This is a pricing sheet for a dock-side maintenance and repair task order for the USCGC HEALY (WAGB 20), a U.S. Coast Guard icebreaker vessel, under solicitation number 70Z08526RLREP0010 for Fiscal Year 2027. The pricing sheet contains two main components: an attachment for additional work to be ordered on an as-needed basis, and a detailed Task Order 1 with 51 individual line items covering comprehensive vessel maintenance, repair, and modernization work.

The additional work component establishes a composite labor rate structure whereby contractors submit an hourly rate applied to 7,886 hours (with a total quantity of 9,696 hours referenced), along with an all-inclusive mark-up/loading rate for materials and subcontractors to be applied against a base amount of $100,000. Task Order 1 includes specific maintenance activities such as fire prevention, temporary cutter services, sea trial support (priced separately for five weekdays and one weekend day), and numerous planned maintenance and modernization items including recapitalization of network infrastructure, cathodic protection upgrades, system inspections and overhauls (boiler, refrigeration, diesel generator components), equipment maintenance (cranes, winches, davits), and preservation work on decks and superstructure. All line items in Task Order 1 are currently priced at zero pending contractor quotation. Contractors must provide pricing inclusive of materials, labor, equipment, and overhead and profit, with composite labor rates broken down by direct labor costs, general and administrative expenses, and profit margin.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pricing Sheet

ATTACHMENT 1: Pricing Sheet
USCGC HEALY DOCK SIDE FY27
70Z08526RLREP0010
Contract Line Item (CLIN)TitleUnit PriceUnitQuantityTotal CLIN Price
1TAB 1: Task Order Pricing Sheet$ - 0Lump Sum1$0.00
2Additional Work To Be Ordered- Insert your Composite Labor Rate Unit Price: $______; Quantity: 9,696; Unit of Issue: Hour; Insert your Extended Price: [7,886 X hourly rate quoted] $____________.

Insert your all inclusive mark-up/loading rate for materials and subcontractors: ____%. Unit Price: $314,618.00; Quantity: 1; Unit of Issue: Percent; Insert your Extended Price: [$100,000.00 X ( 1 + percentage quoted)] : $__________.

The above rate and percentage will be incorporated into the contract and used on change requests (CRs). Work is ordered against this CLIN on authorized CRs by the Contracting Officer.

