This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) for the Harriet Lane Dockside Repairs FY26 project. The amendment number is 70Z08026QMECP0017003, effective March 17, 2026, and was issued by the Coast Guard. The solicitation amendment number is 70Z08026QMECP0017, dated March 13, 2026, and the offer receipt deadline is not extended. The closing date for this solicitation remains March 23, 2026 at 2:00pm EST. Offerors must acknowledge receipt of this amendment by completing items 8 and 15 and returning copies, by acknowledging receipt on each copy of the offer submitted, or by separate letter or electronic communication referencing the solicitation and amendment numbers.

The amendment addresses a vendor-submitted question regarding Work Item 003, which involves providing support to refuel the vessel. The vendor inquired whether the Coast Guard assumes fuel costs as a contractor expense and requested clarification on the quantity and types of fuel required. The government response clarifies that the contractor is responsible for performing tank inspections in sequential order, which will involve fuel transfers between tanks after each inspection round is complete. The only offload requirement is 2,000 gallons of diesel below the low suction point. The contractor is not responsible for ordering fuel; the cutter will arrange fuel orders independently once all Work Item inspections are complete. All other terms and conditions of the referenced solicitation remain unchanged and in full force and effect.

View the file

Other files

File Type Posted
70Z08026QMECP00170003.pdf PDF
70Z08026QMECP00170002.pdf PDF
Attachment 1- Schedule of Services_Updated.xlsx XLSX spreadsheet
Amendment 0001.pdf PDF
70Z08026QMECP0017.pdf PDF
Attachment 1- Schedule of Services.xlsx XLSX spreadsheet
Attachment 2- Specification.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Kaity George

03/17/2026

70Z08026QMECP0017

HARRIET LANE DOCKSIDE REPAIRS FY26

AMENDMENT 0003

Response to Questions/Requests for Clarification:

1. Work Item 003: Paragraphs States, "provide support to refuel vessel." No quantity of fuel for refueling effort is listed. Does USCG assume cost of fuel to be a contractors expense? If so, what quantity and types does the government require under para. 3.1.4.4?

One of the CG Publication references (also WI 3 para. 3.1.4.1.) is “Coast Guard Technical Specification D-123-2048, Feb 2020, 270’ WMEC A Class Fluid Handling Plan for Tank Inspections.” Our intent with the WI is for the contractor to perform tank inspections in “Round” (sequential) order, which will involve fuel transfers between tanks after each round is complete. The only portion of WI 3 requiring offload is the diesel below the low suction point (i.e., 2,000 gallons as noted in 3.1.4.2). The contractor is not responsible for ordering fuel; the cutter will arrange fuel orders themselves once the WI inspections for all tanks are complete.

Text52:
Text54: 1
TOTAL_NO_OF_PAGES: 2
CUST_PROJ_CODE:
DOCUMENT_NUMBER: 70Z08026QMECP00170003
EFFECTIVE_DATE: 2026-03-17T10:26:31.000-04:00
REF_PR_NUM_T: 52000PR260002770
SOL_DOCUMENT_NUMBER: 70Z08026QMECP0017
SOL_OPEN_BID_DATE: 2026-03-13T09:43:02.000-04:00
NO_OF_COPIES: 1
Check Box91: Yes
Check Box92: Off
MANUAL_EXTEND_FLAG: N
Check Box95: Yes
Check Box96: Off
Check Box97: Off
Check Box98: Off
Check Box99: Off
Check Box100: Off
Check Box101: Off
Text1: AMENDMENT CONTROL NUMBER :
HDR_DOCUMENT_NUMBER: 70Z08026QMECP0017
Text134: SUMMARY OF CHANGES :
AMENDMENT_DESCRIPTION: AMEND-CGC HARRIET LANE DS FY26

a. The purpose of this amendment is to respond to questions submitted by vendors.

b. All other terms and conditions remain unchanged.

c. Closing date for this solicitation remains March 23, 2026 at 2:00pm EST.

Text2: Same As Issuing Office
AMD_ISSUING_OFFICE_LADDR:
AMD_ISSUING_OFFICE_LOCCODE:
2026-03-23T08:28:45-0400
GEORGE.KAITY.1381707675

File details come from the government source that posted it. Updated .