Attachment 1- Schedule of Services_Updated.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
Dock-Side (DS): USCGC HARRIET LANE DS FY26
Solicitation number
70Z08026QMECP0017
Issued by

About this file

This is a Schedule of Services pricing template for dockside maintenance and repair work on the USCGC Harriet Lane (WMEC-270A) during FY2026 availability at Joint Base Pearl Harbor Hickam, Hawaii, with a period of performance from August 13, 2026 through October 7, 2026. The schedule encompasses 33 definite line items and 9 optional line items covering tank cleaning and inspection (aviation fuel, MP fuel, potable water, ballast, and dirty oil), propulsion system maintenance (shaft alignment, circuit breakers, vent duct cleaning), deck equipment servicing (anchor chains, towing bitts, capstan overhaul), and structural replacements (hull plating, piping insulation, shaft seals, watertight hatches, deck covering). Additional definite items include anchor windlass replacement, fantail embarkation station modification, flow meter replacement, engine room fan controller renewal, and laydays charged at a daily rate. Nine optional preservation and overhaul line items are included for tanks, chain lockers, and anchor windlass work.

The pricing structure requires contractors to submit unit prices for each job item, with extended prices calculated by quantity. The template includes a separate Over and Above/Growth Work section establishing fixed labor rates (estimated at $1,362 per hour for 1,362 hours) and material markup/handling fee structure (estimated at $52,544.00) to be applied if additional work is authorized via contract modification throughout the contract lifecycle. All price fields are currently showing $0.00, indicating this is a blank template awaiting contractor pricing submissions. Travel and per diem costs are included as a separate line item. The total evaluated price calculation combines definite and optional items plus over and above/growth work pricing.

View the file

Other files

File Type Posted
70Z08026QMECP00170003.pdf PDF
70Z08026QMECP00170003.pdf PDF
70Z08026QMECP00170002.pdf PDF
Amendment 0001.pdf PDF
70Z08026QMECP0017.pdf PDF
Attachment 1- Schedule of Services.xlsx XLSX spreadsheet
Attachment 2- Specification.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC HARRIET LANE (WMEC-270A) DOCKSIDE AVAILABILITY FY2026
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Tanks, Aviation Fuel Service, Clean And InspectJOB
D-002Chain Lockers, Clean and InspectJOB
D-003Tanks, MP Fuel Stowage and Overflow, Clean and InspectJOB
D-004Tanks, MP Fuel Service, Clean and InspectJOB
D-005Tanks, Potable Water, Clean and InspectJOB
D-006Tanks, Ballast, Clean and InspectJOB
D-007Tanks, Dirty Oil and Waste, Clean and InspectJOB
D-008Propulsion Shafting, Strain Gauge Alignment, Dockside, CheckJOB
D-009Circuit Breakers (400 HZ), Inspect and TestJOB
D-010Vent Ducts, Engine Room, Commercial CleaningJOB
D-011Vent Ducts, Galley, Commercial CleaningJOB
D-012Vent Ducts, Laundry Exhaust, Commercial CleaningJOB
D-013Commissary Hoist, Inspect and ServiceJOB
D-014Anchor Chains and Ground Tackle, Inspect and RepairJOB
D-015Towing Bitts, Chocks, and Fairleads; Inspect and TestJOB
D-016Warping Capstan, OverhaulJOB
O-017Tanks, Aviation Fuel Service, Preserve, Partial (OPTIONAL)JOB
O-018Tanks, Ballast, Preserve, Partial (OPTIONAL)JOB
O-019Chain Lockers, Preserve, Partial (OPTIONAL)JOB
O-020Tanks, MP Fuel Service, Preserve, Partial (OPTIONAL)JOB
O-021Tanks, MP Fuel Storage and Overflow, Preserve, Partial (OPTIONAL)JOB
O-022Tanks, Potable Water, Preserve, Partial (OPTIONAL)JOB
D-023Anchor Windlass, ReplaceJOB
D-024Fantail Embarkation Station & Stanchions, ModifyJOB
D-025Flow Meter (Aviation Fuel), ReplaceJOB
D-026Engine Room Fan Controllers, RenewJOB
D-027Hull and Structural Plating, Steel Plate, RenewJOB
D-028Chill Water Piping Insulation, RenewJOB
D-029Shaft Seal Components, RenewJOB
D-030Watertight Hatch, External, RenewJOB
D-031Deck Covering System, RenewJOB
O-032Tanks, Dirty Oil and Waste, Preserve, Partial (OPTIONAL)JOB
O-033Anchor Windlass, Overhaul (OPTIONAL)JOB
D-00ATravel and PerdiemJOB
O-00ZLaydaysDay5ERROR:#REF!
Total Price of Definite and Optional Items$0.00
Over and Above/Growth Work
The Labor Rates and Material Markup/Handling Fee will used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The values shown are an estimate only and may be exceeded at the unit prices offered. The total extended price for both CLINs below are being used solely for the purposes of evaluating price.
**Fill in the sections highlighted below:
OA/G-001Over and Above/Growth Labor RateHour1362$0.00
OA/G-002Over and Above/Growth Material Markup/Handling Fee$52,544.00Percent$0.00
Total Evaluated Price of Over and Above/Growth$0.00

TOTAL EVALUATED PRICE $0.00

(11/10/2025)_x000D_ Draft-0 - Page &P of &N

File details come from the government source that posted it. Updated .