stores Refrigeration Electrical Drawing

420-WAGB-514-016, Rev A, Ship Stores Refrigeration Condensing Unit

420-WAGB-514-017, Rev -, Ardick Marine Condenser Model NFC-56Q

420-WAGB-514-018, Rev -, Ship Stores Refrigeration Adrick Model ADR-074Q

420-WAGB_167_2, Rev H, Manhole List

420-WAGB_528_1, Rev G, Diagram of Plumbing and Int Deck Drain and Vacuum Collection System

420-WAGB_507_1, Rev C, Valve Label Plates

420-WAGB_256_1, Rev J, Diagram Main Seawater Circulating System

420-WAGB_256_10, Rev -. SLEP Cycloconverter MSW Strainer Relocation

420-WAGB_505_1, Rev D, Piping General Notes and Installation Details

420-WAGB_505_74, Rev D. Piping Arrangement Unit 106

420-WAGB_505_76, Rev J. Piping Arrangement Unit 107

420-WAGB_505_80, Rev K, Piping Arrangement Unit 126

420-WAGB_635_1, Rev D, Insulation Layouts & Dets vii (Rev-0)

420-WAGB-101-4, Rev C, Construction Drawing Units 105

420-WAGB_524_1, Rev P. Diagram Auxiliary Seawater System

420-WAGB_524_7, Rev B, SLEP Auxiliary Seawater System Mods

420-WAGB_524_8, Rev 1. SLEP Aft Science SW Duplex Strainer Install

420-WAGB_665_2, Rev J, Misc Monorails

420-WAGB-573-001, Rev B, Crane Pedestals Arr & Dets

420-WAGB-573-002, Rev D, Boom Rests

420-WAGB-573-003, Rev A, Science Hoist

420-WAGB-573-511, Rev F, General Arrangement KB 15-45

420-WAGB-573-545, Rev G, Aft. "A" Frame Base Weldment

420-WAGB-573-546, Rev E, Stbd "A" Frame Base Weldment

420-WAGB-573-547, Rev -, Hydraulic Cylinder Aft a-Frame

420-WAGB-573-548, Rev -, Hydraulic Cylinder Starboard a-Frame

420-WAGB-573-558, Rev C, Aft. "A" Frame Stop Tube Weldment

420-WAGB-573-559, Rev B, Side "A" Frame Stop Tube Weldment

420-WAGB-573-9, Rev -, Assembly Details Aft A-Frame

FL-1702-11, Sheave Inspection

420-WAGB-589-005, Rev B, Science Hoist Arrangement

420-WAGB-589-506, Rev C, General Arrangement Trash Hoist

420-WAGB-589-507, Rev E, General Arrangement Stores Hoist

420-WAGB-591-501, Rev E, Winch Assembly Oceanographic

420-WAGB-591-502, Rev E, Winch Assembly Traw/Core

420-WAGB-801-001, Rev K, Booklet of General Drawings

420-WAGB-801-1, Rev -, Booklet of General Drawings

420-WAGB-801-1, Rev K, Booklet of General Drawings

420-WAGB-801-001, Rev J, Booklet of General Drawings

420-WAGB-101-028, Rev D, Construction Drawings for Units 410 & 411

420-WAGB-101-029, Rev D, Construction Drawings for Units 400 & 401

420-WAGB-101-031, Rev D, Construction Drawings for Unit 402

420-WAGB-101-032, Rev D, Construction Drawings for Units 424 & 434

420-WAGB-101-035, Rev C, Construction Drawings for Units 442, 443, & 480

420-WAGB-101-036, Rev B, Construction Drawings for Units 444 & 445

420-WAGB-101-037, Rev C, Construction Drawings for Units 446 & 447

420-WAGB-101-038, Rev B, Construction Drawings for Units 448 & 449

420-WAGB-101-039, Rev D, Construction Drawing Units 450 & 451

420-WAGB-101-040, Rev C, Construction Drawing Units 452 & 453

420-WAGB-101-041, Rev B, Construction Drawing Units 454 & 455

420-WAGB-101-042, Rev B, Construction Drawing Units 456 & 457

420-WAGB-101-043, Rev C, Construction Drawing Units 412 & 413

420-WAGB-101-044, Rev C, Construction Drawing Units 415 & 000

420-WAGB-101-045, Rev D, Construction Drawing Units 422 & 423 viii (Rev-0)

