70Z08026QMECP0033_0002.pdf

PDF 722 KB Posted

Attached to
CGC VIGOROUS DD &DS FY27
Solicitation number
70Z08026QMECP0033
Issued by

About this file

This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued by the Coast Guard on September 3, 2026. The amendment number is 70Z08026QMECP00330002, referencing solicitation 70Z08026QMECP0033 dated September 3, 2026. The requisition number is 52000PR260026713. The amendment is not extended, maintaining the original receipt date for offers.

The amendment addresses a vendor question regarding Work Item 032, Paragraph 3.4, which pertains to pre-award stability calculations for multiple definite and option work items (034, 036, 048, 049, 051, 052, and 055) involving tank content removal and floating drydock operations. The vendor requested that the Coast Guard waive the Full Load Condition calculation requirements, proposing instead to remove tank contents pier side prior to docking and submit actual stability calculations beforehand. The Coast Guard declined the waiver request, confirming that Work Item 032, Paragraph 3.4 requirements must be maintained for pre-award calculations in accordance with Appendix A of SFLC STD SPEC 8634 and the Technical Capability Submission. The Coast Guard will provide updated loading conditions after contract award as required by SFLC STD SPEC 8634, Paragraph 3.5.2.1.1. The contracting officer is Alissa Gavallian.

View the file

Other files

File Type Posted
Schedule of Prices for Rev1 Spec.xlsx XLSX spreadsheet
Specification Rev 1 29 Sept 2026.pdf PDF
70Z08026QMECP0033_0004.pdf PDF
Schedule of Prices Revised.xls XLS spreadsheet
70Z08026QMECP0033_0003.pdf PDF
70Z08026QMECP0033_0001.pdf PDF
STATEMENT OF WORK.pdf PDF
Specification Rev 0 8 July 2026.pdf PDF
Schedule of Prices.xlsx XLSX spreadsheet
70Z08026QMECP0033_Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

XX 1

Alissa Gavalian

70Z08026QMECP00330002

Summary of Changes The purpose of this amendment is to answer vendor's question:

Question: Work Item 032 Para 3.4: As the scope of work detailed in Definite Work Items 034, 036, 048, and 049, as well as Option Work Items 051, 052, and 055 will require removal of tank contents, requesting the Coast Guard strike the requirements of Work Item 032, Para 3.4, to provide pre-award calculation using Full Load Condition values. The safest method, especially when utilizing a floating drydock, is to remove contents of the impacted tanks pier side, prior to docking of the Cutter, with actual stability calculations obtained and submitted prior to docking.

Answer: The CG will not waive the requirements of Work Item 032, Para 3.4. These conditions are to be used to perform Pre-Award calculations in accordance with Appendix A of SFLC STD SPEC 8634 and to satisfy the requirements of the Technical Capability Submission. CG will provide updated loading conditions after award and as required by SFLC STD SPEC 8634, Para 3.5.2.1.1.

Text52:
Text54: 1
TOTAL_NO_OF_PAGES: 2
CUST_PROJ_CODE:
DOCUMENT_NUMBER: 70Z08026QMECP00330002
EFFECTIVE_DATE: 2026-09-03T09:59:11.000-04:00
REF_PR_NUM_T: 52000PR260026713
SOL_DOCUMENT_NUMBER: 70Z08026QMECP0033
SOL_OPEN_BID_DATE: 2026-09-03T09:52:52.000-04:00
NO_OF_COPIES: 1
Check Box91: Yes
Check Box92: Off
MANUAL_EXTEND_FLAG: N
Check Box95: Yes
Check Box96: Off
Check Box97: Off
Check Box98: Off
Check Box99: Off
Check Box100: Off
Check Box101: Off
Text1: AMENDMENT CONTROL NUMBER :
HDR_DOCUMENT_NUMBER: 70Z08026QMECP0033
Text134: SUMMARY OF CHANGES :
AMENDMENT_DESCRIPTION: AMEND-See Schedule
Text2: Same As Issuing Office
AMD_ISSUING_OFFICE_LADDR:
AMD_ISSUING_OFFICE_LOCCODE:
2026-09-03T10:07:08-0400
GAVALIAN.ALISSA.GRETA.1299855070

File details come from the government source that posted it. Updated .