Total Pricing Sheet Estimated Price $0.00

Tab1 Task Order 1

Tab 1Task Order 1
USCGC HEALY DOCK SIDE FY27
70Z08526RLREP0010
Contract Line Item (CLIN)Funding CodeTitleUnit PriceUnitQuantityTotal CLIN Price
145Fire Prevention, Provide$ - 0Job1$0.00
245Temporary Services, Provide - Cutter$ - 0Job1$0.00
345Tenting, Provide (Optional)$ - 0Job1$0.00
445Sea Trial Performance, Support, Provide - Price CLIN for five (5) weekdays1 and one (1) weekend day2. Insert price per day for weekdays1 here: $__________ . Insert price per day for weekend days2 here: $__________to be used in a change request.$ - 0Day4$0.00
5PC&IRecapitalize Science Data Network Infrastructure (SLEP)$ - 0Job1$0.00
6PC&IRecapitalize CGOne Network Infrastructure (SLEP)$ - 0Job1$0.00
7PC&IRecapitalize Ice Radar (SLEP)$ - 0Job1$0.00
845Impressed Current Cathodic Protection, Upgrade$ - 0Job1$0.00
945Oceanographic Winch, Inspect and Test$ - 0Job1$0.00
1045Scientific and Ocean Engineering Systems, Control System Groom and Indicator Calibration$ - 0Job1$0.00
1145Damage Control and Firefighting Systems, PMS$ - 0Job1$0.00
1245Oily Water Separator, Annual Maintenance$ - 0Job1$0.00
1345Auxiliary Seawater System (ASW) Orifice Plate, Renew$ - 0Job1$0.00
14PC&IAux Diesel Generator Starter (SLEP)$ - 0Job1$0.00
15PC&IBoiler Tube Sheet and Gauge Glass, Replace (SLEP)$ - 0Job1$0.00
1645Steam Coil Pre-Heaters, Inspect and Test$ - 0Job1$0.00
1745Refrigeration Plant, Maintain$ - 0Job1$0.00
1845Boiler, Annual Maintenance$ - 0Job1$0.00
1945Bow Crane, Biennial Inspect and Test$ - 0Job1$0.00
2045Internal Hoists, Maintenance, Inspection and Test$ - 0Job1$0.00
2145Grey Water Holding Tank(s), Clean and Inspect$ - 0Job1$0.00
2245Sewage Piping, Clean and Flush$ - 0Job1$0.00
2345Sewage Holding Tank(s), Clean and Inspect$ - 0Job1$0.00
2445Main Motor Lube Oil Tank Heater, Inspect$ - 0Job1$0.00
2545Ship Service Air Compressor, Overhaul$ - 0Job1$0.00
2645Flex Hose Assemblies, Renew$ - 0Job1$0.00
2745Fuel Oil Purifier (FOP) Overhaul$ - 0Job1$0.00
2845Lube Oil Purifier (LOP) Overhaul$ - 0Job1$0.00
29PC&IRelocate Cycloconverter Strainers (SLEP)$ - 0Job1$0.00
30PC&IRecapitalize MSW & ASW Valves (SLEP)$ - 0Job1$0.00
31PC&IScience Sea Water Strainer (SLEP)$ - 0Job1$0.00
3245A-Frames, Inspect and Repair$ - 0Job1$0.00
3345Science Van Monorail System, Overhaul$ - 0Job1$0.00
3445Steam Trap, Renew$ - 0Job1$0.00
3545Steam Trap, Replace$ - 0Job1$0.00
3645Distilling Plant Condensate Dump Valves, Replace$ - 0Job1$0.00
3745Anchor Windlass, Inspect and Repair$ - 0Job1$0.00
3845Mooring Capstan, Level 2 Overhaul$ - 0Job1$0.00
3945Port & Starboard Miranda Davit, Biennial Inspect and Repair$ - 0Job1$0.00
4045Aft Crane (Starboard), Biennial maintenance, Inspect and Repair$ - 0Job1$0.00
4145Aft Articulating Crane (Port), Annual maintenance, Inspect and Repair$ - 0Job1$0.00
4245Deck Crane (Starboard), TB 100-55, Annual maintenance, Inspect and Repair$ - 0Job1$0.00
4345Deck Crane (Port), TB 100-55, Bi-Annual maintenance, Inspect and Repair$ - 0Job1$0.00
4445Trawl / Core Winch, Inspect and Test$ - 0Job1$0.00
4545Decks (Interior), Preserve$ - 0Job1$0.00
4645U/W Body, Diver Inspect$ - 0Job1$0.00
4745Deck Covering (Slip-Resistant) Forecastle Deck, Renew$ - 0Job1$0.00
4845Deck Covering (Insulating), Replace$ - 0Job1$0.00
4945Superstructure, Preserve (Partial)$ - 0Job1$0.00
5045Stack, Preserve (Partial)$ - 0Job1$0.00
5145Deck Socket, Renew$ - 0Job1$0.00
Total Task Order 1 Estimated Price$0.00
1 Weekday is Monday, Tuesday, Wednesday, Thursday and Friday.
2 Weekend day is Saturday and Sunday

Tab2 Task Order 1 Break Down

Tab2 Task Order 1 Break Down
USCGC HEALY DOCK SIDE FY27
70Z08526RLREP0010
Instructions:
Provide pricing including materials, labor, equiptment, and overhead & profit.

Tab3 Comp Labor Rate Break Down

Tab 3 Composite Labor Rate Break Down
USCGC HEALY DOCK SIDE FY27
70Z08526RLREP0010
Instructions:
Provide average of the direct labor rates used, G&A and Profit.

File details come from the government source that posted it. Updated .