420-WAGB-101-046, Rev B, Construction Drawing Unit 498 Stack

420-WAGB-101-055, Rev E, Construction Drawing Units 425-435

420-WAGB-101-056, Rev B, Construction Drawing Units 703 & 704

420-WAGB-101-058, Rev B, Construction Drawing Unit 711

420-WAGB-101-064, Rev D, Shell Expansion

420-WAGB-101-068, Rev C, Construction Drawing Units 432 & 433

420-WAGB-101-069, Rev B, Construction Drawing Units 458 & 459

420-WAGB-101-070, Rev B, Construction Drawing Units 460 & 461

420-WAGB-101-073, Rev E, Construction Drawing Units 720 & 721

420-WAGB-101-075, Rev C, Construction Drawing Unit 470

420-WAGB-161-001, Rev A, Forefoot Casting

420-WAGB-161-002, Rev D, Shaft Bossing Casting

420-WAGB-161-003, Rev B, Rudder Horn

420-WAGB-161-004, Rev -, Forefoot Transition Castings

420-WAGB-161-010, Rev -, Stern Tube Casting

420-WAGB-163-001, Rev D, Sea Chest and Vent Modifications

420-WAGB-184-014, Rev 1, SLEP SBP 29 & EM 304 Transducer Casings Install

420-WAGB-185-002, Rev C, Anchor Windlass Foundation

420-WAGB-185-003, Rev C, Series 353 Capstan and Mooring Winches FDNS

420-WAGB-200-001 Rev F, Machy Arrg List for Motor Rm, Aux Machy RMS, Gen Rm, Boiler Rms &

Fwd & Aft Mach

420-WAGB-243-001, Rev A, Shafting Arrangements

420-WAGB-243-002, Rev A, Shaft Forgings

420-WAGB-243-003, Rev C, Shafting Details

420-WAGB-314-006, Rev. B, 400 Hz Helo Service Power

420-WAGB-314-503, Rev. -, Schematic Diagram, Frequency Converter, Model 278-1M13

420-WAGB-320-002, Rev AH, Power System One-Line Diagram

420-WAGB-320-002, Rev. BC, Power System One Line Diagram

420-WAGB-320-016, Rev-D, HVAC Power System 01 Level

420-WAGB-320-017, Rev-D, HVAC Power System 02 Level

420-WAGB-320-018, Rev-E, HVAC Power System 03 Level

420-WAGB-320-019, Rev-C, HVAC Power System 04 Level & Above

420-WAGB-424-004, Rev L, Hull Mounted Transducers Installation Details

420-WAGB-424-006, Rev E, General Arrangement of Elec Equipment – Transducer Well

420-WAGB-424-501, Rev -, Outline - Ice Hardened Sea Chest

420-WAGB-424-502, Rev -, Outline - Ice Hardened Sea Chest

420-WAGB-424-617, Rev -, Outline-Ice Hardened Sea Chest for Spare Transducers

420-WAGB-431-002, Rev. C, IC Panels Cabling Connections Book

420-WAGB-508-001, Rev-F, PP & Machinery Insulation Schedule

420-WAGB-509-001, Rev-B, HVAC Insulation Schedule

420-WAGB-509-002, Rev-B, HVAC Insulation Schedule L/M

420-WAGB-510-002, Rev-H, HVAC 01 Level & Above ix (Rev-0)

