ATTENTION TO OFFERORS
The U.S. COAST GUARD SHORE INFRASTRUCTURE LOGISTICS CENTER (SILC) invites you to submit a proposal, via the Acquisition of Commercial Items (FAR Part 12) to provide commercial Housing Maintenance Services FOR U.S. COAST GUARD TRACEN CAPE MAY, NJ.
This requirement is issued as a 100% Competitive 8(a) SET-ASIDE IN ACCORDANCE WITH FAR
SUBPART 19.8.
The North American Industry Classification System (NAICS) code that applies to this Request for Proposal (RFP) is 561210 (Facilities Support Services), with an applicable size standard of $35.5M.
The services are being solicited under Request for Proposal (RFP) Number
70Z08418RAA152000
Any Amendments will be posted on the Federal Business Opportunity Website at www.fbo.gov. It is the potential offer’s responsibility to monitor these avenues for release of any future amendments to the solicitation.
PLEASE SUBMIT YOUR SIGNED OFFER TO:
ORIGINAL TECHNICAL PROPOSAL VOLUME I ORIGINAL PLUS ONE
COPY OF PRICE PROPOSAL VOLUME II
Cynthia E. Floyd Contract
Specialist USCG SILC Base Services and Support 300 E. Main
Street, Suite 965 Norfolk, VA 23510-9109
TWO COPIES TECHNICAL PROPOSAL VOLUME I ONLY TO:
LT Troy Robison Commanding Officer
US Coast Guard Training Center 1 Munro Avenue, Cape May, NJ 08204 Facilities
Engineering Division
REMEMBER TO COMPLETE ALL PRICES, SUBMIT REQUIRED INFORMATION PER FAR PROVISION
52.212-1; COMPLETE REQUIRED CERTIFICATIONS PER FAR PROVISION 52.212-3; AND,
ACKNOWLEDGE ANY/ALL AMENDMENTS TO THE SOLICITATION.
PLEASE READ THE ENTIRE DOCUMENT (RFP) AND SUBMIT YOUR SIGNED
OFFER AS FOLLOWS:
http://www.fbo.gov/
IMPORTANT NOTICES
(1) The due date for proposal (s) (Volume I and Volume II in response to the RFP is scheduled for 29 August 2018, 2:00 PM, Eastern Time. All required proposal submissions must be submitted as directed in 52.212-1 Instruction to Offerors. Proposals submitted must be in compliance with all specifications and requirements as called out in the RFP. Failure to do so may result in the proposal being eliminated from further consideration for award.
(2) Prime Contractor/Subcontractor Arrangement and/or Contractor Team Arrangement (CTA)
Offerors shall identify any contractor teaming arrangement(s) or Prime Contractor/Subcontractor Arrangement(s) in their proposal. The offeror must clearly explain the portion of effort to be performed by each contractor. Prime Contractor/Subcontractor Arrangement and Contractor Team Arrangement (CTA) for this procurement shall be defined as described in the table below. If a contractor teaming arrangement is to be used, the offeror must provide a signed copy of the contractor teaming arrangement (CTA) with their proposal. The SBA 8(a) joint venture rules are found primarily at 13 C.F.R. § 124.513. Also see FAR Subpart 9.6 – Contractor Team Arrangements.
Contractor Team Arrangement (CTA) based on a Joint Venture
Prime Contractor/Subcontractor Arrangement
Each team member is combined into one entity considered to be the prime and at least one team member must be 8(a) certified.
Only the prime contractor must be 8(a) certified.
The combined team cannot exceed the size standard under the SBA’s affiliation rules. (see Exceptions below)
Only the prime must be within the size standard.
Each team member is responsible for duties addressed in the CTA document.
The prime contractor cannot delegate responsibility for performance to subcontractors.
Each team member has privity of contract with the government and can interact directly with the government.
Only the prime contractor has privity of contract with the government and can interact with the government.
The prime contractor is responsible for its subcontracting activities. (The use of subcontractors requires prior approval by the ordering activity.)
The ordering activity is invoiced at unit prices or hourly rates as agreed in the contract schedule.
The ordering activity is invoiced in accordance with the prime contractor's contract schedule, including any applicable price reductions.
Exceptions: Two limited exceptions to the general rule that members of a joint venture are presumed to be affiliated with each other for size determination purposes include: SBA Approved Mentor Protégé Joint ventures and 8(a) Joint Ventures. Under the Mentor Protégé Joint venture, the protégé must be a “socially and economically disadvantaged” small business concern that is 8(a) certified. Under the 8(a) Joint Venture, both contractor’s must be 8(a) certified.
(3) All contractor personnel working under this contract must be U.S. Citizens with no felony convictions.
(4) SITE VISIT: Site Visit at TRACEN Cape May, NJ will be conducted on 15 August 2018 at 0900 EST.
Attendance for the Site Visit is HIGHLY ENCOURAGED. All Questions shall be submitted in writing using the attached Question Worksheet NLT 3:00 PM Eastern Time 22 August 2018 to Cynthia Floyd at Cynthia.e.floyd@uscg.mil use in the subject line “ TRACEN Cape May, NJ Housing – Company Name”.
Questions will not be taken or answered during the site visit. All answers will be prepared by SILC and sent to all mailto:Cynthia.e.floyd@uscg.mil
Interested Vendors via email.
For security reasons and procedural expediency, each Vendor team may be represented by no more than three (3) members. In order to execute a background check, the offeror shall submit the name, date of birth, and the address of each individual attending the site visit to the Anti-Terrorism/Force Protection Officer, OSS4 Jeff Wilson, via e-mail at jeff.a.wilson@uscg.mil no later than 10:00 am Eastern Time 09 August 2018. The address submitted shall be that as it appears on the individual’s driver’s license. DO NOT PROVIDE SOCIAL SECURITY NUMBERS (SSN). In addition, if driving a vehicle on base, the driver must obtain a pass at the gate and be able to provide registration and proof of insurance.
During the TRACEN Cape May site visit, all smart phones or cell phones are permitted on base but must be turned off during the site visit. Cameras and photography will be allowed. Each visitor will be required to sign in and must stay with the site “tour” at all times. No other meetings for discussions with Government personnel shall be permitted. The Government reserves the right to inspect all material, briefcases, etc., entering or leaving Government facilities.
CONTRACTORS NOT COMPLYING WITH THESE RULES AND PROCEDURES MAY BE PRECLUDED FROM
FURTHER PARTICIPATION IN THIS SITE VISIT.
mailto:jeff.a.wilson@uscg.mil
NOTICE TO OFFERORS
This procurement solicitation is being processed under a Partnership Agreement (PA) between the U. S.
Department of Homeland Security (DHS) and the U. S. Small Business Administration (SBA), under which the SBA has delegated to the DHS, authority to enter into 8(a) contracts directly with eligible 8(a) firms. The PA implements a streamline procurement process for awards under the 8(a) program.
Under this agreement, the Coast Guard Shore Infrastructure Logistics Center East (COB-2) will make the award directly to the 8(a) firm. SBA will not be a signatory to the award resulting from this solicitation.
SBA will, however, retain responsibility for 8(a) certification, administering other eligibility related issues under the 8(a) program, and be available to 8(a) firms for counseling and assistance.
