This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued by the USCG for solicitation 70Z08026QMECP0033, effective September 22, 2026. The amendment extends the solicitation due date from September 25, 2026 at 12:00 PM EST to September 30, 2026 at 12:00 PM EST.

The amendment addresses three vendor questions regarding work items related to vessel maintenance and repair. Question 1 concerns Work Item 35 regarding removal and disposal of rubber bilge lining and clarifies that lead ingots exist below the machinery per Drawing 627-WMEC-191-001. Question 2 addresses Work Item 37 regarding lead ingots as interference to hull plate replacement and provides specifications for the lead ballast: Lead Brick conforming to QQ-L-171e grade B, size 3X3X14, approximately 50 pounds each, coated in 3M Scotchkote 135 or Sherwin Williams EAS8-30034 Epoxy Powder Coating (4 mil thickness, grey color). Question 3 clarifies that all lead ingots referenced in Work Items 38 and other items are coated and conform to the same specifications, eliminating concern about differential personal protection requirements. Vendors must acknowledge receipt of this amendment prior to the extended deadline of September 30, 2026 at 12:00 PM EST by completing items 8 and 15 or by separate written communication referencing the solicitation and amendment numbers.

View the file

Other files

File Type Posted
Schedule of Prices for Rev1 Spec.xlsx XLSX spreadsheet
Specification Rev 1 29 Sept 2026.pdf PDF
70Z08026QMECP0033_0004.pdf PDF
Schedule of Prices Revised.xls XLS spreadsheet
70Z08026QMECP0033_0002.pdf PDF
70Z08026QMECP0033_0001.pdf PDF
STATEMENT OF WORK.pdf PDF
Specification Rev 0 8 July 2026.pdf PDF
Schedule of Prices.xlsx XLSX spreadsheet
70Z08026QMECP0033_Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

9/22/2026

70Z08026QMECP00330003

Summary of Changes The purpose of this Amendment is to answer vendors questions:

Question 1: Work Item 35, paragraph 3.1.4.1 directs the contractor to remove and properly dispose of rubber bilge lining.

The item does not list lead ingots as an interference. Are there lead ingots in the bilge below the machinery? Is the rubber to be reinstalled? If so, please provide the requirement of size, thickness and Durometer.

USCG Response: There is lead ingots below the the machinery. See Drawing 627-WMEC-191-001.

Question 2: Work Item 37, paragraph 3.1.4 lists lead ingots as an interference to hull plate replacement. The government has not provided a reference that identifies the number, size, weight or location of any lead ingot installed onboard the vessel. Please provide this information.

USCG Response: Drawing 627-WMEC-191-001 to be provided with lead ballast information. All ingots should have the following specifications. "Lead Brick conforming to QQ-L-171e grade B, size 3X3X14, approximately 50 lb each, Coated in 3M Scotchkote 135 or Sherwin Williams EAS8-30034, Epoxy Powder Coating, (4 Mil) Thickness, Color (grey)"

Question 3: Work Item 38, paragraph 3.1.4 lists "Coated Lead ingots" as an interference to structural replacements. Are the ingots' listed in other items uncoated, which would require an increased level of personal protection to be removed?

USCG Response: All lead ingots are the same and should conform to the specifications above.

Solicitation due date is extended until 30 September 2026 12:00pm EST.

Header Information

Close Date is changed from 25-SEP-26 12:00:00 to 30-SEP-26 12:00:00.

Text52:
Text54: 1
TOTAL_NO_OF_PAGES: 2
CUST_PROJ_CODE:
DOCUMENT_NUMBER: 70Z08026QMECP00330003
EFFECTIVE_DATE: 2026-09-22T12:45:27.000-04:00
REF_PR_NUM_T: 52000PR260026713
SOL_DOCUMENT_NUMBER: 70Z08026QMECP0033
SOL_OPEN_BID_DATE: 2026-09-03T09:59:35.000-04:00
NO_OF_COPIES: 1
Check Box91: Yes
Check Box92: Off
MANUAL_EXTEND_FLAG: Y
Check Box95: Yes
Check Box96: Off
Check Box97: Off
Check Box98: Off
Check Box99: Off
Check Box100: Off
Check Box101: Off
Text1: AMENDMENT CONTROL NUMBER :
HDR_DOCUMENT_NUMBER: 70Z08026QMECP0033
Text134: SUMMARY OF CHANGES :
AMENDMENT_DESCRIPTION: AMEND-See Schedule
Text2: Same As Issuing Office
AMD_ISSUING_OFFICE_LADDR:
AMD_ISSUING_OFFICE_LOCCODE:
2026-09-22T12:58:22-0400
GAVALIAN.ALISSA.GRETA.1299855070

File details come from the government source that posted it. Updated .