420-WAGB-511-001, Rev-E, HVAC Heater List

420-WAGB-512-642, Rev-C, Coil Assy Model# 1D5-9-5610F-.5-H-B

420-WAGB-512-643, Rev-D, Coil Assy Model# 1D5-12-5608F-.7-H-B

420-WAGB-512-644, Rev-D, Coil Assy Model# 1D5-18-5608F-1.5-H-B

420-WAGB-512-647, Rev-C, Coil Assy Model# 1D11-18-5608F-2.1-H-B

420-WAGB-512-649, Rev-C, Coil Assy Model# 1D13-24-5609F-3.3-H-B

420-WAGB-512-650, Rev-C, Coil Assy Model# 1D14-18-5606F-2.6-H-B

420-WAGB-512-654, Rev-D, Coil Assy Model# 1D22-36-5606F-8.3-H-B

420-WAGB-512-655, Rev-E, Coil Assy Model# 1D16-12-5606F-2-H-B

420-WAGB-512-675, Rev-C, Coil Assy Model# 1D24-42-5604F-10.5-H-B

420-WAGB-512-676, Rev-D, Coil Assy Model# 1D16-42-5604F-7-H-B

420-WAGB-512-677, Rev-D, Coil Assy Model# 1D12-30-5604F-3.8-H-B

420-WAGB-514-015, Rev -, Ship Stores Refrigeration Electrical Drawing

420-WAGB-514-016, Rev A, Ship Stores Refrigeration Condensing Unit

420-WAGB-514-017, Rev -, Ardick Marine Condenser Model NFC-56Q

420-WAGB-514-018, Rev -, Ship Stores Refrigeration Adrick Model ADR-074Q

420-WAGB-524-001, Rev P, Diagram Auxiliary Seawater System

420-WAGB-531-001, REV F, Distilling plant system

420-WAGB-535-001, Rev M, Diagram Steam, Feed & Condensate System

420-WAGB-535-001, REV M, Diagram steam, feed & condensate system

420-WAGB-535-001, Rev-M, Diagram Steam, Feed & Condensate System

420-WAGB-562-001, Rev E, Rudders Units 021 & 022

420-WAGB-568-001, Rev C, Bow Thruster Installation Arrangement and Details

420-WAGB-581-001, Rev -, Anchor Handling Arrangements and Details

420-WAGB-581-501, Rev C, Series 274 Anchor Windlass

420-WAGB-581-502, Rev D, Series 274 Anchor Windlass HPU General Assembly

420-WAGB-581-505, Rev -, Foundation Loads for Anchor Windlass

420-WAGB-581-532, Rev E, 13,200 lb Balanced Fluke Anchor Assy

420-WAGB-581-533, Rev B, Series 274 Anchor Windlass

420-WAGB-581-534, Rev -, Assy Dwg Stud Link Anchor Chain

420-WAGB-581-544, Rev B, Brake Band Assembly Series 274 Anchor Windlass

420-WAGB-581-547, Rev C, Series 274 Anchor Windlass Stroker Linkage Assembly

420-WAGB-581-548, Rev B, Series 274 Anchor Windlass Chain Stripper Assembly

420-WAGB-582-001, Rev E, Mooring, And Towing Arrangement

420-WAGB-582-503, Rev -, Series 353 Capstan Block Diagram

420-WAGB-582-504, Rev -, Series 353 Johnson type Capstan

420-WAGB-582-554, Rev -, General arrangement Series 353 Capstan (no Master)

420-WAGB-582-557, Rev A, Series 353 AFT Mooring Capstan Elementary Diagram

420-WAGB-582-560, Rev -, Series 353 AFT Capstan Operator Console Assembly

420-WAGB-591-521 Remote VDT Console

420-WAGB-591-549 Oceanographic Winch Drives 1 & 2 x (Rev-0)

420-WAGB-591-550 Trawl/Core Winch Drives

420-WAGB-591-551 Overall Block Diagram Science Winch Control Diagram

420-WAGB-593-008, Rev A, Piping Mods GEA Westfalia OWS Install

420-WAGB-631-001, Rev D, Paint Schedule & Corrosion Control

420-WAGB-634-001, Rev C, Deck Covering & Carpet Shed

420-WAGB-635-001, Rev E, Insulation Layouts & Dets

420-WAGB-801-001, Rev K, Booklet of General Drawings

420-WMSL_507_1, Rev C, Valve Label Plates

FL-1204-3, Rev A, Fleet Welded Padeyes and Links

FL-1702-11, Sheave Inspection

FL-2804-022, Rev B, Consolidated Visual ID for Cutters (Vessels 65 ft and Over in Length)

420-WAGB_262_8, Rev C, Diagram Main Motor, Thrust, Line Shaft Bearing Lube Oil Service System

420-WAGB_528_1, Rev F, Diagram of Plumbing & Int. Deck Drain & Vacuum Collection System

420-WAGB_535_1, Rev N, Diagram Steam, Feed & Condensate System

420-WAGB 611-3, Rev G, Misc Deck Sockets

420-WAGB 635-1, Rev D, Insulation Layouts & Dets

420-WAGB 801-1, Rev -, Booklet of General Drawings

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General

Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and

Allied Processes

Surface Forces Logistics Center Standard Specification 0850 (SFLC Std Spec 0850), 2022, General

Requirements for Drawing Preparation

Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), 2022, Overhaul AC

Electrical Motors

Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2022, Shipboard

Electrical Cable Test

Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2022, Shipboard

Electrical Cable Removal, Relocation, Splice, Repair, and Installation

Surface Forces Logistics Center Standard Specification 3100 (SFLC Std Spec 3100), 2022, Inspect, Test

And Recondition AC Synchronous Machines In-Place

Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary

Machine Systems

Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2022, Clean

Shipboard Ventilation Systems

Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire

Prevention and Response

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures

Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2022, Install Interior

Deck Covering Systems

Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2022, Drydocking xi (Rev-0)

Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2022, Temporary

Services

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (Series), Coatings and Color Manual

Coast Guard Technical Publication (TP) 5150, 2003, S6161-U4-FSE-010 Grease Interceptor Hood with

MGPC-4000-S-2 Control Cabinet.

Coast Guard Technical Publication (TP) 5200, S6220-B4-MMC-010, Compressor, High Pressure

Breathing Air, Model K15-E3

Coast Guard Technical Publication (TP) S9555-CH-MMA-010, 2008, AFFF Firefighting Hose Reels –

Models NL20MB, NL20M-200B

Coast Guard Technical Publication (TP) 5207, S9555-DM-MMC-010, Fire Extinguishing System, High

Pressure Carbon Dioxide

Coast Guard Technical Publication (TP) 5502, 2020, Fire Suppression System - Model WHDR

Coast Guard Technical Publication (TP) 5070B, SWBS 311, NOV 2017, Diesel Engine, Auxiliary

Generator (420-WAGB)

Coast Guard Technical Publication (TP) 5162A, 2023, S9517-AY-MMC-010 - Boiler, Oil Fired

Auxiliary

Coast Guard Technical Publication (TP) 5243, Nov 2013, SG811-B4-MMC-010 – Crane, Electro-

Hydraulic Telescoping Boom – Model TB60-65

Coast Guard Technical Publication (TP) 5244 July 2004, SG811-B5-MMC-010 – Single Articulating

Boom Crane – Model K40-55

Coast Guard Technical Publication (TP) 5245, 2022, SG811-C5-MMC-010 - Crane, Primary Telescoping

Boom Pedestal Type – Model 100-55

Coast Guard Technical Publication (TP) 5246 July 2004, SG811-B5-MMC-010 – Single Articulating

Boom Crane – Model K15-45, s/n 1867

Coast Guard Technical Publication (TP) 5249, SWBS 589, 2003, SG825-A3-MMC-010 - 1000 Lb