If you have any questions pertaining to this program, please contact:
Commandant (CG-9131) Procurement Management Division U.S. Coast Guard Headquarters 2100 2nd St SW Washington DC 20593-7112
(202) 475-3759
For competitive 8(a) only:
Servicing Small Business Administration Field Office
To facilitate communications, it is requested that the 8(a) participant submitting this offer/bid provide the following information regarding the cognizant servicing Small Business Administration (SBA) office for the firm.
Servicing SBA Office
Address
Cognizant Business Opportunity Specialist’s Name
Phone
NOTICE FOR FILING AGENCY PROTESTS
United States Coast Guard Ombudsman Program
It is the policy of the United States Coast Guard (USCG) to issue solicitations and make contract awards in a fair and timely manner. The Ombudsman Program for Agency Protests (OPAP) was established to investigate agency protest issues and resolve them without expensive and time- consuming litigation. OPAP is an independent reviewing authority that is empowered to grant a prevailing protester essentially the same relief as the Government
Accountability Office (GAO).
Interested parties are encouraged to seek resolution of their concerns within the USCG as an Alternative Dispute
Resolution (ADR) forum rather than filing a protest with the GAO or some external forum. Interested parties may seek resolution of their concerns informally or opt to file a formal agency protest with the Contracting Officer or
Ombudsman.
Informal Forum with the Ombudsman. Interested parties who believe a specific USCG procurement is unfair or otherwise defective should first direct their concerns to the applicable Contracting Officer. If the Contracting Officer is unable to satisfy their concerns, interested parties are encouraged to contact the U.S. Coast Guard Ombudsman for
Agency Protests. Under this informal process the agency is not required to suspend contract award performance. Use of an informal forum does not suspend any time requirement for filing a protest with the agency or other forum. In order to ensure a timely response, interested parties should provide the following information to the Ombudsman:
solicitation/contract number, contracting office, Contracting Officer, and solicitation closing date (if applicable).
Formal Agency Protest with the Ombudsman. Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the Contracting Officer through open and frank discussions. If the protester’s concerns are unresolved, an Independent Review is available by the Ombudsman. The protester may file a formal agency protest to either the Contracting Officer or as an alternative to that, the Ombudsman under the OPAP program.
Contract award or performance will be suspended during the protest period unless contract award or performance is justified, in writing, for urgent and compelling reasons or is determined in writing to be in the best interest of the
Government. The agency’s goal is to resolve protests in less than 35 calendar days from the date of filing. Protests shall include the information set forth in FAR 33.103(d) (2). If the protester fails to submit the required information, resolution of the protest may be delayed or the protest may be dismissed. To be timely protests must be filed within the period specified in FAR 33.103(e). Formal protests filed under the OPAP program should be submitted electronically to OPAP@uscg.mil and the Contracting Officer or by hand delivery to the Contracting Officer.
Election of Forum. After an interested party protests a Coast Guard procurement to the Contracting Officer or the
Ombudsman, and while the protest is pending, the protester agrees not to file a protest with the GAO or other external forum. If the protest is filed with an external forum, the agency protest will be dismissed.
The Ombudsman Hotline telephone number is 202.372.3695.
SF 1449
RFP 70Z08418RAA152000 Housing Maintenance Services at TRACEN Cape May, NJ Page 2 of 159
Continuation of SF1449 – Block 16/Contract Management
Notwithstanding the Contractor’s responsibility for total management during the performance of the contract, the administration of the contract will require maximum coordination between the Government and the contractor. The individuals listed below will be the Government points of contact during the performance period as follows:
The Base Services and Support Contracting Section (BSS), U.S. Coast Guard, Shore Infrastructure Logistics Center (SILC) will perform all administration under this contract. The location of the Primary Contracting Officer, Alternates(s) Contracting Officer, and Contract Specialist/Administrator for the contract is at 300 East Main Street, Suite 965, Norfolk, VA 23510-9113. Communication pertaining to contractual administrative matters shall be addressed to one of the Contracting Officers listed below. Changes in, or deviation from, the scope of work will not be effected without a written modification to the contract as executed by a SILC Contracting Officer.
PRIMARY:
Contracting Officer: Ms. Susan Kreider, Telephone No. 757-628-4140 Email: Susan.A.Kreider@uscg.mil
ALTERNATES:
Contracting Officer: Mr. Darryl Person, Telephone No. 757-628-4129 Email:
Darryl.Person@uscg.mil
The Contract Specialist/Administrator: Ms. Cynthia Floyd, Telephone No. 757-628-4107, serves as the point of contact between the Contractor and the Contractor Officer.
The Contracting Officer’s Representative (COR), Mr. Doug Quinley is a Government personnel designated in writing by the Contracting Officer to act as technical advisor for the Contracting Officer for items within the scope of the contract. The COR performs functions such as review and/or inspection and acceptance of supplies and services and of a technical nature. A designation letter will set forth the authorities and limitations of the COR under the contract.
mailto:Susan.A.Kreider@uscg.mil mailto:Darryl.Person@uscg.mil
RFP 70Z08418RAA152000 Housing Maintenance Services at TRACEN Cape May, NJ Page 3 of 159
Continuation of SF1449 - Block 18b/Invoice Procedures
Invoicing Instructions: Electronic submission of Invoices is mandatory
1. The Contractor shall submit invoices for services via Coast Guard Finance Center Website at:
http://www.fincen.uscg.mil/centralinv/central_inv_contr.cfm
2. The web submission requires the contractor to complete the Invoice Receipt Cover Form, select the Invoice Routing Code, and attach a PDF file of the invoice and any other supporting documentation.
3. A sample of the Invoice Receipt Cover Form is provided below. Mandatory information to be completed is highlighted in red on the website.
Invoice Routing Code:
SILC COB-2 (help) Invoice Receipt Date:
MM/DD/YY
(help)
Contract Number:
Requisition Number:
Delivery/Task Order Number:
(help) Invoice Number: (help)
MM/DD/YY
(help) Invoice Date: (help)
(help) Invoice Amount: (help)
Discount Terms: Discount Days
Net Days (help)
Contractor Information Attachment of Official Invoice
Contractor Name:
(help)
Submitter Name:
Submitter Email:
Submitter Phone:
4. The Contractor must select the correct Invoice Routing Code for timely invoice processing. The Invoice Routing Code for this contract is SILC BSS-2.
5. See the Coast Guard Finance Center Website link
(http://www.fincen.uscg.mil/centralinv/central_inv_contr.cfm) for instructions regarding invoice attachments.
6. A copy of the Invoice and Supporting documentation shall also be e-mailed to the Contracting
Office and COR at the addresses cited below:
cynthia.e.floyd@uscg.mil, Contract Specialist douglas.g.quinley@uscg.mil, COR
See FAR 52.212-4(g) Prompt Payment Act for what must be included in an invoice.
