Attachment 2 - KENNEBEC DD 21 SPEC Rev2_08Oct20.pdf

DoD Form Rev. 2, Oct 8, 2020 PDF 3 MB Posted

Attached to
USCG KENNEBEC DRY DOCK REPAIRS FY21
Solicitation number
70Z085-21-Q-P4500300
Issued by

View the file

Other versions and copies of DD Form 21

File Revision Posted Attached to
Attachment 2 - KENNEBEC DD 21 SPEC Rev3 dated 19Oct20.pdf Rev. 3, Oct 19, 2020 USCG KENNEBEC DRY DOCK REPAIRS FY21
CDC-RFA-DD21-2103 rev3.pdf Rev. 3 Improving the Health of People with Mobility Limitations and Intellectual/Developmental Disabilities through State-based Public Health Programs
CDC-RFA-DD21-2103 rev3.pdf Rev. 3 Improving the Health of People with Mobility Limitations and Intellectual/Developmental Disabilities through State-based Public Health Programs
CDC-RFA-DD21-2103 rev2.pdf Rev. 2 Improving the Health of People with Mobility Limitations and Intellectual/Developmental Disabilities through State-based Public Health Programs
Attachment 2 - KENNEBEC DD 21 SPEC Rev1_30Sep20.pdf Rev. 1, Sep 30, 2020 USCG KENNEBEC DRY DOCK REPAIRS FY21
DD-21-001 Amendment 1.pdf Amendment 1 Study to Explore Early Development (SEED) Follow up Studies
DD-21-001 Amendment 1.pdf Amendment 1 Study to Explore Early Development (SEED) Follow up Studies
CDC-RFA-DD21-2103 27 Apr 2021.pdf Apr 27, 2021 Improving the Health of People with Mobility Limitations and Intellectual/Developmental Disabilities through State-based Public Health Programs
DD21 2103 Informational Call QA 041621cc.docx Revision not stated Improving the Health of People with Mobility Limitations and Intellectual/Developmental Disabilities through State-based Public Health Programs
DD21-2013 Informational Call Script 040721.docx Revision not stated Improving the Health of People with Mobility Limitations and Intellectual/Developmental Disabilities through State-based Public Health Programs
CDC-RFA-DD21-2104.pdf Revision not stated Improving Health of Americans with Mobility Limitations Through Evidence-Based Health Promotion Programs
CDC-RFA-DD21-2102.pdf Revision not stated Improving Health of Americans with Intellectual and Developmental Disabilities Through Evidence-Based Health Promotion Programs
CDC-RFA-DD21-2103.pdf Revision not stated Improving the Health of People with Mobility Limitations and Intellectual/Developmental Disabilities through State-based Public Health Programs
RFA-DD-21-002 Final.pdf Revision not stated Characterizing the Natural History of Fragile X Syndrome to Inform the Development of Intervention Outcome Measures
RFA-DD-21-001.pdf Revision not stated Study to Explore Early Development (SEED) Follow up Studies
CDC-RFA-DD21-2101.pdf Revision not stated Advancing Population-Based Surveillance of Birth Defects
RFA-DD-21-001.pdf Revision not stated Study to Explore Early Development (SEED) Follow up Studies
RFA-DD-21-001.pdf Revision not stated Study to Explore Early Development (SEED) Follow up Studies
HEALY DD21 Sources Sought Questionnaire.docx Revision not stated Dry-Dock (DD): USCGC HEALY Fiscal Year 2021
Show all 19

Who attaches DD Form 21

Other files

File Type Posted
KENNEBEC DD FY21 Amendment 06_SF30.pdf PDF
KENNEBEC DD FY21 Amendment 05_SF30.pdf PDF
KENNEBEC Amendment 5 - 8 Attachments.zip ZIP file
KENNEBEC DD FY21 Amendment 05_QandA 28-29.pdf PDF
KENNEBEC DD FY21 Amendment 04_SF30.pdf PDF
KENNEBEC Amendment 04 - 6 Draw-Pub Pack.zip ZIP file
KENNEBEC DD FY21 Amendment 04_QandA 16-27.pdf PDF
KENNEBEC DD FY21 Amendment 03_QandA 01-15.pdf PDF
KENNEBEC Amend 03 Drawings Pack.zip ZIP file
Attachment 1 - KENNEBEC DD FY21 SSOS Price Sheet Rev1_19Oct20.xlsx XLSX spreadsheet
Attachment 2 - KENNEBEC DD 21 SPEC Rev3 dated 19Oct20.pdf PDF
KENNEBEC DD FY21 Amendment 03_SF30.pdf PDF
KENNEBEC DD FY21 Amendment 02-SF30.pdf PDF
KENNEBEC DD FY21 Amendment 01-SF30.pdf PDF
Attachment 2 - KENNEBEC DD 21 SPEC Rev1_30Sep20.pdf PDF
Attachment 1 - KENNEBEC DD FY21 SSOS Price Sheet-R1_07Oct20.xlsx XLSX spreadsheet
Attachment 4 - KENNEBEC Request for Clarification Form.docx DOCX document
Attachment 2 - KENNEBEC DD FY21 SPEC Rev0_04Aug20.pdf PDF
Attachment 3 - Past Performance Information Form.docx DOCX document
KENNEBEC DD FY21 RFQ-70Z085-21-Q-P4500300FINAL_05Oct20.pdf PDF
Attachment 6 - KENNEBEC JOCTFOC(Redacted).pdf PDF
Attachment 5 - USCG Ombudsman Notice.pdf PDF
Attachment 1 - KENNEBEC DD FY21 SSOS Price Sheet.xlsx XLSX spreadsheet
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC KENNEBEC (WLIC 802)