Capacity Stores Hoist

Coast Guard Technical Publication (TP) CG TP LR-H5-0006-V0 - 6000 Lb Capacity Science Hoist

Coast Guard Technical Publication (TP) 5251, SWBS 589, SG825-AZ-MMC-010 - 600 Lb Capacity

Trash Hoist

Coast Guard Technical Publication (TP) 5262, SWBS 591, March 2023, Science Winch, Model 10628

Oceanographic, Model 71217 Trawl/Core Mechanical System & Wire Handling (Volume 1)

Coast Guard Technical Publication (TP) 5263, SWBS 591, Nov 2003, SG813-HP-MMC - Science

Winch, Mechanical System & Wire Handling (Volume 2)

Coast Guard Technical Publication (TP) 5264, SWBS 591, Nov 2003, Science Winch, Mechanical

System & Wire Handling (Volume 3)

Coast Guard Technical Publication (TP) 5267, Nov 2003, S9593-D5-MMC-010 – Vacuum Sewage

System

Coast Guard Technical Publication (TP) 5326, SWBS 589, 15 Oct 2004, Hoist, Shaw-Box Science Van

Electric – Series 700

Coast Guard Technical Publication (TP) 5336, 06-NOV-07, The Cranesmart "LMI" System

Coast Guard Technical Publication (TP) 5359, 2023, Boiler Water Management System – Chem Aqua

Water Treatment Program

Coast Guard Technical Publication (TP) 5389, SWBS 516, October 2018, Ship’s Stores Refrigeration

Plant, Type Two – Mdel ADR-074Q – Installation and Operations Manual xii (Rev-0)

Coast Guard Technical Publication (TP) 5391, Apr 2020, Controllers, Centrifugal Separator System –

EPC60 Retrofit

Coast Guard Technical Publication (TP) 5502, 2020, Fire Suppression System - Model WHDR

Coast Guard Technical Publication (TP) S9555-CH-MMA-010, 2008, AFFF Firefighting Hose Reels –

Models NL20MB, NL20M-200B

Coast Guard Technical Publication (TP) SG825-AY-MMC-010, 2025, Science Hoist

Coast Guard Technical Publication (TP) XXXX, 2023; GEA Westfalia Separator BilgeMaster Clean

Design

Coast Guard Technical Publication 0983-LP-014-2010 (TP 0983-LP-014-2010), CHG 1, Jul 1986, Power

Supply, Metallic Rectifier, Helicopter, Starting and Servicing

Coast Guard Technical Publication 4668, MIRANDA DAVIT - MODEL MRT 3900 - Installation, operation and maintenance manual

Coast Guard Technical Publication 5078 (TP 5078), SWBS 314, Nov 2003, Control Panel 30 kW Motor

Generator Set

Coast Guard Technical Publication 5080 (TP 5080), SWBS 314, Nov 2003, S9314-DK-MMC-010 –

Converter, Frequency

Coast Guard Technical Publication 5081 (TP 5081), Nov 2003, SG160-AA-MMC-010 – Control Panel, Transformer / Rectifier

Coast Guard Technical Publication 9233 (TP 9233), Science Winch Drives and Control System, SWBS

591, May 2023

Coast Guard Technical Publication LR-H5-0008-V1 DAVIT WINCH & HPU, RESCUE BOAT (RHIB)

– TYPE MRT 3900-BH7800-961045-1 – VOLUME 1

Coast Guard Technical Standard (TS) 591, Rev -, Oceanographic Research Equipment

Surface Forces Logistic Center Technical Standard (SFLC TS) 589, 2020, Cranes

Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, Jan 2022, General

Requirements

Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0740, Jan 2022, Welding and

Allied Processes

Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 6310, Jan 2022, Requirements for Preservation of Ship Structures

OTHER REFERENCES

MIL-C-24757, Nov 1990, Cloth, Fiberglass, Coated

Electric Plant Installation Standard Methods for Surface Ships and Submarines, MIL-STD-2003 Series

IEEE Recommended Practice for Electric Installations Aboard Ships, IEEE-STD-45-2002

Shipboard Bonding, Grounding, and Other Techniques for Electromagnetic Compatibility, Electromagnetic Pulse (EMP), and Safety, MIL-STD-1310 (Series)

Optical Fiber Standard Testing Procedure (Multi-Mode Cable) ANSI/TIA/EIA-526-14 (OFSTP-14)

Optical Fiber Test Procedure 7 (Single Mode) ANSI/TIA/EIA-526-7 (OFSTP-7)

Technical Publication TP: E-451-031-B, AN/SPS-50(V) Marine Radar/ARPA – Operator’s Quick

Reference Guide & Operator’s Manual

Technical Publication TP: E-451-032-A, AN/SPS-50(V) Marine Radar/ARPA – Installation Manual

Technical Publication TP: E-410-008, Seawatch-Monitors, Hatteland Display Technical Manual

U.S. Coast Guard Computerized Maintenance System, CP-ELEX, EE-C-RDNT MPC Card xiii (Rev-0)

Wilson Walton Ver. 2306, Aquamatic 4 Impressed Current Cathodic Protection Installation and Operation

Manual for Power Unit & Remote Display

Rugged Controls RPC-90x Programmable Controller Operations and Maintenance Manual

Amerex Inspection, Maintenance, and Recharge Service manual NO. 13259

National Fire Protection Association standard NFPA-10 (Portable Fire Extinguishers)

US Environmental Protection Agency Method 1664, Feb 1999, N-Hexane Extractable Material and Silica

Gel Treated N-Hexane Extractable Material by Extraction and Gravimetry.