0.00
00.00 0 http://www.fincen.uscg.mil/centralinv/central_inv_contr.cfm http://www.fincen.uscg.mil/centralinv/central_inv_contr.cfm) mailto:cynthia.e.floyd@uscg.mil, mailto:douglas.g.quinley@uscg.mil mailto:douglas.g.quinley@uscg.mil
RFP 70Z08418RAA152000 Housing Maintenance Services at TRACEN Cape May, NJ Page 4 of 159
Continuation of SF-1449 Blocks 19-24: Schedule of Supplies/Services
CLIN SCHEDULE
Base Year (January 01, 2019-January December 31, 2019)
CLIN QTY UNIT
UNIT
PRICE TOTAL
Change of Occupancy Maintenance
(COM) 12 MO
0002 Service Call System 12 MO
0003 Self Help Store 12 MO
Annual Inspections & Preventative Maintenance 12 MO
TOTAL LEVEL I WORK (PREVENTATIVE MAINTENANCE)
LEVEL II A WORK (SERVICE WORK)
CLIN
EST
QTY UNIT
UNIT
PRICE TOTAL
General Repairs associated with Level II Service Call Work 12 MO
Self Help Store 100% and Level II Service Call Work Material >$35 1 LO NTE $ 125,000.00
Subcontractor and Rental Equipment Associated with Service Call Work 12 MO
TOTAL LEVEL II A WORK (SERVICE WORK)
LEVEL II B SERVICE WORK - ESTIMATED QUANTITY ITEMS (EQI)
EST
QTY UNIT UNIT PRICE TOTAL
0201 Exterior
0201AA
Roof sheathing repair/Shingle Repair
(>25 SF) 1,000 SF
0201AB
Replace roof ventilator structure screen
(ALL APPLICABLE PHASES) 2 EACH
0201AC
Repair Termite Damage (repair, treatment and replacement (>25 SF) 200 SF
0201AD Install water meter 10 EA
0201AE
Close in AC sleeve 2nd Floor Phase IV (Complete, framing, siding etc.) 10 EACH
0201AF Perform Exterior EFIS Repair (> 50 SF) 500 SF
0201AG
Install / replace dedicated satellite dish post (complete installation) 5 EACH
0201AH
Replace entire individual "in yard shed" (complete structure including door & all finishes) 1 EACH
0201AI
Replace "Good Neighbor" Fencing (> 25
LF) 50 LF
RFP 70Z08418RAA152000 Housing Maintenance Services at TRACEN Cape May, NJ Page 5 of 159
0201AJ
Gutter & downspout installation (complete all fitting) (> 30 LF) 100 LF
0201AK
Replacement of Vinyl siding (complete all components) (> 30 SF) 500 SF
0201AL
Repair / replace sidewalk panels (> 25
LF) 30 LF
0201AM
Install / replace frost free exterior hose bib 5 EACH
0202 Paint
0202AA
Perform interior painting IAW TE-1.9.1, Occupied unit NON COM tasking 3,000 SF
0202AB
Perform Exterior painting IAW TE-1.9.1, (>50 SF) LEVEL II, III or COM tasking 5,000 SF
0203 Floor
0203AA
Replace 3/4" plywood subflooring (> 50
SF) 1000 SF
0203AB
Replace 1/4" plywood/luan subflooring
(> 50 SF) 1000 SF
0203AC
Major Replacement (non ACM/PCM materials) of Vinyl Floor Tiles (> 10 SF) 5000 SF
0203AD
Replacement of vinyl resilient sheet flooring (non ACM/PCM materials) (> 0
SF) 7000 SF
0203AE
Installation of transition strips (various) between dissimilar floors 300 SF
0203AF
Installation of 3/4" wooden round stock at Vinyl floor perimeters 1000 LF
0203AG
Removal of existing carpet, carpet padding, tack strip etc. (> 50 SY) 5000 SY
0203AH
Installation of new carpet, carpet pad, tack strips 5000 SY
0203AI
Disposal of old wall base, carpet trimmings, floor installation scraps 10 CY
0203AJ
Procurement and installation of wooden cove base (shoe) molding (> 10
LF) 500 LF
0203AK
Installation of new carpet, carpet pad, tack strips – “Check Sisal Straw Carpet”
#842 2500 SY
0203AL
Installation of wooden style vinyl flooring “Fusion Hybrid Flooring” or approved product equal 2800 SY
0203AM
Replace Nonstandard Carpet in senior officer Quarters 150 SY
0203AN
Replace Nonstandard flooring in senior officer Quarters 150 SY
0204 Abatement
0204AA
Cleaning and abatement of mold (> 0
SF) 1000 SF
RFP 70Z08418RAA152000 Housing Maintenance Services at TRACEN Cape May, NJ Page 6 of 159
0204AB
ACM & PACM Abatement Part 1 - State, permit, & air Fees necessary for each job associated with ACM & PACM Removals/Abatement of VAT, Resilient sheet goods, mastics. This CLIN is ordered each time abatement is executed along with the ACM & PACM Abatement Part 2 CLIN which defines the quantity of actual materials to be removed. 5
Each
OCC
0204AC
ACM & PACM Abatement Part 2 - Per square foot removal and abetment of VAT, Resilient sheet goods, and associated mastics (> 0 SF). This CLIN is always ordered in conjunction with ACM & PACM Abatement Part 1 which covers the fixed overhead costs associated with abatement regardless of the quantity of materials being abated. 500 SF
0204AD
VAT Removals-Non Abatement, Level III, Recommended Best Work Practices 2000 SF
0205 Kitchen
0205AA
Replacement of Kitchen Countertops:
Phase I, II, & III three & four bedroom unit kitchen countertops NON MAGANITE type: Residential grade plywood 3/4 inch substrate with formed laminate top & backsplash, OG/double reveal or rounded edges as applicable (color: butterrum) 25 LF
0205AB
Replacement Phase IV, two bedroom unit kitchen countertops: Residential grade plywood 3/4 inch substrate with formed laminate top & backsplash, OG/double reveal or rounded edge as applicable (color: butterrum) 60 LF
0205AC
Replacement Phase I, three bedroom unit kitchen cabinets: Mid-Continent Oak model; Kentwood door style;
Chestnut color 100 LF
0205AD
Replacement Phase I, four bedroom unit kitchen base cabinets: Kitchen Kompact; Richwood lite oak, raised panel oak doors cabinet grade plywood cabinet construction & shelves 25 LF
0205AE
Replacement Phase II & III, three & four bedroom unit kitchen base cabinets:
Mid-Continent Oak Model, Kentwood Door Style; Chestnut color 60 LF
RFP 70Z08418RAA152000 Housing Maintenance Services at TRACEN Cape May, NJ Page 7 of 159
0205AF