SPECIFICATION FOR DRYDOCK REPAIRS

FY2021

Developed By: CWO Robert E Ozment

(Rev-2, 08 October 2020)

USCGC KENNEBEC (WLIC-160B) DRYDOCK AVAILABILITY FY2021

ii (Rev-2)

TABLE OF CONTENTS

Revisions Record .......................................................................................................................................... iv Consolidated List of References .................................................................................................................... v Consolidated List of Government-furnished Property .................................................................................. x Consolidated List of Critical Inspection Items ............................................................................................. xi Principal Characteristics ............................................................................................................................. xii General Requirements WORK ITEM 1: Hull Plating (U/W Body), Inspect WORK ITEM 2: Hull Plating (U/W Body), Ultrasonic Testing WORK ITEM 3: U/W Body, Preserve (100%) WORK ITEM 4: Hull Plating Freeboard, Preserve “100%” WORK ITEM 5: Hull and Structural Plating (General) - 12.75-Pound Steel Plate, Renew WORK ITEM 6: Hull and Structural Plating (General) - 15.3-Pound Steel Plate, Renew WORK ITEM 7: Hull And Structural Plating (General) - 20.4-Pound Steel Plate, Renew WORK ITEM 8: Hull and Structural Plating (General) - Degraded Weld (Steel), Repair WORK ITEM 9: Appendages (U/W), Leak Test WORK ITEM 10: Propulsion Shaft Fairwaters And Rope Guards, Inspect WORK ITEM 11: Appendages (U/W) - Internal, Preserve WORK ITEM 12: Voids (Non-Accessible), Leak Test WORK ITEM 13: Voids (Non-Accessible), Internal Surfaces, Preserve WORK ITEM 14: Tanks (Ballast), Clean and Inspect WORK ITEM 15: Propulsion Shaft Seals (Inflatable), Inflatable Renewal WORK ITEM 16: Propulsion Shafting; Remove, Inspect, and Reinstall WORK ITEM 17: Propulsion Shafting, Straighten WORK ITEM 18: Mechanical Shaft Seal Assemblies, Renew WORK ITEM 19: Propulsion Shaft Bearings (External), Renew WORK ITEM 20: Propulsion Stern Tube Bearings, Renew WORK ITEM 21: Stern Tube Interior Surfaces, Preserve 100% WORK ITEM 22: Propeller s, Remove, Inspect, and Reinstall WORK ITEM 23: Propeller, Minor Repairs and Reconditioning, Perform WORK ITEM 24: Keel Coolers, Clean, Inspect and Hydro WORK ITEM 25: Main Diesel Engine (MDE) Exhaust Piping, Commercial Clean WORK ITEM 26: Ship Service Diesel Generator (SSDG) Exhaust Piping, Commercial Clean WORK ITEM 27: Fathometer Transducer, Renew WORK ITEM 28: Sea Valves and Waster Pieces, Overhaul Or Renew WORK ITEM 29: Sea Strainers (All Sizes), Renew WORK ITEM 30: Sea Strainers - Duplex (All Sizes), Overhaul WORK ITEM 31: Rudder Assembly; Remove, Inspect And Reinstall WORK ITEM 32: Rudder(s), Preserve (“100%”) WORK ITEM 33: Rudder Stock Housing (Lower), Renew WORK ITEM 34: Rudder Stock Housing (Upper), Renew WORK ITEM 35: Hull Fittings (Mooring and Towing), Inspect and Test WORK ITEM 36: Spuds, Overhaul WORK ITEM 37: Spud Wells, Preserve WORK ITEM 38: Spud Wells, Inspect WORK ITEM 39: Sewage Holding Tank(s), Clean and Inspect WORK ITEM 40: Sewage Piping, Clean And Flush WORK ITEM 41: Tanks (Sewage Holding), Preserve “100%” WORK ITEM 42: Tanks (Sewage Vacuum Collection), Preserve “Partial” iii (Rev-2)