TDI T100-V TurboTwin, April 2006, Installation and Operating Manual

TDI TurboFlow Air Regulator, March 2014, Product Sheet

DOD-STD-2187, Aug 1987, Chemical Cleaning of Salt Water Piping Systems

ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets

ASTM International (ASTM) F708, 2022, Standard Practice for Design and Installation of Rigid Pipe

Hangers

ASTM Internationals (ASTM) G46, 2018, Standard Guide for Examination and Evaluation of Pitting

Corrosion

ASTM Internationals (ASTM) G46-21, 2021, Standard Guide for Examination and Evaluation of Pitting

Corrosion

American Society for Nondestructive Testing (ASNT), Recommended Practice No. SNT-TC-1A, 2016, Personnel Qualification and Certification in Nondestructive Testing

American Society for Nondestructive Testing (ASNT), Standard No. ANSI/ASNT CP-189-2016, 2016, ASNT Standard for Qualification and Certification of Nondestructive Testing Personnel

American Society of Mechanical Engineers (ASME) BPVC, 2017, Boiler and Pressure Vessel Code

American Society of Mechanical Engineers (ASME) HST-3, 1999, Performance Standard for Manually

Lever Operated Chain Hoist

American Welding Society (AWS) B1.10M/ B1.10, 2016, Guide for Nondestructive Examination of

Welds

American Welding Society (AWS) B1.11M/B1.11, 2015, Guide for the Visual Examination of Welds

American Welding Society (AWS) D1.1/D1.1M, 2025, Structural Welding Code – Steel

American Welding Society (AWS) D3.5, 2000, Guide for Steel Hull Welding

American Welding Society, AWS D1.2-96, 1996, Structural Welding Code, Steel

ASME Standard (ASME) B30.17, 2020, Cranes and Monorails (with Underhung Trolley or Bridge)

ASTM International (ASTM) A6/A6M, 2026, Standard Specification for General Requirements for

Rolled Structural Steel Bars, Plates, Shapes, and Sheet Piling

Boiler tubes

Code of Federal Regulations (CFR) Title 29, Part 1910, Subpart T, 2023, Commercial Diving Operations

Code of Federal Regulations (CFR) Title 29, Part 1915, Jul 2008, Occupational Safety and Health

Standards for Shipyard Employment

Code of Federal Regulations (CFR) Title 29, Part 1915, Subpart E, Sep 2015, Scaffolds, Ladders and

Other Working Surfaces

Code of Federal Regulations (CFR) Title 40, 2013, Protection of the Environment

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2004, Solvent Cleaning

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2016, Bare Metal Power Tool Cleaning xiv (Rev-0)

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2020, Power Tool Cleaning to Bare Metal

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2004, Power Tool Cleaning

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2024, Power Tool Cleaning

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation

Standard SSPC-SP 10 (WAB)/NACE WAB-2, 2015, Near-White Metal Wet Abrasive Blast

Cleaning

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation

Standard SSPC-SP 6 (WAB)/NACE WAB-3, 2015, Commercial Wet Abrasive Blast Cleaning

Underwater Ship Husbandry Manuals

NAVSEA 4730/3, 2004, Driver Hull Inspection Data

NAVSEA Drawing 803-1385866, Rev E, Penetration, Bulkhead and Deck

NAVSEA S0600-AA-PRO-170, Rev 2 Change A, 2014, Underwater Ship Husbandry Manual, Chapter 17

Inspections

NAVSEA S9583-AR-MMC-010, VOL 1, Davit, Winch & HPU, Rescue Boat (RHIB)

NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for

Fabrication, Welding, and Inspection of Submarine Structure

Rugged Controls RPC-90x Programmable Controller Operations and Maintenance Manual

SAE International (SAE) AMS-STD-595A, 2017, Colors Used in Government Procurement

Society of Automotive Engineers (SAE) J1942-1, 2008, Qualified Hoses for Marine Applications

TDI T100-V TurboTwin, April 2006, Installation and Operating Manual

TDI TurboFlow Air Regulator, March 2014, Product Sheet

NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation For Compartments Installation

Details xv (Rev-0)

CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK

ITEM

MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED

COST

($/UNIT)

7 N

INTERFACE HARDWARE

W/ CABLE KIT

PN: RSI 6000 1 ea. $3,500

7 Y DISPLAY UNIT, 19-INCH

PN: JH19T14MMD-AA1-

AOAA

1 ea. 5000

7 Y

KEYBOARD, DATA

ENTRY

PN: 591-0032 1 ea. $1,500

7 Y

TRACKBALL, DATA

ENTRY

PN: 610-0032 1.ea. $1,000

7 Y DISPLAY UNIT, 15-INCH

PN: JH15T17MMD-AA1-

AAAA

1 ea. 2200

7 N

RADAR CONNECTION

CABLE, (10 M)