Replacement Phase IV, two bedroom unit kitchen base cabinets: Mid- Continent Pro Series; Woodbury style;
solid oak or maple frames 30 LF
0205AG
Replacement Phase I, three bedroom unit kitchen wall cabinets: Mid- Continent Oak model; Kentwood door style; Chestnut color 100 LF
0205AH
Replacement Phase I, four bedroom unit kitchen wall cabinets: Kitchen Kompact Brand; Richwood lite oak model; raised panel oak doors; cabinet grade construction & shelves 30 LF
0205AI
Replacement Phase II & III, three & four bedroom unit kitchen wall cabinets:
Mid-Continent Oak Model, Kentwood Door Style; Chestnut color 30 LF
0205AJ
Replacement Phase IV, two bedroom unit kitchen wall cabinets: Mid- Continent Pro-Series; Woodbury style;
Solid oak or maple frames 30 LF
0205AK
Replacement Phase I, three bedroom unit kitchen pantry cabinets: Mid- Continent oak model; Kentwood door style; chestnut color 3 EACH
0205AL
Replacement Phase I, II & III, three & four bedroom unit kitchen pantry built in cabinet grade plywood shelves: 25 EACH
0205AM
Replacement of Kitchen stove/range hood (All Phases) 10 EACH
0205AN
Replacement of Kitchen stove/range electric 10 EACH
0205AO
Replacement Phase I, four bedroom unit; electric kitchen range: Maytag (model # MER7662WW) 12 inch power cook element 1 EACH
0205AP
Replacement of Kitchen stove/range gas 10 EACH
0205AQ
Replacement of Kitchen double bowl SS sink 10 EACH
0205AR Replacement of Kitchen faucet set 10 EACH
0205AS
Replacement of Kitchen stove/range backsplash unit 10 EACH
0205AT
Replacement of Refrigerator 18 cubic foot capacity 4 EACH
0205AU
Replacement of Refrigerator 20 cubic foot capacity 6 EACH
0205AV
Replacement of Refrigerator 22 cubic foot capacity 4 EACH
0205AW
Replacement Phase I, four bedroom unit; Refrigerator: Maytag EcoConserve with ice maker (model # M9BXX6MYW) 1 EACH
RFP 70Z08418RAA152000 Housing Maintenance Services at TRACEN Cape May, NJ Page 8 of 159
0205AX
Replacement of Dishwasher 18 cubic foot capacity 4 EACH
0205AY
Replacement of Dishwasher 24 cubic foot capacity 6 EACH
0205AZ
Replacement Phase I, four bedroom unit; dishwasher: Maytag JetClean Plus (model # M9B4709AWW) (White) 1 EACH
0205BA
Install / replace kitchen range hood 30" vented with light (rectangular or round) 5 EACH
0205BB
Replacement Phase I, four bedroom unit; Over Range Microwave: Maytag
1.6 cubic feet (model # MMV1164WW) 2 EACH
0205BC
Replacement Phase I, four bedroom unit; front load high-efficiency washing machine: Maytag (Model #
MHWE201YW) 1 EACH
0205BD
Replacement Phase I, four bedroom unit; front load high-efficiency electric clothes dryer: Maytag (model #
MEDE201YW) 1 EACH
0206 Electrical, Lighting & Fans
0206AA
Install / replace Kitchen 19" ceiling light fixtures 40 EACH
0206AB
Install / replace hallway and closet light fixtures 60 EACH
0206AC
Install / replace Dinning Room Light fixture 4 EACH
0206AD Install / replace stairwell light fixture 40 EACH
0206AE
Install /replace furnace room or laundry closet light fixture 20 EACH
0206AF
Install / replace exterior light fixtures Coach Type 25 EACH
0206AG
Install / replace exterior light fixtures "Jelly Jar" type 25 EACH
0206AH
Install /replace interior light fixture, Bathroom, Phase IV 10 EACH
0206AI
Install / replace interior light fixture, Bathroom, Phase I J. Officer type 5 EACH
0206AJ
Install / replace interior light fixture, Bathroom, Phase II & III 15 EACH
0206AK
Install / replace bathroom ceiling fan/light fixture heavy duty high CFM 25 EACH
0206AL
Install / replace bathroom ceiling fan no light 60-80 CFM 5 EACH
0206AM
Install / replace overhead light fixture Phase 4 shed 5 EACH
0206AN
Install ceiling fan/light where no light existed 10 EACH
0206AO
Install ceiling fan/light where ceiling light was present 10 EACH
0206AP
Install ceiling fan/light where a ceiling fan was present 20 EACH
RFP 70Z08418RAA152000 Housing Maintenance Services at TRACEN Cape May, NJ Page 9 of 159
0206AQ
Install / replace electrical distribution panel up to 200 AMP service, 16 circuits. 1 EACH
0206AR
Install non-switched electrical outlet where previously none existed 20 EACH
0206AS
Install / replace MACURCO combustible gas detector Phase II, III & IV 20 EACH
0206AT
Install / Replace Combination Combustible Gas Carbon Monoxide detector 40 EACH
0206AU
Install / Replace Carbon Monoxide detector 10 EACH
0206AV
Terminate & remove Whole House Fan, close up ceiling to match adjacent area 10 EACH
0207 Bathroom
0207AA
Install / replace bathroom vanity cabinet, Phase I (2 Unit Bldgs) 2 EACH
0207AB
Install / replace bathroom vanity cabinet Phase I three bedroom townhome (combination unit) 5 EACH
0207AC
Install / replace bathroom sink/vanity/top & faucet unit Phase II & III (combination unit) 5 EACH
0207AD
Install / replace bathroom vanity cabinet, Phase IV 2 bedroom type 5 EACH
0207AE
Install / replace bathroom sink vanity top Phase IV 2 bedroom style 5 EACH
0207AF
Install Phase I, II, & III, Sink Vanity:
Brand, Project Source, Oak Finish (model # PS2418P2-0) (24 inch by 18 5/8 inch) 5 EACH
0207AG
Install Phase I, II, & III, Sink Vanity:
Brand, Project Source; White finish (model # PS2418P2-WH) (24 inch by 18 5/8 inch) 5 EACH
0207AH
Install /replace bathroom sink faucet set Phase IV 2 bedroom type 5 EACH
0207AI
Install / replace bathroom Medicine cabinet Phase I recessed mounted 5 EACH
0207AJ
Install / replace bathroom Medicine cabinet Phase I surface mounted 5 EACH
0207AK
Install / replace bathroom Medicine cabinet Phase II & III recessed mounted 5 EACH
0207AL