WORK ITEM 43: Accessible Void(s), Preserve, Partial, WORK ITEM 44: Tanks (Sewage Vacuum Collection), Preserve “100%” WORK ITEM 45: Exhaust Stacks (Exterior), Preserve - Partial WORK ITEM 46: Cathodic Protection, Zinc Anodes, Renew, WORK ITEM 47: Drydock WORK ITEM 48: Temporary Services, Provide - Tender WORK ITEM 49: Sea Trial Performance, Support, Provide WORK ITEM 50: Main Mast, Preserve, 100% WORK ITEM 51: Bilges, Preserve WORK ITEM 52: Boat Davit Winch, Shrink Wrap WORK ITEM 53: Buoy and Cargo Handling Crane, Shrink Wrap WORK ITEM 54: Deck Covering (Interior Wet/Dry), Renew WORK ITEM 55: Lead-Based Paint, Perform Spot Abatement WORK ITEM 56: Hull And Structural Plating (General) - Cracked Steel Welds, Repairs WORK ITEM 57: Tanks (Sewage Holding), Preserve “Partial” WORK ITEM 58: Lead-Based Paint and Asbestos-Containing Material, Perform Partial Abatement WORK ITEM 59: Lead-Based Paint and Asbestos-Containing Material, Perform Spot Abatement WORK ITEM 60: Compressed Air Piping Renew WORK ITEM 61: Hull, Forepeak, Repair WORK ITEM 62: Forepeak Void Sounding Tube Repair WORK ITEM 63: Exterior Deck Drains, Inspect WORK ITEM 64: Sewage Deck Risers, Renew WORK ITEM 65: Lead Dust, Clean WORK ITEM 66: Weather Deck, Kickpipes, Renewal WORK ITEM 67: Pilot House Overhead, Repair WORK ITEM 68: Watertight Hatches and Scuttles, Renew iv (Rev-2)

REVISIONS RECORD

This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

07OCT2020 02 28,29,30

Removed obsolete drawings and inserted correct drawings.

Coast Guard Drawing 160B WLIC 4803-1, Rev-, Arrg Fire Main Sys Piping

07OCT2020 02 12,13 Removed obsolete drawings and inserted correct drawings.

Coast Guard Drawing 160B WLIC 1102-001, Rev D, Fore

& Aft Peak Framing

07OCT2020 02 Removed incorrect drawing (160B-WLIC 103-02, Rev A, Booklet of General Plans) and added correct drawing.

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

v (Rev-2)

CONSOLIDATED LIST OF REFERENCES

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.

All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.

COAST GUARD DRAWINGS

Coast Guard Drawing 160 WLIC 1101-001, Rev C, Shell Pltg Expansion & Framing

Coast Guard Drawing 160 WLIC 1101-1, Rev C, Shell Pltg Expansion & Framing

Coast Guard Drawing 160 WLIC 1107-1, Rev L, Dk House Eng Casing & Stacks

Coast Guard Drawing 160 WLIC 1201-001, Rev D, Hull Fittings and Chain Stoppers

Coast Guard Drawing 160 WLIC 1205-001, Rev F, Spudwells and Spuds

Coast Guard Drawing 160 WLIC 244-003, GA OF 6" TYPE FSE MANEGUARD SEAL (SUPERSEDS

160-WLIC-244-001, 160-WLIC-244-002) Rev -, Type FSE Seal (6” Fully Split)

Coast Guard Drawing 160 WLIC 4105-006 Engine Cooling System (KENNEBEC)

Coast Guard Drawing 160 WLIC 4105-007, Rev -, Arrangement Of Engine Cooling Piping

(KENNEBEC)

Coast Guard Drawing 160 WLIC 4105-3, Rev H, Arrgt Eng & Boiler Exhaust

Coast Guard Drawing 160 WLIC 4301-001, Rev G, Shafting & Prop Arrgt & Dets (Applicable for both A and B class)

Coast Guard Drawing 160 WLIC 4301-003, Rev C, Shafting Arrangement and Details

Coast Guard Drawing 160 WLIC 4301-1, Rev F, Shafting & Prop Arrgt & Dets

Coast Guard Drawing 160 WLIC 4800-1, Rev-, Sea Chest Structures

Coast Guard Drawing 160 WLIC 4804-1, Rev-, Diagram Fresh Water System

Coast Guard Drawing 160 WLIC 4804-3, Rev -, Vacuum Toilet Install - Piping Of

Coast Guard Drawing 160B WLIC 0500-001, Rev -, Lines Corrected

Coast Guard Drawing 160B WLIC 700-001, Rev B, Docking Plan (KENNEBEC)

Coast Guard Drawing 160B WLIC 103-003, Rev-, Booklet of General Plans

Coast Guard Drawing 160B WLIC 1101-001, Rev C, Shell Plating Expansion and Longitudinal Framing

Coast Guard Drawing 160B WLIC 1102-001, Rev D, Fore & Aft Peak Framing

Coast Guard Drawing 160B WLIC 1103-002, Rev A, Vertical Keel, Skeg, and Bottom Girders

Coast Guard Drawing 160B WLIC 1108-002, Rev B, Shaft Struts and Stern Tubes

Coast Guard Drawing 160B WLIC 1108-002, Rev B, Shaft, Struts, And Stern Tubes

Coast Guard Drawing 160B WLIC 1205-1, Rev F, Spudwells and Spuds

Coast Guard Drawing 160B WLIC 1205-3, Rev B, Hull Zinc

Coast Guard Drawing 160B WLIC 1702-1, Rev F, Foremast, Mn Mast, Ensign Staff & Dets vi (Rev-2)