PN: RW-00136 1 ea. $1,800

7 N

KVM EXTENDER OVER

CAT/FIBER

PN: KVXHP-100 1 pair $3,000

7 N

POWER ADAPTER, 12

VDC, 3A

PN: KVM-12VDC3A 1 ea. 200

7 N MAGNETRON, X-BAND 000-140-762 1ea $700

8 Y Power Supply Unit, 300

Amp N/A 6 25250

8 Y Remote Administrative

Display (RAD) N/A 2 $3,500

14 N Twin turbo starter T112-60031-01R-103 1

14 N Pressure Regulator 3-30327-001 1 3200

15 N PN: 19-TMCH-20 2 $3,000

15 N Valves , #64 In-Line Valve

(Plain Closing)

PN: #64 4 $500

19 N Sheave Assembly, Item 7, Figure 10-25, TP 5243 PN: 14-10A-5/8 2 ea. 5000

25 N Lobe (Figure 7-14-19) P/N: 14-3098-UNLobe 3 $23,839

29 N

2" Type A Deck Drain, Bronze with Carbon Steel

Ring, Cast Drain - Drawing

810-1385789 Rev. F

D307A205 1 $1,300

30 N

VALVE, VACUUM

BREAKER, 3" NPS 125#

ANSI B16.6 FLANGE

CONNECTION, GLOBE

STYLE HIGH FLOW

TYPE, 80 SCFM PER

SECOND, WITH AIR

RELEASE VALVE, 260

SCFM NOMINAL, ASTM

18U03-4FO-DBY 2 7967

xvi (Rev-0)

A536 DUCTILE IRON

BODY WITH FUSION

BONDED EPOXY

COATING, SILICON

BRAZE INTERNALS

30 N

"3-way" for A/C's.

METREXMISC

EAMDF3120BMF3WTA420

3" 3-WAY MARINE

ELECTRIC ACTUATED

EAMDF3120BMF3WTA420 8 $32,798

30 N

"3-way" for Reefers. DPB-

E1L-A10L13--W955, DP =

Industrial Diverter Port ball valve

DPB-E1L-A10L13--W955 6 $6,530

30 N

SPN-K5L-J--S Industrial 2-way 3-piece ball valve, Adjust-O-Seal®, live loaded stem packing

SPN-K5L-J—S 2 5726

30 N

"SPN1J5U-J--S, Industrial

2-way 3-piece ball valve, Adjust-O-Seal®, live loaded stem packing"

SPN1J5U-J--S 26 $5,879

30 N

SPN-E5S-J--S Industrial 2-way 3-piece ball valve, Adjust-O-Seal®, live loaded stem packing

SPN-E5S-J—S 12 $1,366

30 N

SPN-F5S-J--S Industrial 2-way 3-piece ball valve, Adjust-O-Seal®, live loaded stem packing

SPN-F5S-J—S 5 2087

30 N

"MILWAUKEE VALVE

FIGURE 1041, VALVE,

GLOBE, 2-1/2” NPS, ANSI

B16.5 150# FLAT FACE,

BRONZE BODY, NI-CU

ALLOY INTERNALS,

NAVSEA 803-1385541,

MATERIAL: ALUM

BRONZE ASTM B-148"

803-13855451 9 $7,308

30 N

MILWAUKEE VALVE

FIGURE 161A VALVE,

GLOBE, 1” NPS, UNION

END, BRONZE BODY, NI-

CU ALLOY INTERNALS,

NAVSEA 803-4384536,

MATERIAL: ALUM

BRONZE ASTM B-148

803-4384536 5 $844

30 N

"MILWAUKEE VALVE

FIGURE 1146)VALVE,

GATE, 1/2” NPS, SIL-BRZ

803-4385714 11 692.31 xvii (Rev-0)

UNION END X 1/2” FPT,

400 PSI WOG, NON-

RISING STEM,

THREADED BONNET,

NITRILE O-RING, SOLID

WEDGE, NAVSEA DWG

803-1385714, MATERIAL:

BRONZE ASTM B-61"

31 N

VALVE, GATE, 4” NPS,

HASTELLOY BODY, 150#

ANSI FLANGED, CW-

12MW OBTU./N10276

STEM, A494 CW-12MW

BACK SEAT & BODY

SEAT. (LADISH VALVES

DWG# : 8275-1201-GG01-

A40C

8275-1201-GG01-A40C 5 $14,175

32 Y Hydraulic Cylinder, Aft A frame 3040-01-458-3253 2 $24,025

32 Y Hydraulic Cylinder, Stbd A frame 3040-01-458-3238 2 9177

35 N

Spirax Sarco Universal

Connector, Model PC20, ½”

IPS with blowdown

67980 18 $497

35 N

Spirax Sarco Model UFT32-

4.5 Universal Float &

Thermostatic Steam Trap, Stainless Steel, PMO65 PSI

1465300 12 $1,187

35 N

Spirax Sarco Model UBP32

Universal Balanced Pressure

Thermostatic Steam Trap, Stainless Steel, with Near to

Steam Capsule 7F PMO 464

PSI

1270900 6 574

35 N

Spirax Sarco Model VB-VS

Combination Vacuum

Breaker Balanced Pressure

Air Vent 1/2” NPT

72147 1 $783

36 N

ASCO 3-Way Solenoid

Valve 3-Way Diverting, 1”