Install / replace bathroom Medicine cabinet Phase IV recessed mounted 5 EACH
0207AM
Install / replace bathroom shower/tub enclosures 32" x 60" x 72" 1 EACH
0207AN
Install / replace bathroom shower/tub enclosures 30" x 58" x 60" 10 EACH
0207AO
Install / replace bathroom "Over the John" cabinet Phase I three bedroom T/home 10 EACH
RFP 70Z08418RAA152000 Housing Maintenance Services at TRACEN Cape May, NJ Page 10 of 159
0207AP
Install / replace bathroom "Over the John" cabinet Phase I (2 Unit Bldgs) 2 EACH
0207AQ
Install / replace bathroom "Over the John" cabinet Phase II & III type 10 EACH
0207AR
Install / replace bathroom "Over the John" cabinet Phase IV 2 bedroom type 5 EACH
0207AS
Install / replace bathroom half bath Pedestal sink floor mounted 5 EACH
0207AT
Install / replace bathroom, bathtub, cast iron construction, all Phases 1 EACH
0207AU
Install / replace bathroom water closet (toilet) all phases 5 EACH
0207AV
Install / replace bathroom sink, wall mounted, Phase IV half bath type 1 EACH
0207AW
Install / replace bathroom shower, mixing valves (completely) 10 EACH
0208 HVAC & Furnace
0208AA
Install / replace AC circulator condensing pump 4 EACH
0208AB Install / replace AC Condenser coil 2 EACH
0208AC Clean interior HVAC duct work (> 10 LF) 100 LF
0208AD
Install / replace AC condenser coil wooden platform/stand (all phases) 1 EACH
0208AE
Install / replace HVAC blower motors (All Phases) 2 EACH
0208AF Replace Thermostat with new 5 EACH
0208AG
Install / replace Gas Fired Furnace Phases II, III & IV 1 EACH
0208AH
Install / replace Gas Fired Furnace Phase I 1 EACH
0208AI Replace flue pipe rain cap 2 EACH
0208AJ
Replace gas fired hot water heater (match existing) 5 EACH
0208AK
Replace electric hot water (match existing) 2 EACH
0208AL Replace electric baseboard heat (< 2 LF) 2 EACH
0208AM
Replace electric baseboard heat each additional foot (> 2 LF) 5 EACH
0208AN Install AC Condensor Fan Motor 6 EACH
0209 Doors & Windows
0209AA
Replace storm door, (Complete all
HDWR) 10 EACH
0209AB
Replace Main Entry Door, Solid Wood, match existing types (Complete all
HDRW) 1 EACH
0209AC
Install / replace Interior Pre-hung Six panel composite doors 80 EACH
0209AD
Install / replace Interior Slab (non-pre-hung) Six panel composite doors 40 EACH
RFP 70Z08418RAA152000 Housing Maintenance Services at TRACEN Cape May, NJ Page 11 of 159
0209AE
Install / replace Interior Slab Flat Panel (non- pre-hung) wood constructed doors 2 EACH
0209AF
Install/solid wood fully louvered interior door (sm) 2 EACH
0209AG
Install/solid wood fully louvered interior door (lg) 40 EACH
0209AH
Install / replace Interior Bi-Fold Six Panel composite doors 100 EACH
0209AI
Replace Rear Entry Door, PHASE IV match existing 1 EACH
0209AJ
Replace French Doors (Complete all hardware & Trim 100% weather tight) 2 EACH
0209AH
Replace French Door Sliding Screen Doors (Complete all HDWR & Fittings) 10 EACH
0209AL Replace Sliding French Door Screens 5 EACH
0209AM
Replace shed door, fiberglass faced, heavy duty exterior grade w/HDWR 10 EACH
0209AN
Replace Main & Rear Entry Door Locksets ("BEST SYSTEM") 2 EACH
0209AO
Replace Shed door locksets ("BEST
SYSTEM") 2 EACH
0209AP
Replace Exterior Shed door Lockset
(COMMERCIAL TYPE) 10 EACH
0209AQ Replace interior door passage lockset 20 EACH
0209AR
Replace Exterior door HDWR, hinges, strike plates, etc. minus lockset 5 SET
0209AS
Replace Interior door HDWR, hinges, strike plates, etc. minus lockset 5 SET
0209AT
Replace main entry door chime and peep sight device (All Phases) 5 EACH
0209AU
Install replacement windows (insert type) 5 EACH
0209AV
Install replacement windows (new construction flanged type) 5 EACH
0209AW Replace window screens 40 EACH
0209AX
Install / replace 1" horizontal mini-blinds (all sizes) 200 EACH
0209AY
Install Government Supplied “Stanley Brand Sliding Patio Doors with all hardware 12 EACH
0209AZ
Install Contractor Supplied “Stanley Brand Sliding Patio Door” complete with all hardware 4 EACH
0209BA
Install Contractor Supplied “Stanley Brand Sliding Screen Patio Door” complete with all hardware 10 EACH
0210 Interior Misc...
RFP 70Z08418RAA152000 Housing Maintenance Services at TRACEN Cape May, NJ Page 12 of 159
0210AA
Install / replace gypsum board "mold resistant type" all thickness 200 SF
0210AB Replace gypsum board walls (> 32 SF) 200 SF
0210AC Replace gypsum board ceilings (> 32 SF) 200 SF
0210AD
Install ventilation duct exhaust connections Kitchen & Laundry type all phases 5 EACH
0210AE
Install / replace sanitary drain piping crawl space Phase IV (> 20 LF) 60 LF
0210AF
Install / replace gas piping crawl space
(> 25 LF) 60 LF
0210AG Install or replace inline water filters 5 EACH
0210AH
Install or replace water system expansion tanks 5 EACH
0210AI Replace oak stair tread 25 EACH
TOTAL LEVEL II B WORK - ESTIMATED QUANTITY ITEMS (EQI) $
TOTAL FIRM FIXED PRICE BASE YEAR $
**Variation in CLIN quantities is acceptable as long as the ceiling in not exceeded.
LEVEL III WORK (Additional Work issued via Task Order)
Additional Services in accordance with Attachment 1 1 LOT NTE $ 150,000.00
TOTAL BASE YEAR
Notes:
(1) Firm-Fixed Unit Prices shall include all costs to provide the services/supplies, which includes, but is not limited to, all applicable Federal, State, and local taxes and duties.
(2) Level II B Service Work – Estimated Quantity Items – CLINs 0201-0210AI will be fully funded each year and any variation in quantities for these CLINs is acceptable as long as the total ceiling is not exceeded. This is the IDIQ portion of the contract.