Coast Guard Drawing 160B WLIC 2200-001 (Including BM-32), Rev A, Steering Machinery

Arrangement Rudder Stock & Fitting

Coast Guard Drawing 160B WLIC 2200-001, Rev A, Steering Machinery Arrangement Rudder Stock &

Fitting

Coast Guard Drawing 160B WLIC 2200-001, Rev A, Steering Machinery Arrangement, Rudder Stock and Fittings

Coast Guard Drawing 160B WLIC 2901-004, Rev -, Curves of Form

Coast Guard Drawing 160B WLIC 4105-006, Rev -, Engine Cooling System (KENNEBEC) (802)

Coast Guard Drawing 160B WLIC 4803-1, Rev-, Arrg Fire Main Sys Piping

Coast Guard Drawing 160B WLIC 4808-1, Rev-, Pollution & Drainage Sys

Coast Guard Drawing 160B-WLIC 1101-1, Rev E, Shell Plating Expansion & Framing

Coast Guard Drawing 160B-WLIC 1103-1, Rev B, Web & Trans, Framing

Coast Guard Drawing 160B-WLIC 1107-02, Rev D, Pilot House

Coast Guard Drawing 160B-WLIC 4900-01, Rev -, Diagram Compressed Air System

Coast Guard Drawing 160B-WLIC 4900-02, Rev -, Arrangement Compressed Air System

COAST GUARD DRAWING 160B-WLIC-1602-02, REV A, WT & WEAT DRS, HATCHES, SCTLES

& MANHOL SCHED

COAST GUARD DRAWING 160B-WLIC-3901-1, REV C, INSULATION & SHEATHING

Coast Guard Drawing 160-WLIC 4400-3, Rev A, Propeller (Supersedes 160-WLIC-4400-001, 4400-002, & 160B-WLIC-4400-001)

Coast Guard Drawing 160-WLIC 1112-04, Rev G, Misc. Foundations Outside Machinery Space

Coast Guard Drawing 160-WLIC 244-3, Rev B, GA OF 6" Type FSE Maneguard Seal

Coast Guard Drawing 160-WLIC 4400-3, Rev A, Propeller (Supersedes 160-WLIC-4400-001, 4400-002, & 160B-WLIC-4400-001)

Coast Guard Drawing 160-WLIC 4808-2, Rev -, Weather Deck Drains

Coast Guard Drawing 160-WLIC 6700-3, Rev D, Booklet of General Elex Arrg, Wrg & Details

Coast Guard Drawing 160-WLIC_1103_2_1_A VERT KEEL, SKEG, BOTT GIRDERS

COAST GUARD DRAWING 160-WLIC-1602-02, REV G, WT DOORS, SCUTTLES & MANHOLES

SCHED

Coast Guard Drawing 160-WLIC-6202_2, Rev. H, Power Deck Plan

Coast Guard Drawing 160-WLIC-6202-17, Rev._, One Line Electrical Diagram For Power Panel

Upgrade.

Coast Guard Drawing 160-WLIC-6405_1, Rev. E, Navigational Lights ARR. & Wiring Diagram.

Coast Guard Fleet Drawing FL 2602-10, Rev R, Spud Arrangements and Details

Coast Guard Fleet Drawing FL 2804-12, Rev -, U.S.C.G. Emblem

Coast Guard Fleet Drawing FL 2804-22, Rev-, Consolidated Visual ID for Cutters

Coast Guard Yard Drawing {xxxxxx}, Rev {x}, Title

NAVSEA DRAWING 804-5773931, ACOUSTIC & THERMAL INSULATION FOR COMPT

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors

Manual

Coast Guard Technical Publication (TP) 3494, Aug 2013, Technical Manual for Type F.S.E. Seal

Coast Guard Technical Publication (TP) 4914, 12-NOV-18, FSE Shaft Seal - 2nd Generation vii (Rev-2)

Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, 2018, General

Requirements

Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0740, 2018, Welding and Allied

Processes

Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 3041, 2018, Shipboard

Electrical Cable Test

Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 3042, 2018, Shipboard

Electrical Cable Removal, Relocation, Splice, Repair, and Installation

Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 6310, 2018, Requirements for

Preservation of Ship Structures

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General

Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and

Allied Processes

Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2018, Auxiliary

Machine Systems

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures

Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2018, Drydocking

Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2018, Temporary

Services

Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2018, Temporary

Hull Accesses

OTHER REFERENCES

American Bureau of Shipping (ABS) 2, Rule Requirements for Survey After Construction, 2018, Part 7, Appendix Section 10, Guide for Bronze and Stainless Steel Propeller Castings

American Society of Mechanical Engineers (ASME) B16.34, 2017, Valves-Flanged, Threaded, and

Welding End

ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets

ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet Gaskets

ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets

ASTM International (ASTM) D1709, 2008, Standard Test Methods for Impact Resistance of Plastic Film by the Free-Falling Dart Method

ASTM International (ASTM) D1922, 2008, Standard Test Method for Propagation Tear Resistance of

Plastic Film and Thin Sheeting by the Pendulum Method

ASTM International (ASTM) D3951, Reapproved 2010, Standard Practice for Commercial Packaging