150# flanges, bronze body, seating PTFE, 115 VAC/60

Hz operation in a NEMA 4 enclosure

AV182430-1 3 $20,000

39 Y SHEAVE , GALV W/CIP B-4838 22 Ea. 1700

39 Y

SPRING LOADED

SHEAVE

D-13898 2 Ea. $16,000

39 N KEEPER PLATE 20 $40

39 N KEEPER PLATE D-13898-21 20 20

39 N PIN, WELDED D-13898-6 20 $800

xviii (Rev-0)

40 N 7/8” Sheave assembly 240909 3 $3,262

40 N 5/8” Sheaves Assembly 240912 1 2624

40 N Sheave Assembly 44575 1 $597

40 N Fast Winch Certified

Hardware 240916 1 $11,196

40 PIN WLDMT 44571 1 1106

42 N Sheave Assy 240909 3 ea $3,262

42 N Sheave Assy 240910 2 ea $12,552

42 N Pin, Certified WLDMT 42865 4 ea 1777

43 N Sheave Assy 240909 3 ea $3,262

43 N Sheave Assy 240910 2 ea

43 N Pin, Certified WLDMT 42865 4 ea 1777

50 N Coast Guard Emblem Vinyl

Kit N/A 2 ea. $2,000

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xix (Rev-0)

CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS

The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5

(Inspection report particulars)):

Work Item Title

5 Recapitalize Science Data Network Infrastructure (SLEP)

6 Recapitalize CGOne Network Infrastructure (SLEP)

7 Recapitalize Ice Radar (SLEP)

9 Oceanographic Winch, Inspect and Test

Scientific and Ocean Engineering Systems, Control System Groom and Indicator Calibration

15 Boiler Tube Sheet and Gauge Glass, Replace (SLEP)

18 Boiler, Annual Maintenance

19 Bow Crane, Biennial Inspect and Test

20 Internal Hoists, Maintenance, Inspection and Test

21 Grey Water Holding Tank(s), Clean and Inspect

23 Sewage Holding Tank(s), Clean and Inspect

32 A-Frames, Inspect and Repair

33 Science Van Monorail System, Overhaul

39 Port & Starboard Miranda Davit, Biennial Inspect and Repair

40 Aft Crane (Starboard), Biennial maintenance, Inspect and Repair

41 Aft Articulating Crane (Port), Annual maintenance, Inspect and Repair

42 Deck Crane (Starboard), TB 100-55, Annual maintenance, Inspect and Repair

43 Deck Crane (Port), TB 100-55, Bi-Annual maintenance, Inspect and Repair

44 Trawl / Core Winch, Inspect and Test

45 Decks (Interior), Preserve

47 Deck Covering (Slip-Resistant) Forecastle Deck, Renew xx (Rev-0)

PRINCIPAL CHARACTERISTICS

420' WAGB (CGC HEALY)

PHYSICAL

Length overall 420'

Length between perpendiculars 396' 6"

Beam, extreme 82' 0"

Depth amidships to main deck 42' 0"

Draft to bottom of keel @ full load 29' 3"

Full load displacement 16,423 long tons

Effective keel length 230' 0"

Mast height above DWL @ 28' draft 158' 3/8"

HULL

Frame spacing 30"

Material

Hull ASTM A131, GR EH 36, or ABS EH 36

Flight deck ASTM A131, GR EH 36, or ABS EH 36

Superstructure ASTM A131, GR EH 36, or ABS EH 36

MACHINERY

Propulsion 4 Sultzer 12Z a V 40S

2 AC Synchronous, 11.2MW Drive Motors

Auxilary generator 1 EMD 16-645F7B, 2200 KW, 450V AC, 3 phase

Rudder 2

Anchor & chain Two 13,200 lbs Navy Stockless, 150 fathoms chain Port, 165 fathoms chain

Starboard

TANKS

Diesel oil or JP-5 (@ 95%) 1,187,117 gal.

JP-5 (Helo) (@ 95%) 56,434 gal.

9250 lube oil (@ 95%) 24,794 gal.

Fresh water (@ 95%) 34,553 gal.

Hydraulic oil (@95%) 8,571 gal.

Ballast water (@95%) 899,776 gal.

1 (Rev-0)

00000_0226_FLT

REC_00000_FLT_Commercial Project @ CG Facility (0121)

General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.

1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and

'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is

Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

2. REFERENCES

COAST GUARD DRAWINGS

None.

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Latest Version, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Latest Version, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), Latest Version, Fire Prevention and Response

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), Latest Version, Requirements for Preservation of Ship Structures

OTHER REFERENCES

Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for

Shipyard Employment

NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for

Fabrication, Welding, and Inspection of Submarine Structure

2 (Rev-0)

3. REQUIREMENTS

3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements in this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

3.1.1 The Contractor must conform to all requirements specified in SFLC Std Spec 5550 and in the Fire

Protection and Response work item, as applicable, during the performance of this availability.