First Option Year (January 01, 2020-December 31, 2020)
CLIN QTY UNIT UNIT PRICE TOTAL
Change of Occupancy Maintenance
(COM) 12 MO
1002 Service Call System 12 MO
1003 Self Help Store 12 MO
Annual Inspections & Preventative
TOTAL LEVEL I WORK (PREVENTATIVE
MAINTENANCE) $
RFP 70Z08418RAA152000 Housing Maintenance Services at TRACEN Cape May, NJ Page 13 of 159
EST
QTY UNIT UNIT PRICE TOTAL
General Repairs associated with Level II Service Call Work 12 MO
Self Help Store 100% and Level II Service Call Work Material >$35 1 LO NTE $ 125,000.00
Subcontractor and Rental Equipment Associated with Service Call Work 12 MO
TOTAL LEVEL II A WORK (SERVICE
WORK) $
QTY UNIT UNIT PRICE TOTAL
1201 Exterior
1201AA
Roof sheathing repair/Shingle Repair
(>25 SF) 1,000 SF
1201AB
Replace roof ventilator structure screen (ALL APPLICABLE PHASES) 2 EACH
1201AC
Repair Termite Damage (repair, treatment and replacement (>25 SF) 200 SF
1201AD Install water meter 10 EA
1201AE
Close in AC sleeve 2nd Floor Phase IV (Complete, framing, siding etc.) 10 EACH
1201AF
Perform Exterior EFIS Repair (> 50
SF) 500 SF
1201AG
Install / replace dedicated satellite dish post (complete installation) 5 EACH
1201AH
Replace entire individual "in yard shed" (complete structure including door & all finishes) 1 EACH
1201AI
Replace "Good Neighbor" Fencing (>
25 LF) 50 LF
1201AJ
Gutter & downspout installation (complete all fitting) (> 30 LF) 100 LF
1201AK
Replacement of Vinyl siding (complete all components) (> 30 SF) 500 SF
1201AL
Repair / replace sidewalk panels (>
25 LF) 30 LF
1201AM
Install / replace frost free exterior hose bib 5 EACH
1202 Paint
1202AA
Perform interior painting IAW TE- 1.9.1, Occupied unit NON COM tasking 3,000 SF
1202AB
Perform Exterior painting IAW TE- 1.9.1, (>50 SF) LEVEL II, III or COM tasking 5,000 SF
1203 Floor
1203AA Replace 3/4" plywood subflooring (> 1000 SF
RFP 70Z08418RAA152000 Housing Maintenance Services at TRACEN Cape May, NJ Page 14 of 159
50 SF)
1203AB
Replace 1/4" plywood/luan subflooring (> 50 SF) 1000 SF
1203AC
Major Replacement (non ACM/PCM materials) of Vinyl Floor Tiles (> 10
SF) 5000 SF
1203AD
Replacement of vinyl resilient sheet flooring (non ACM/PCM materials)
(> 0 SF) 7000 SF
1203AE
Installation of transition strips (various) between dissimilar floors 300 SF
1203AF
Installation of 3/4" wooden round stock at Vinyl floor perimeters 1000 LF
1203AG
Removal of existing carpet, carpet padding, tack strip etc. (> 50 SY) 5000 SY
1203AH
Installation of new carpet, carpet pad, tack strips 5000 SY
1203AI
Disposal of old wall base, carpet trimmings, floor installation scraps 10 CY
1203AJ
Procurement and installation of wooden cove base (shoe) molding (>
10 LF) 500 LF
1203AK
Installation of new carpet, carpet pad, tack strips – “Check Sisal Straw Carpet”
#842 2500 SY
120AL
Installation of wooden style vinyl flooring “Fusion Hybrid Flooring” or approved product equal 2800 SY
1203AM
Replace Nonstandard Carpet in senior officer Quarters 150 SY
1203AN
Replace Nonstandard flooring in senior officer Quarters 150 SY
1204 Abatement
1204AA
Cleaning and abatement of mold (>
0 SF) 1000 SF
1204AB
ACM & PACM Abatement Part 1 - State, permit, & air Fees necessary for each job associated with ACM & PACM Removals/Abatement of VAT, Resilient sheet goods, mastics. This CLIN is ordered each time abatement is executed along with the ACM & PACM Abatement Part 2 CLIN which defines the quantity of actual materials to be removed. 5
Each
OCC
RFP 70Z08418RAA152000 Housing Maintenance Services at TRACEN Cape May, NJ Page 15 of 159
1204AC
ACM & PACM Abatement Part 2 - Per square foot removal and abetment of VAT, Resilient sheet goods, and associated mastics (> 0 SF). This CLIN is always ordered in conjunction with ACM & PACM Abatement Part 1 which covers the fixed overhead costs associated with abatement regardless of the quantity of materials being abated. 500 SF
1204AD
VAT Removals-Non Abatement, Level III, Recommended Best Work Practices 2000 SF
1205 Kitchen
1205AA
Replacement of Kitchen Countertops: Phase I, II, & III three & four bedroom unit kitchen countertops NON MAGANITE type:
Residential grade plywood 3/4 inch substrate with formed laminate top & backsplash, OG/double reveal or rounded edges as applicable (color:
butterrum) 25 LF
1205AB
Replacement Phase IV, two bedroom unit kitchen countertops:
Residential grade plywood 3/4 inch substrate with formed laminate top & backsplash, OG/double reveal or rounded edge as applicable (color:
butterrum) 60 LF
1205AC
Replacement Phase I, three bedroom unit kitchen cabinets: Mid- Continent Oak model; Kentwood door style; Chestnut color 100 LF
1205AD
Replacement Phase I, four bedroom unit kitchen base cabinets: Kitchen Kompact; Richwood lite oak, raised panel oak doors cabinet grade plywood cabinet construction & shelves 25 LF
1205AE
Replacement Phase II & III, three & four bedroom unit kitchen base cabinets: Mid-Continent Oak Model, Kentwood Door Style; Chestnut color 60 LF
RFP 70Z08418RAA152000 Housing Maintenance Services at TRACEN Cape May, NJ Page 16 of 159
1205AF
Replacement Phase IV, two bedroom unit kitchen base cabinets:
Mid-Continent Pro Series;
Woodbury style; solid oak or maple frames 30 LF
1205AG
Replacement Phase I, three bedroom unit kitchen wall cabinets:
Mid-Continent Oak model;
Kentwood door style; Chestnut color 100 LF
1205AH
Replacement Phase I, four bedroom unit kitchen wall cabinets: Kitchen Kompact Brand; Richwood lite oak model; raised panel oak doors;
cabinet grade construction & shelves 30 LF
1205AI
Replacement Phase II & III, three & four bedroom unit kitchen wall cabinets: Mid-Continent Oak Model, Kentwood Door Style; Chestnut color 30 LF
1205AJ
Replacement Phase IV, two bedroom unit kitchen wall cabinets: Mid- Continent Pro-Series; Woodbury style;
Solid oak or maple frames 30 LF
1205AK
Replacement Phase I, three bedroom unit kitchen pantry cabinets: Mid-Continent oak model;
Kentwood door style; chestnut color 3 EACH
1205AL
Replacement Phase I, II & III, three & four bedroom unit kitchen pantry built in cabinet grade plywood shelves: 25 EACH
1205AM
Replacement of Kitchen stove/range hood (All Phases) 10 EACH
1205AN
Replacement of Kitchen stove/range electric 10 EACH
1205AO
Replacement Phase I, four bedroom unit; electric kitchen range: Maytag (model # MER7662WW) 12 inch power cook element 1 EACH
1205AP
Replacement of Kitchen stove/range gas 10 EACH
1205AQ
Replacement of Kitchen double bowl SS sink 10 EACH
1205AR Replacement of Kitchen faucet set 10 EACH
1205AS
Replacement of Kitchen stove/range backsplash unit 10 EACH
1205AT
Replacement of Refrigerator 18 cubic foot capacity 4 EACH
1205AU
Replacement of Refrigerator 20 cubic foot capacity 6 EACH
1205AV Replacement of Refrigerator 22 4 EACH
RFP 70Z08418RAA152000 Housing Maintenance Services at TRACEN Cape May, NJ Page 17 of 159 cubic foot capacity
1205AW
Replacement Phase I, four bedroom unit; Refrigerator: Maytag EcoConserve with ice maker (model
# M9BXX6MYW) 1 EACH
1205AX
Replacement of Dishwasher 18 cubic foot capacity 4 EACH
1205AY
Replacement of Dishwasher 24 cubic foot capacity 6 EACH
1205AZ
Replacement Phase I, four bedroom unit; dishwasher: Maytag JetClean Plus (model # M9B4709AWW) (White) 1 EACH
1205BA
Install / replace kitchen range hood 30" vented with light (rectangular or round) 5 EACH