ASTM International (ASTM) D4138, 2013, Standard Practices for Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means

ASTM International (ASTM) D5363, 2008; Standard Specification for Anaerobic Single-Component

Adhesives (An)

ASTM International (ASTM) D5363, 2016, Standard Specification for Anaerobic Single-Component

Adhesives (AN)

ASTM International (ASTM) D882, 2009, Standard Test Method for Tensile Properties of Thin Plastic

Sheeting viii (Rev-2)

ASTM International (ASTM) F992, 2017, Standard Specification for Valve Label Plates

Code of Federal Regulations (CFR) Title 29, Part 1915, 2018, Occupational Safety and Health Standards for Shipyard Employment

Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound; Anti-seize, Zinc Dust-

Petrolatum

Commercial Item Description (CID) A-A-59316, 2016, Abrasive Materials; for Blasting

Environmental Protection Agency (EPA) 600/4-85-049, Nov 1985, Measuring Airborne Asbestos

Following an Abatement Action

Federal Specification (Fed Spec) HH-P-151, Mar 1991, Packing; Rubber-Sheet, Cloth-Insert

Fernstrum Gridcooler Installation and Maintenance Manual, 2013, Form 175

For Caterpillar applications, use CAT Extended Life Pre-Mix coolant.)

International Standard For Organization (ISO) 484/2, 1981, Shipbuilding - Ship Screw Propeller -

Manufacturing Tolerances - Part 2: Propellers of Diameter Between 0.80 and 2.50 m, Inclusive

International Standard For Organization (ISO) 484/2, 1981, Shipbuilding - Ship Screw Propeller -

Manufacturing tolerances - Part 2: Propellers of Diameter Between 0.80 and 2.50m, Inclusive

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2013 Edition, Pressure Testing Of Steel Valves

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2017 Edition, Butterfly Valves

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 2018 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service

Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2013 Edition, Bronze Gate, Globe, Angle and Check Valves

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS), SP-58, 2009, Pipe

Hangers and Supports – Materials, Design, Manufacture, Selection, Application and Installation

MIL PRF-16173, Sep 2006, Corrosion Preventive Compound, Solvent Cutback, Cold-Application

MIL-A-18001, May 2005, Anodes, Sacrificial Zinc Alloy (Commercially Accepted - ASTM B418)

MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning

MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning

MIL-I-3064, Mar 1991, Insulation, Electrical, Plastic-Sealer

Military Specification MIL-A-22262B, March 1996, Abrasive Blasting Media Ship Hull Blast Cleaning

MIL-PRF-16173, 2006, Corrosive Preventive Compound, Solvent Cutback, Cold Application

MIL-PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut-Back, Cold-Application

MIL-PRF-16173, Sep 2006, Corrosion Preventive Compound, Solvent Cutback, Cold-Application

MIL-PRF-24647, Jan 2018, Paint System, Anticorrosive and Antifouling, Ship Hull

MIL-S-45180, 1998, Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant

MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant

MIL-STD-167-1, Nov 2005, Mechanical Vibrations of Shipboard Equipment (Type I - Environmental and Type II - Internally Excited)

MIL-STD-2003-3, Sep 2009, Electric Plant Installation Standard Methods for Surface Ships &

Submarines (Penetrations)

MIL-STD-2191, Nov 1992, Repair Welding, Weld Cladding, Straightening, and Cold Rolling of Main

Propulsion Shafting ix (Rev-2)

Naval Sea Systems Command (NAVSEA) Underwater Ship Husbandry Manuals (UWSH) S0600-AA-

PRO-160, Jan 2011, Chapter 16, Cofferdams

Naval Sea Systems Command (NAVSEA) Underwater Ship Husbandry Manuals (UWSH) S0600-AA-

PRO-160, Nov 2011, Chapter 16, Cofferdams

Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 2018 Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric

Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 2018, Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric

The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning

The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 11 (SSPC-SP 11), 2007, Power Tool Cleaning to Bare Metal

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2015, Solvent Cleaning

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2012, Power Tool Cleaning to Bare Metal

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2012, Power-Tool Cleaning to Bare Metal

The Society for Protective Coatings (SSPC) Surface Preparation Standard No. 11 (SSPC-SP 11), 2013, Power-Tool Cleaning to Bare Metal

The Society for Protective Coatings (SSPC), January 2015, Paint Application Specification No. 2 (PA-2), Procedure for Determining Conformance to Dry Coating Thickness Requirements

The Society for Protective Coatings (SSPC)/NACE International (NACE) 2007, Joint Surface Preparation

Standard SSPC-SP 10/NACE No. 2, Near-White Metal Blast Cleaning

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation

Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation

Standard SSPC-SP 12/NACE No.5, 2002, Surface Preparation and Cleaning of Metals by

Waterjetting Prior to Recoating

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation

Standard SSPC-SP WJ-2, 2012, Waterjet Cleaning of Metals – Very Thorough Cleaning

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation

Standard SSPC-SP WJ-2/NACE WJ-2, 2012, Waterjet Cleaning of Metals – Very Thorough

