70Z08526RLREP0010 Attachment 1 Pricing Sheet.xlsx
XLSX spreadsheet 22 KB Posted
- Solicitation number
- 70Z08526RLREP0010
About this file
This is a pricing sheet for a dock-side maintenance and repair task order for the USCGC HEALY (WAGB 20), a U.S. Coast Guard icebreaker vessel, under solicitation number 70Z08526RLREP0010 for Fiscal Year 2027. The pricing sheet contains two main components: an attachment for additional work to be ordered on an as-needed basis, and a detailed Task Order 1 with 51 individual line items covering comprehensive vessel maintenance, repair, and modernization work.
The additional work component establishes a composite labor rate structure whereby contractors submit an hourly rate applied to 7,886 hours (with a total quantity of 9,696 hours referenced), along with an all-inclusive mark-up/loading rate for materials and subcontractors to be applied against a base amount of $100,000. Task Order 1 includes specific maintenance activities such as fire prevention, temporary cutter services, sea trial support (priced separately for five weekdays and one weekend day), and numerous planned maintenance and modernization items including recapitalization of network infrastructure, cathodic protection upgrades, system inspections and overhauls (boiler, refrigeration, diesel generator components), equipment maintenance (cranes, winches, davits), and preservation work on decks and superstructure. All line items in Task Order 1 are currently priced at zero pending contractor quotation. Contractors must provide pricing inclusive of materials, labor, equipment, and overhead and profit, with composite labor rates broken down by direct labor costs, general and administrative expenses, and profit margin.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Sheet
| ATTACHMENT 1: Pricing Sheet | |||||
| USCGC HEALY DOCK SIDE FY27 | |||||
| 70Z08526RLREP0010 | |||||
| Contract Line Item (CLIN) | Title | Unit Price | Unit | Quantity | Total CLIN Price |
| 1 | TAB 1: Task Order Pricing Sheet | $ - 0 | Lump Sum | 1 | $0.00 |
| 2 | Additional Work To Be Ordered- Insert your Composite Labor Rate Unit Price: $______; Quantity: 9,696; Unit of Issue: Hour; Insert your Extended Price: [7,886 X hourly rate quoted] $____________. |
Insert your all inclusive mark-up/loading rate for materials and subcontractors: ____%. Unit Price: $314,618.00; Quantity: 1; Unit of Issue: Percent; Insert your Extended Price: [$100,000.00 X ( 1 + percentage quoted)] : $__________.
The above rate and percentage will be incorporated into the contract and used on change requests (CRs). Work is ordered against this CLIN on authorized CRs by the Contracting Officer.
Total Pricing Sheet Estimated Price $0.00
Tab1 Task Order 1
| Tab 1Task Order 1 | ||||||
| USCGC HEALY DOCK SIDE FY27 | ||||||
| 70Z08526RLREP0010 | ||||||
| Contract Line Item (CLIN) | Funding Code | Title | Unit Price | Unit | Quantity | Total CLIN Price |
| 1 | 45 | Fire Prevention, Provide | $ - 0 | Job | 1 | $0.00 |
| 2 | 45 | Temporary Services, Provide - Cutter | $ - 0 | Job | 1 | $0.00 |
| 3 | 45 | Tenting, Provide (Optional) | $ - 0 | Job | 1 | $0.00 |
| 4 | 45 | Sea Trial Performance, Support, Provide - Price CLIN for five (5) weekdays1 and one (1) weekend day2. Insert price per day for weekdays1 here: $__________ . Insert price per day for weekend days2 here: $__________to be used in a change request. | $ - 0 | Day | 4 | $0.00 |
| 5 | PC&I | Recapitalize Science Data Network Infrastructure (SLEP) | $ - 0 | Job | 1 | $0.00 |
| 6 | PC&I | Recapitalize CGOne Network Infrastructure (SLEP) | $ - 0 | Job | 1 | $0.00 |
| 7 | PC&I | Recapitalize Ice Radar (SLEP) | $ - 0 | Job | 1 | $0.00 |
| 8 | 45 | Impressed Current Cathodic Protection, Upgrade | $ - 0 | Job | 1 | $0.00 |
| 9 | 45 | Oceanographic Winch, Inspect and Test | $ - 0 | Job | 1 | $0.00 |
| 10 | 45 | Scientific and Ocean Engineering Systems, Control System Groom and Indicator Calibration | $ - 0 | Job | 1 | $0.00 |