1205BB
Replacement Phase I, four bedroom unit; Over Range Microwave:
Maytag 1.6 cubic feet (model #
MMV1164WW) 2 EACH
1205BC
Replacement Phase I, four bedroom unit; front load high-efficiency washing machine: Maytag (Model #
MHWE201YW) 1 EACH
1205BD
Replacement Phase I, four bedroom unit; front load high-efficiency electric clothes dryer: Maytag (model # MEDE201YW) 1 EACH
1206 Electrical, Lighting & Fans
1206AA
Install / replace Kitchen 19" ceiling light fixtures 40 EACH
1206AB
Install / replace hallway and closet light fixtures 60 EACH
1206AC
Install / replace Dinning Room Light fixture 4 EACH
1206AD Install / replace stairwell light fixture 40 EACH
1206AE
Install /replace furnace room or laundry closet light fixture 20 EACH
1206AF
Install / replace exterior light fixtures Coach Type 25 EACH
1206AG
Install / replace exterior light fixtures "Jelly Jar" type 25 EACH
1206AH
Install /replace interior light fixture, Bathroom, Phase IV 10 EACH
1206AI
Install / replace interior light fixture, Bathroom, Phase I J. Officer type 5 EACH
1206AJ
Install / replace interior light fixture, Bathroom, Phase II & III 15 EACH
1206AK
Install / replace bathroom ceiling fan/light fixture heavy duty high 25 EACH
RFP 70Z08418RAA152000 Housing Maintenance Services at TRACEN Cape May, NJ Page 18 of 159
CFM
1206AL
Install / replace bathroom ceiling fan no light 60-80 CFM 5 EACH
1206AM
Install / replace overhead light fixture Phase 4 shed 5 EACH
1206AN
Install ceiling fan/light where no light existed 10 EACH
1206AO
Install ceiling fan/light where ceiling light was present 10 EACH
1206AP
Install ceiling fan/light where a ceiling fan was present 20 EACH
1206AQ
Install / replace electrical distribution panel up to 200 AMP service, 16 circuits. 1 EACH
1206AR
Install non-switched electrical outlet where previously none existed 20 EACH
1206AS
Install / replace MACURCO combustible gas detector Phase II, III & IV 20 EACH
1206AT
Install / Replace Combination Combustible Gas Carbon Monoxide detector 40 EACH
1206AU
Install / Replace Carbon Monoxide detector 10 EACH
1206AV
Terminate & remove Whole House Fan, close up ceiling to match adjacent area 10 EACH
1207 Bathroom
1207AA
Install / replace bathroom vanity cabinet, Phase I (2 Unit Bldgs) 2 EACH
1207AB
Install / replace bathroom vanity cabinet Phase I three bedroom townhome (combination unit) 5 EACH
1207AC
Install / replace bathroom sink/vanity/top & faucet unit Phase II & III (combination unit) 5 EACH
1207AD
Install / replace bathroom vanity cabinet, Phase IV 2 bedroom type 5 EACH
1207AE
Install / replace bathroom sink vanity top Phase IV 2 bedroom style 5 EACH
1207AF
Install Phase I, II, & III, Sink Vanity:
Brand, Project Source, Oak Finish (model # PS2418P2-0) (24 inch by 18 5/8 inch) 5 EACH
1207AG
Install Phase I, II, & III, Sink Vanity:
Brand, Project Source; White finish (model # PS2418P2-WH) (24 inch by 18 5/8 inch) 5 EACH
1207AH
Install /replace bathroom sink faucet set Phase IV 2 bedroom type 5 EACH
RFP 70Z08418RAA152000 Housing Maintenance Services at TRACEN Cape May, NJ Page 19 of 159
1207AI
Install / replace bathroom Medicine cabinet Phase I recessed mounted 5 EACH
1207AJ
Install / replace bathroom Medicine cabinet Phase I surface mounted 5 EACH
1207AK
Install / replace bathroom Medicine cabinet Phase II & III recessed mounted 5 EACH
1207AL
Install / replace bathroom Medicine cabinet Phase IV recessed mounted 5 EACH
1207AM
Install / replace bathroom shower/tub enclosures 32" x 60" x
72" 1 EACH
1207AN
Install / replace bathroom shower/tub enclosures 30" x 58" x
60" 10 EACH
1207AO
Install / replace bathroom "Over the John" cabinet Phase I three bedroom T/home 10 EACH
1207AP
Install / replace bathroom "Over the John" cabinet Phase I (2 Unit Bldgs) 2 EACH
1207AQ
Install / replace bathroom "Over the John" cabinet Phase II & III type 10 EACH
1207AR
Install / replace bathroom "Over the John" cabinet Phase IV 2 bedroom type 5 EACH
1207AS
Install / replace bathroom half bath Pedestal sink floor mounted 5 EACH
1207AT
Install / replace bathroom, bathtub, cast iron construction, all Phases 1 EACH
1207AU
Install / replace bathroom water closet (toilet) all phases 5 EACH
1207AV
Install / replace bathroom sink, wall mounted, Phase IV half bath type 1 EACH
1207AW
Install / replace bathroom shower, 1208 HVAC & Furnace
1208AA
condensing pump 4 EACH
1208AB Install / replace AC Condenser coil 2 EACH
1208AC
Clean interior HVAC duct work (> 10
LF) 100 LF
1208AD
Install / replace AC condenser coil wooden platform/stand (all phases) 1 EACH
1208AE
Install / replace HVAC blower motors (All Phases) 2 EACH
1208AF Replace Thermostat with new 5 EACH
1208AG
Install / replace Gas Fired Furnace Phases II, III & IV 1 EACH
1208AH Install / replace Gas Fired Furnace 1 EACH
RFP 70Z08418RAA152000 Housing Maintenance Services at TRACEN Cape May, NJ Page 20 of 159
Phase I
1208AI Replace flue pipe rain cap 2 EACH
1208AJ
Replace gas fired hot water heater (match existing) 5 EACH
1208AK
Replace electric hot water (match existing) 2 EACH
1208AL
Replace electric baseboard heat (< 2
LF) 2 EACH
1208AM
Replace electric baseboard heat each additional foot (> 2 LF) 5 EACH
1208AN Install AC Condensor Fan Motor 6 EACH
1209 Doors & Windows
1209AA
HDWR) 10 EACH
1209AB
Replace Main Entry Door, Solid Wood, match existing types (Complete all HDRW) 1 EACH
1209AC
Install / replace Interior Pre-hung Six panel composite doors 80 EACH
1209AD
Install / replace Interior Slab (non-pre-hung) Six panel composite doors 40 EACH
1209AE
Install / replace Interior Slab Flat Panel (non- pre-hung) wood constructed doors 2 EACH
1209AF
Install/solid wood fully louvered interior door (sm) 2 EACH
1209AG
Install/solid wood fully louvered interior door (lg) 40 EACH
1209AH
Install / replace Interior Bi-Fold Six Panel composite doors 100 EACH
1209AI
Replace Rear Entry Door, PHASE IV match existing 1 EACH
1209AJ
Replace French Doors (Complete all hardware & Trim 100% weather tight) 2 EACH
1209AK
Replace French Door Sliding Screen Doors (Complete all HDWR & Fittings) 10 EACH
1209AL Replace Sliding French Door Screens 5 EACH
1209AM
Replace shed door, fiberglass faced, heavy duty exterior grade w/HDWR 10 EACH
1209AN
Replace Main & Rear Entry Door Locksets ("BEST SYSTEM") 2 EACH
1209AO
Replace Shed door locksets ("BEST
SYSTEM") 2 EACH
1209AP
Replace Exterior Shed door Lockset
(COMMERCIAL TYPE) 10 EACH
1209AQ
Replace interior door passage lockset 20 EACH
RFP 70Z08418RAA152000 Housing Maintenance Services at TRACEN Cape May, NJ Page 21 of 159
1209AR
Replace Exterior door HDWR, hinges, strike plates, etc. minus lockset 5 SET
1209AS
Replace Interior door HDWR, hinges, strike plates, etc. minus lockset 5 SET
1209AT
Replace main entry door chime and peep sight device (All Phases) 5 EACH
1209AU
Install replacement windows (insert type) 5 EACH
1209AV
Install replacement windows (new construction flanged type) 5 EACH
1209AW Replace window screens 40 EACH
1209AX
Install / replace 1" horizontal mini-blinds (all sizes) 200 EACH
1209AY
Install Government Supplied “Stanley Brand Sliding Patio Doors with all hardware 12 EACH
1209AZ
Install Contractor Supplied “Stanley Brand Sliding Patio Door” complete with all hardware 4 EACH
1209BA
Install Contractor Supplied “Stanley Brand Sliding Screen Patio Door” complete with all hardware 10 EACH