Cleaning

The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation

Standard SSPC-SP 10/NACE No. 2, 2004, Near-White Blast Cleaning

The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation

Standard SSPC-SP 10/NACE No. 2, 2007, Near-White Metal Blast Cleaning x (Rev-2)

CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK

ITEM

MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED

COST

($/UNIT)

15 N 160’WLIC Major

Overhaul Kit

H78011-01-9 2 ea. 8,000.00

16 Y **Propeller shaft NSN: 1 ea.

18 Y Wartsila Type FSE

Seal (6― Fully

Split). Shaft Seal

Assembly PN:

H78011-01

NSN: 2995-01-604-5903 2 ea. 14,595.86

19 N Aft Strut Bearing NSN: 3120-01-051-2510 2 ea. 683.00

20 N Stern Tube Bearing NSN: 3120-01-046-8511 2 ea. $1865

22 Y Propeller (right hand) NSN: 2010-01-037-7295 1 ea. $

22 Y Propeller (left hand) NSN: 2010-01-037-7597 1 ea. $

24 N Coolant (QTY in gallons)

NSN: 6850-01-675-1778 450 GLS 9,000.00

27 N ***Fathometer

Transducer, Shallow

Water, 50-200 kHz

(Airmar Technology

SS505)

NSN: 5845-01-470-2500 1 ea. 343.63

31 Y **Rudder Blade NSN: 2040-01-560-3314 1 ea. 25,000.00

31 Y **Rudder stock NSN: 2040-01-563-7697 1 ea. 9,000.00

31 N Bearing Sleeve NSN: 3120-01-560-3316 1 ea. 2.500.00

47 Y *Transducer Cover

Plate

N/A 2 ea. 50.00

68 N Scuttle, 21 inch, Raised 803-1401892-A 3 ea. 1,600.00

68 N Scuttle, 21 inch, Flush 803-1624056 3 ea. 1600.00

68 N Steel, Raised

Watertight Hatch 30 x

36, w/25 inch Scuttle

805-1624087 MOD 1 ea. 4500.00

68 N Steel Raised Watertight

Hatch 42 x 48, w/25 inch Scuttle

805-1624088 MOD 1 ea. 5200.00

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xi (Rev-2)

CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS

The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5

(Inspection report particulars)):

Work

Item Title

2 Hull Plating (U/W Body), Ultrasonic Testing

3 U/W Body, Preserve (100%)

9 Appendages (U/W), Leak Test

12 Voids (Non-Accessible), Leak Test

15 Propulsion Shaft Seals (Inflatable), Inflatable Renewal

16 Propulsion Shafting; Remove, Inspect, and Reinstall

19 Propulsion Shaft Bearings (External), Renew

30 Sea Strainers - Duplex (All Sizes), Overhaul

31 Rudder Assembly; Remove, Inspect And Reinstall

51 Bilges, Preserve

54 Deck Covering (Interior Wet/Dry), Renew

61 Hull, Forepeak, Repair xii (Rev-2)

PRINCIPAL CHARACTERISTICS

160' WLIC (B-CLASS), INLAND CONSTRUCTION TENDER

PHYSICAL

Length overall 160' 10"

Depth (main deck at side to baseline) 10' 0"

Maximum beam 30' 0"

Height of highest fixed projection 40’ 0” (above keel)

Height of highest projection with antenna mast extended

59’ 0” (above keel)

Frame spacing 1' 0"

Full load draft 4' 7-1/2” LCF Draft

Full load displacement 474.73 Long Tons (Fresh water)

Shore tie voltage requirements N/A

HULL

Hull material Steel

MACHINERY

Number of propellers 2

Number of blades per propeller 4

Diameter of propeller 48"

Pitch 44" fixed

RPM 475

Shaft diameter N/A

TANK CAPACITIES

Fuel tanks

Fresh water tanks

Lube oil

1 (Rev-2)

00000_0220_FLT

REC_00000_FLT_Commercial Project @ Contractor’ Facility (1212)

General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial contractor’s facility for Coast Guard vessels.

1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and

'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is

Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General

Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and

Allied Processes

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.

NOTE

The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

2 (Rev-2)

3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.

3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec

0000, in accomplishing the following task:

Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.

Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.

3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec

6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).

NOTE

Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes

(provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.

3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.

3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

3.5.1 Contractor operated (non USCG) facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at

Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:

Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.

National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an

NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.

Air Emission Permit: Unit has an Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.

3 (Rev-2)

3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.

3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The

Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility

Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System

(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste

Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the

Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;

ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the

Environmental Records binder and required documentation, including environmental permits compliance and close-out.

3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix A, Requirements For

Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.

3.6 Local Policy. None.

3.7 SFLC Standard Specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2018 Edition Standard Specifications and supersede published content:

None.

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

4 (Rev-2)

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

VESSEL NAME HULL # WORK

ITEM #

WORK ITEM TITLE

LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).

Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME

5 (Rev-2)

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

VESSEL NAME HULL #

WORK

Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.