| 11 | 45 | Damage Control and Firefighting Systems, PMS | $ - 0 | Job | 1 | $0.00 |
| 12 | 45 | Oily Water Separator, Annual Maintenance | $ - 0 | Job | 1 | $0.00 |
| 13 | 45 | Auxiliary Seawater System (ASW) Orifice Plate, Renew | $ - 0 | Job | 1 | $0.00 |
| 14 | PC&I | Aux Diesel Generator Starter (SLEP) | $ - 0 | Job | 1 | $0.00 |
| 15 | PC&I | Boiler Tube Sheet and Gauge Glass, Replace (SLEP) | $ - 0 | Job | 1 | $0.00 |
| 16 | 45 | Steam Coil Pre-Heaters, Inspect and Test | $ - 0 | Job | 1 | $0.00 |
| 17 | 45 | Refrigeration Plant, Maintain | $ - 0 | Job | 1 | $0.00 |
| 18 | 45 | Boiler, Annual Maintenance | $ - 0 | Job | 1 | $0.00 |
| 19 | 45 | Bow Crane, Biennial Inspect and Test | $ - 0 | Job | 1 | $0.00 |
| 20 | 45 | Internal Hoists, Maintenance, Inspection and Test | $ - 0 | Job | 1 | $0.00 |
| 21 | 45 | Grey Water Holding Tank(s), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 22 | 45 | Sewage Piping, Clean and Flush | $ - 0 | Job | 1 | $0.00 |
| 23 | 45 | Sewage Holding Tank(s), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 24 | 45 | Main Motor Lube Oil Tank Heater, Inspect | $ - 0 | Job | 1 | $0.00 |
| 25 | 45 | Ship Service Air Compressor, Overhaul | $ - 0 | Job | 1 | $0.00 |
| 26 | 45 | Flex Hose Assemblies, Renew | $ - 0 | Job | 1 | $0.00 |
| 27 | 45 | Fuel Oil Purifier (FOP) Overhaul | $ - 0 | Job | 1 | $0.00 |
| 28 | 45 | Lube Oil Purifier (LOP) Overhaul | $ - 0 | Job | 1 | $0.00 |
| 29 | PC&I | Relocate Cycloconverter Strainers (SLEP) | $ - 0 | Job | 1 | $0.00 |
| 30 | PC&I | Recapitalize MSW & ASW Valves (SLEP) | $ - 0 | Job | 1 | $0.00 |
| 31 | PC&I | Science Sea Water Strainer (SLEP) | $ - 0 | Job | 1 | $0.00 |
| 32 | 45 | A-Frames, Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 33 | 45 | Science Van Monorail System, Overhaul | $ - 0 | Job | 1 | $0.00 |
| 34 | 45 | Steam Trap, Renew | $ - 0 | Job | 1 | $0.00 |
| 35 | 45 | Steam Trap, Replace | $ - 0 | Job | 1 | $0.00 |
| 36 | 45 | Distilling Plant Condensate Dump Valves, Replace | $ - 0 | Job | 1 | $0.00 |
| 37 | 45 | Anchor Windlass, Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 38 | 45 | Mooring Capstan, Level 2 Overhaul | $ - 0 | Job | 1 | $0.00 |
| 39 | 45 | Port & Starboard Miranda Davit, Biennial Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 40 | 45 | Aft Crane (Starboard), Biennial maintenance, Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 41 | 45 | Aft Articulating Crane (Port), Annual maintenance, Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 42 | 45 | Deck Crane (Starboard), TB 100-55, Annual maintenance, Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 43 | 45 | Deck Crane (Port), TB 100-55, Bi-Annual maintenance, Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 44 | 45 | Trawl / Core Winch, Inspect and Test | $ - 0 | Job | 1 | $0.00 |
| 45 | 45 | Decks (Interior), Preserve | $ - 0 | Job | 1 | $0.00 |
| 46 | 45 | U/W Body, Diver Inspect | $ - 0 | Job | 1 | $0.00 |
| 47 | 45 | Deck Covering (Slip-Resistant) Forecastle Deck, Renew | $ - 0 | Job | 1 | $0.00 |
| 48 | 45 | Deck Covering (Insulating), Replace | $ - 0 | Job | 1 | $0.00 |
| 49 | 45 | Superstructure, Preserve (Partial) | $ - 0 | Job | 1 | $0.00 |
| 50 | 45 | Stack, Preserve (Partial) | $ - 0 | Job | 1 | $0.00 |
| 51 | 45 | Deck Socket, Renew | $ - 0 | Job | 1 | $0.00 |
| Total Task Order 1 Estimated Price | $0.00 | |||||
| 1 Weekday is Monday, Tuesday, Wednesday, Thursday and Friday. | ||||||
| 2 Weekend day is Saturday and Sunday |
Tab2 Task Order 1 Break Down
| Tab2 Task Order 1 Break Down |
| USCGC HEALY DOCK SIDE FY27 |
| 70Z08526RLREP0010 |
| Instructions: |
| Provide pricing including materials, labor, equiptment, and overhead & profit. |
Tab3 Comp Labor Rate Break Down
| Tab 3 Composite Labor Rate Break Down |
| USCGC HEALY DOCK SIDE FY27 |
| 70Z08526RLREP0010 |
| Instructions: |
| Provide average of the direct labor rates used, G&A and Profit. |