1210 Interior Misc...
1210AA
Install / replace gypsum board "mold resistant type" all thickness 200 SF
1210AB
Replace gypsum board walls (> 32
SF) 200 SF
1210AC
Replace gypsum board ceilings (> 32
SF) 200 SF
1210AD
Install ventilation duct exhaust connections Kitchen & Laundry type all phases 5 EACH
1210AE
Install / replace sanitary drain piping crawl space Phase IV (> 20 LF) 60 LF
1210AF
Install / replace gas piping crawl space (> 25 LF) 60 LF
1210AG Install or replace inline water filters 5 EACH
1210AH
Install or replace water system expansion tanks 5 EACH
1210AI Replace oak stair tread 25 EACH
TOTAL FIRM FIXED PRICE FIRST OPTION YEAR $
LEVEL III WORK (Additional Work issued via task order)
RFP 70Z08418RAA152000 Housing Maintenance Services at TRACEN Cape May, NJ Page 22 of 159
Additional Services in accordance with Attachment 1 1 LOT NTE $ 150,000.00
TOTAL FIRST OPTION YEAR
(1) Firm-Fixed Unit Prices shall include all costs to provide the services/supplies, which includes, but is not limited to, all applicable Federal, State, and local taxes and duties.
(2) Level II B Service Work – Estimated Quantity Items – CLINs 1201-1210AI will be fully funded each year and any variation in quantities for these CLINs is acceptable as long as the total ceiling is not exceeded.
Second Option Year (January 01, 2021-December 31, 2021)
PRICE TOTAL
Change of Occupancy Maintenance
(COM) 12 MO
2002 Service Call System 12 MO
2003 Self Help Store 12 MO
Annual Inspections & Preventative
TOTAL LEVEL I WORK (PREVENTATIVE
MAINTENANCE) $
EST
QTY UNIT
UNIT
PRICE TOTAL
General Repairs associated with Level II Service Call Work 12 MO
Self Help Store 100% and Level II Service Call Work Material >$35 1 LO NTE $ 125,000.00
Subcontractor and Rental Equipment Associated with Service Call Work 12 MO
TOTAL LEVEL II A WORK (SERVICE WORK) $
QTY UNIT
UNIT
PRICE TOTAL
2201 Exterior
2201AA
Roof sheathing repair/Shingle Repair
(>25 SF) 1,000 SF
2201AB
Replace roof ventilator structure screen (ALL APPLICABLE PHASES) 2 EACH
RFP 70Z08418RAA152000 Housing Maintenance Services at TRACEN Cape May, NJ Page 23 of 159
2201AC
Repair Termite Damage (repair, treatment and replacement (>25 SF) 200 SF
2201AD Install water meter 10 EA
2201AE
Close in AC sleeve 2nd Floor Phase IV (Complete, framing, siding etc.) 10 EACH
2201AF
Perform Exterior EFIS Repair (> 50
SF) 500 SF
2201AG
Install / replace dedicated satellite dish post (complete installation) 5 EACH
2201AH
Replace entire individual "in yard shed" (complete structure including door & all finishes) 1 EACH
2201AI
Replace "Good Neighbor" Fencing (>
25 LF) 50 LF
2201AJ
Gutter & downspout installation (complete all fitting) (> 30 LF) 100 LF
2201AK
Replacement of Vinyl siding (complete all components) (> 30 SF) 500 SF
2201AL
Repair / replace sidewalk panels (>
25 LF) 30 LF
2201AM
Install / replace frost free exterior hose bib 5 EACH
2202 Paint
2202AA
Perform interior painting IAW TE- 1.9.1, Occupied unit NON COM tasking 3,000 SF
2202AB
Perform Exterior painting IAW TE-1.9.1, (>50 SF) LEVEL II, III or COM tasking 5,000 SF
2203 Floor
2203AA
Replace 3/4" plywood subflooring (>
50 SF) 1000 SF
2203AB
Replace 1/4" plywood/luan subflooring (> 50 SF) 1000 SF
2203AC
Major Replacement (non ACM/PCM materials) of Vinyl Floor Tiles (> 10
SF) 5000 SF
2203AD
Replacement of vinyl resilient sheet flooring (non ACM/PCM materials)
(> 0 SF) 7000 SF
2203AE
Installation of transition strips (various) between dissimilar floors 300 SF
2203AF
Installation of 3/4" wooden round stock at Vinyl floor perimeters 1000 LF
2203AG
Removal of existing carpet, carpet padding, tack strip etc. (> 50 SY) 5000 SY
2203AH
Installation of new carpet, carpet pad, tack strips 5000 SY
2203AI
Disposal of old wall base, carpet trimmings, floor installation scraps 10 CY
RFP 70Z08418RAA152000 Housing Maintenance Services at TRACEN Cape May, NJ Page 24 of 159
2203AJ
Procurement and installation of wooden cove base (shoe) molding (>
10 LF) 500 LF
2203AK
Installation of new carpet, carpet pad, tack strips – “Check Sisal Straw Carpet”
#842 2500 SY
2203AL
Installation of wooden style vinyl flooring “Fusion Hybrid Flooring” or approved product equal 2800 SY
2203AM
Replace Nonstandard Carpet in senior officer Quarters 150 SY
2203AN
Replace Nonstandard flooring in senior officer Quarters 150 SY
2204 Abatement
2204AA
Cleaning and abatement of mold (>
0 SF) 1000 SF
2204AB
ACM & PACM Abatement Part 1 - State, permit, & air Fees necessary for each job associated with ACM & PACM Removals/Abatement of VAT, Resilient sheet goods, mastics. This CLIN is ordered each time abatement is executed along with the ACM & PACM Abatement Part 2 CLIN which defines the quantity of actual materials to be removed. 5
Each
OCC
2204AC
ACM & PACM Abatement Part 2 - Per square foot removal and abetment of VAT,…