DATE

TIME

ACTIVITY (SURFACE

PREPARATION, PRIMER

COAT, BARRIER COAT, TOP

COAT, ETC…)

LOCATION (FRAME &

DECK, RELATION TO

EQUIPMENT, ETC.)

TEMPERATURE % REL.

HUMID-

ITY

DEW

PT.

SURFAC

E

AMBIEN

T

ΔT

| DP -

SURFACE |

NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME

6 (Rev-2)

QA-3A - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

VESSEL NAME HULL # WORK

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area)

Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS

PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS

DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:

NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE /

TIME

7 (Rev-2)

QA-3B - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

VESSEL NAME HULL # WORK

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area)

Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT

QA RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO

SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Mean Reading

(mils)

Mean Reading (mils) IAW ASTM DD4417).

8 (Rev-2)

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

VESSEL NAME HULL # WORK

SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.

DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)

9 (Rev-2)

QA-5 - QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence)

VESSEL NAME HULL #

WORK

COATING MFG PRODUCT NAME

BATC

H #

INDUCTI

ON TIME

COATING SYSTEM

SEQUENCE

(PRIMER/TOUCHUP/3RD

COAT, ETC.)

DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.

SPOT 1 2 3 4 5

AVERAGE

VALUE

*BASE METAL READING

(BMR) Required, If Magnetic

Pull-Off (Type I/Banana) Gauge

Is Used.

LOCATION (FRAME REFERENCE):

SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS

1 AVG. BMR DEVIATION

3 BEFORE

ADJUSTMENTS

AFTER ADJUSTMENTS

AVG.

1 AVG. BMR DEVIATION

3 BEFORE

ADJUSTMENTS

1 AVG. BMR DEVIATION

3 BEFORE

ADJUSTMENTS

APPLICATION METHOD (AIRLESS,

CONVENTIONAL SPRAY, ROLLED)

AVERAGE DFT

10 (Rev-2)

11000_0320_FLT

REC_11000_UWHIB_FLT_160B WLIC (802 CGC KENNEBEC) (1211)

WORK ITEM 1: Hull Plating (U/W Body), Inspect

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to inspect/survey the vessel’s

Under Water (U/W) hull plating, including U/W appendages and coating system.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 160B WLIC 700-001, Rev B, Docking Plan (KENNEBEC)

Coast Guard Drawing 160B WLIC 1101-001, Rev C, Shell Plating Expansion and Longitudinal

Framing

Coast Guard Drawing 160B WLIC 1103-002, Rev A, Vertical Keel, Skeg, and Bottom Girders

Coast Guard Drawing 160B WLIC 1108-002, Rev B, Shaft Struts and Stern Tubes

Coast Guard Drawing 160B WLIC 2200-001, Rev A, Steering Machinery Arrangement, Rudder

Stock and Fittings

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements

OTHER REFERENCES

ASTM International (ASTM) D4138, 2013, Standard Practices for Measurement of Dry Film

Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means

The Society for Protective Coatings (SSPC), January 2015, Paint Application Specification No. 2

(PA-2), Procedure for Determining Conformance to Dry Coating Thickness Requirements

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

11 (Rev-2)

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).

3.2 Inspection. The Contractor shall accompany the Underwater Hull Inspection Board (UWHIB) in the performance of the below inspection tasks, as applicable, using the drawings listed in Section 2

(References) as guidance. The Contractor shall provide the following, to facilitate the UWHIB in assessing the condition of the designated U/W hull components and systems:

A hull repair supervisor and a marker.

Temporary staging and other necessary equipment, as applicable, for ensuring safe access to all areas of the U/W hull.

NOTES

1. The COR will convene the UWHIB as soon as possible after the vessel has been dry-docked and before any work (except U/W hull cleaning/wash down) is performed on the U/W hull and appendages.

2. Some of the components and/or systems addressed in this work item may not be applicable to all vessel classes.

3.2.1 Hull plating.

3.2.1.1 The Contractor shall inspect the condition of the hull plating (including thruster tunnel plating, as applicable), for the presence of marine growth, deformation, and any evidence of major corrosion or electrolytic action.

3.2.1.2 The Contractor shall inspect the hull and keel areas, report on the condition of butt-welded seams, doubler plates, lap seams, and for any signs of damaged plating or unusual waviness in the plating.

3.2.2 Sea chests and all other cooling system intake components. The Contractor shall inspect all sea chests, sea beam arrays, tunnels, hull openings, and grates for general appearance, loose, damaged, or missing grates, loose or missing fasteners, condition of sea strainers and lockwire on bolts, marine growth on grating slots, and any obstructions in the openings that might prevent proper suction and discharge of water.

3.2.3 Rudders. The Contractor shall check general condition, condition around the drain plugs, and check for pitting, if any, on the leading and trailing edges.

3.2.4 Propeller and shaft associated components. The Contractor shall inspect the condition of propellers

12 (Rev-2) for signs of corrosion, pitting, erosion, fouling, cracks, dings, and nicks by side and blade; inspect fairwaters, rope guards, shafts, and mechanical seals - look for missing screws, physical damage to the blades, pitting, condition of dunce caps, and condition of securing devices.