3.1.1.1 Fire Safety Plan submission. The Contractor must submit a copy of the CFR 1915, Subpart P, Fire Safety

Plan with the Contractor’s bid when work will be conducted in a Contractor–owned facility. Include any MOA(s) with local firefighting facilities.

3.1.1.2 Fire Plan submission. The Contractor must submit a copy of the developed availability specific fire plan as requested in Work Item 1: Fire Prevention, Provide, with the Contractor’s bid.

3.2 Contractor-provided fire watch personnel. The Contractor must provide fire watch personnel and equipment.

3.3 Preservation requirements. The Contractor must accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Coatings. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. The Contractor must obtain a written COR authorization to deviate from any coatings required in SFLC Std Spec 6310 Appendix C before work.

3.3.3 In-process quality control measures. The Contractor must abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces”).

3.3.3.1 Quality control requirements. The Contractor must abide by the following when performing preservation related inspections. The following measurements must be randomly spaced throughout for the purposes of providing a representation of the entire prepared or coated surface.

3.3.3.1.1 Surface profile measurements. One surface profile measurement must be taken for every 200 square feet for the first 1000 square feet; for each additional 500 square feet or less, one profile measurement must be taken.

Profile measurements must be taken in accordance with SFLC Std Spec 6310, paragraph 3.1.8.3 (Surface profile measurements). A “measurement” for surface profile is defined as follows:

• ASTM D4417, Method B: One profile measurement is the average (mean) of 10 individual readings.

• ASTM D4417, Method C: One profile measurement is the average (mean) of 2 individual readings.

3.3.3.1.2 Soluble salt conductivity measurements. 5 conductivity measurements must be taken every 1000 square feet. For submerged (immersed) applications conductivity measurements must not exceed 30 microsiemens/cm.

For non-submerged (non-immersed) applications conductivity measurements must not exceed 70 microsiemens/cm. If a conductivity check fails, clean the surface in accordance with SFLC Std Spec 6310, paragraph 3.1.8.5 (Soluble salt removal).

3 (Rev-0)

3.3.3.1.3 Coating thickness measurements. Three area measurements must be taken for the first 1000 square feet;

for each additional 1000 square feet, perform an additional area measurement. A “measurement” for coating thickness is defined as follows:

• SSPC-PA 2 defines an area measurement as 5 separate spot measurements randomly spaced throughout a 100 square foot area.

• SSPC-PA 2 defines a spot measurement as 3 gage readings and each new gage reading the probe must be moved to a new location within a 1.5-inch diameter circle defining the spot.

3.4 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.

NOTE

NAVSEA approval is NOT required for welding procedures submitted but the procedures must be reviewed and shown to satisfy the requirements set forth in

NAVSEA TP 1688, by a welding regulatory agency. The requirements for welding

Strenx 900 are considered the same as those for welding HY-130.

3.5 Environmental protection requirements. The Contractor must adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

3.5.1 USCG facilities. The Contractor must provide and maintain environmental protection as defined in SFLC

Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor must plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor must comply with applicable

Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item must not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is Large Quantity

Generator (LQG).

3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:

• Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.

• National Pollutant Discharge Elimination System (NPDES) Storm Water (SW)

Permit: Unit has an NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.

• Air Emission Permit: Unit has an Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.

3.5.2 Test and procedures. The Contractor is required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work must be done by qualified laboratories; and where required by law, the laboratories must be certified.

4 (Rev-0)

3.5.3 Regulatory notifications. The Contractor is responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor must submit copies of all regulatory notifications to the COR and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications must be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 Environmental manager. The Contractor must appoint in writing an Environmental Manager for the project, who is responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager must ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’

Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out;

ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous

Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental

Records binder and required documentation, including environmental permits compliance and close-out.

3.5.5 HW disposal. Contractor must comply with SFLC Std Spec 0000 Appendix B, Requirements For

Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).

3.5.6 Additional Requirements. The Contractor must be aware of the following:

3.5.6.1 No Contractor or Subcontractor must have the authority to sign a Hazardous Waste Manifest using the

Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast

Guard facility without COR approval.

3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor must prepare for and comply with local and state regulations.

3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor must furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.

3.6 Local Policy. The Contractor must refer to site (e.g., Base) Regulations and Instructions for details regarding local policies (e.g., crane services, parking, or facility usage).

3.7 SFLC Standard Specification approved changes. Approved updates to the 2022 SFLC Standard Specifications will appear here.

3.7.1 SFLC Standard Specification 5550: Replace paragraph 3.11.3 to state, “Material supporting imminent work shall be brought on the cutter and stored where the work is being performed. Material that appreciably contributes to fire load shall be removed at the end of each work shift when personnel are not present. Trash, debris, and packaging materials shall be promptly removed from the vessel at the end of each work shift and not allowed to accumulate.” Advance the paragraph numbering of the Fire Prevention and Safety Inspection form to 3.11.4.

5 (Rev-0)

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

6 (Rev-0)

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

VESSEL NAME HULL # WORK

ITEM #

WORK ITEM TITLE

LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.

CHECKPOINT 4 - PRE-SURFACE…