This document provides clarifications for solicitation 70Z08524RIBCT0001, which seeks drydock repairs to the USCGC ANTHONY PETIT, a 175-foot Keeper class cutter homeported in Ketchikan, Alaska. The repairs must be performed within the protected waters of Southeast Alaska and the Pacific Northwest due to safety concerns associated with operating the vessel in more hazardous conditions. Responses are due no later than March 6, 2024 with award anticipated on or about March 27, 2024. Offerors must provide pricing in U.S. dollars, relevant past performance, certifications, a warranty statement, and a compliance plan. The solicitation will be awarded without discussions so the response must be complete and include the offeror's best price. Questions are due by February 28 with responses posted for all potential offerors. Only Joint Certification Program certified U.S. or Canadian contractors can access certain restricted technical documents.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Clarifications for Solicitation 70Z08524RIBCT0001 1.Work Item 71: Decks – Exterior, Preserve, Non-Skid Broadcast Grit System
On the Anthony Petit, do all the exterior decks mentioned in paragraph 1.1 have Slip Resistant Sheets on them currently? Yes, they all have slip resistant sheets on them currently.
01 Deck – Forecastle 01 Deck – Port and Starboard Air Castles 01 Deck – Starboard Boat Deck 01 Deck – Fantail 02 Deck 03 Deck Flying Bridge Is your intent to apply non-skid coating on this work item, or Slip Resistant Sheets?
Answer: Our intent is to apply non-skid coating (broadcast), not the sheets.
2. Paragraph 3.4.4.1 AC system repair does not appear to be related to this project. Is there something we need to repair on the AC system?
Answer: No there isn’t, please disregard.
3. Paragrph 1.1 lists the work items that tenting should be covered under as
• WORK ITEM 35: Superstructure, Preserve, Partial
• WORK ITEM 72: Decks - Exterior, Preserve, Non-Skid Broadcast Grit System
• WORK ITEM 73: Decks - Exterior (Buoy or Construction Deck), Preserve 100%
Work Item 73 is not for Decks. This appears to be corrected on page 246 for Items 35, 71 and 72. Please advise the correct work item numbers.
Answer: D-060 should apply to WI 35, 71 and 72. Not 73.
4. SF-1449 block 3/6/24 lists offer due date / time as 3/6/24 11:00.
Instructions to Offerors paragraph 9 (page 9) states that responses are due no later than 8 AM PST on March 6, 2024
Please clarify time of bid deadline.
Answer: The Bid Deadline is March 6, 2024 at 8am PST
5. Contractor is requesting an extension the clarification date to 1Mar 12PM PST.
Answer: Approved, RFC deadline is March 1, 2024 at 12pm PST
6. Could the Coast Guard entertain a week extension to allow sufficient time to get the engineers certificate?
Answer: We are on a tight schedule due to operational commitments that require a period of performance. To award a contract also requires due diligence to ensure that all offers are evaluated to ensure that the most advantageous offer to the government is selected. Due to the timeline, we are not able to extend the solicitation.
7. The time period allotted to prepare the bid and submit questions is not adequate for a project of this scope and size. With the added cybersecurity requirements associated with the Controlled Unclassified Information (CUI), a significant amount of time is needed to work with our subcontractors verifying all the requirements are met to be able to share the CUI information with those subcontractors that require those file for preparing their bids. The request for references took a longer period of time to be sent out. This has caused a delay in starting the process of soliciting RFQ’s from subcontractors and the initial review of the project. We are requesting an extension of the Bid Due Date from 3/6/2024 to 4/5/2024. We are requesting an extension of the Bid Question Due Date from 2/28/2024 to 3/25/2024.
Answer: We are on a tight schedule due to operational commitments that require a period of performance. To award a contract also requires due diligence to ensure that all offers are evaluated to ensure that the most advantageous offer to the government is selected. Due to the timeline, we are not able to extend the solicitation.
We have extended the Bid Question due date from 2/28/2024 to 3/1/2024 at 12pm PST