3.2.5 Transducers. The Contractor shall check general condition for cuts, cracks, corrosion, and surface defects around the openings. Check transducer securing nuts for tightness, and inspect cables for chafing and other damage.

3.2.6 Zinc anodes.

3.2.6.1 The Contractor shall remove all marine growth and oxide coating from all hull, rudder, shaft strut, sea chest, sea beam array, z-drive, and thruster tunnel zinc anodes, or water jet drives anodes, as applicable, using a light-wire brush.

3.2.6.2 The Contractor shall visually inspect all zinc anodes; check the soundness of mounting strap and stud welds, missing fasteners, and percentage of remaining material.

3.2.7 Coating system inspections. The Contractor shall accomplish the below inspections, in conjunction with the underwater hull inspection conducted by the Underwater Hull Inspection Board (UWHIB).

Document the condition found as “Partial - Condition A”, “Partial - Condition B”, “Partial Condition C”, or “100%”, as applicable (see 4.1 (Definitions)). Submit a CFR.

NOTE

The following inspections are for determining the existing condition of the coating system for the underwater body surfaces, which are deemed “Critical-coated” surfaces; they must be carried out by a SSPC-QP-1 certified contractor/sub-Contractor or a NACE Inspector – see SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces”).

3.2.7.1 Visual. Perform a visual inspection of the existing U/W body coating system.

3.2.7.2 Dry film thickness (DFT) measurements. Take total DFT measurements of the U/W body coating system, in accordance with SSPC-PA 2.

3.2.7.3 Coating system thickness and scheme inspection. Perform a microscopic observation of precision angular cuts in the coating system film (“Tooke Paint Inspection”), in accordance with ASTM D4138, and measure the total coating thickness and thickness of each individual coat of paint, in addition to identifying/verifying the existing color scheme for each coat of paint comprising the coating system.

NOTE

The Tooke Paint Inspection Gage/Gauge (Plastic) is a precision tool for inspection and thickness measurement (ASTM D4138) of single or multiple coats on any substrate, and for microscopic observation and measurement of substrate and film defects. The gage uses an illuminated 50-power microscope with measuring reticle, and mounts tungsten carbide cutting tips for precise incision of the work surface.

13 (Rev-2)

Direct measurement of total coating thickness and thickness of individual coats of paint is a unique capability of the Tooke Paint Inspection

Gage/Gauge. Thus, in addition to routine use, it often serves as a “referee” instrument to calibrate indirect or non-destructive thickness measuring instruments.

Other uses include assessment of substrate conditions and coating adhesion, and observation of microscopic cracking, tendency for brittleness, cratering, or other microscopic film symptoms.

3.2.7.3.1 Take a total of four readings in locations designated by the Coast Guard Inspector, and as follows: one each, port and starboard, in the boot-top area; and one each, port and starboard, below the boot-topping.

3.2.7.3.2 Ensure that the repair of all areas affected by the destructive Tooke Gauge inspection is included in the optional repair work item that is activated by the result of the inspection.

4. NOTES

4.1 Definitions.

4.1.1 "Partial – Condition A”: The condition that exists where the substrate is exposed in up to 33% of the entire U/W body.

4.1.2 "Partial - Condition B": The condition that exists where the anticorrosive (AC) undercoating system has incurred damage, but, the u/w body hull substrate is not exposed in any location.

4.1.3 "Partial - Condition C”: The condition that exists where damage is confined to the antifoulant (AF) topcoating; the epoxy undercoating system is not exposed in any location.

4.1.4 "100%”: The condition that exists where more than 33% of the U/W body hull substrate is exposed.

4.2 UWHIB convention. The COR will convene the UWHIB as soon as possible after the vessel has been dry-docked and before any work (except U/W hull cleaning/wash down) is performed on the U/W hull and appendages.

14 (Rev-2)

11010_UT_0320_FLT

REC_11010_UT_FLT_160’ WLIC ‘B’ Class (ALL) (0911)

WORK ITEM 2: Hull Plating (U/W Body), Ultrasonic Testing

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to conduct ultrasonic testing

(UT) of U/W hull plating.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 160B WLIC 700-001, Rev B, Docking Plan (KENNEBEC)

Coast Guard Drawing 160 WLIC 1101-001, Rev C, Shell Pltg Expansion & Framing

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and Allied Processes

OTHER REFERENCES

None.

3. REQUIREMENTS

3.1 General.

3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph:

3.2 (UT measurements).

Not applicable.

15 (Rev-2)

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).

3.2 UT measurements. The Contractor shall perform a total of 250 UT measurements of U/W hull surfaces, in locations designated by the Coast Guard Inspector, using Coast Guard Drawings 160B WLIC

700-001 and 160 WLIC 1101-001 for guidance, in accordance with SFLC Std Spec 0740, Appendix C.

Mark up a copy of Coast Guard Drawing 160 WLIC 1101-001 to show all locations selected for measurement and record all measurements in Table I (UT Measurements Summary Sheet - Port/Stbd

Shell) provided at the end of this item. Submit A CIR, to also include the marked up drawing and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .