REQUEST FOR CLARIFICATION-01

SOLC 70Z080-19-Q-P4500700

USCGC BLUE SHARK DRYDOCK

QUESTION #1

WORK ITEM 29: The SOW calls out Technical Publication 4593D for the Chesterton seals, is this correct?

Answer: Technical Publication P4593D references for the removal of the existing Wartsilla seal.

Under ‘OTHER REFERENCES’ are documents for the installation of the Chesterton Seal:

(Please see separate attachments for these references listed below)

a. Bollinger Shipyard, USCG CPB Project MTU-FA 771903, 07 Feb 2000, Engine/Gearbox

Plant Alignment Instructions 8V396 TE94/Flange mounted BW 255

b. Chesterton, 442C Cartridge Split Mechanical Seal; Installation, Operation &

Maintenance Instructions

QUESTION #2

WORK ITEM 29: Paragraph 3.7.3 states to reinstall propulsion bearings, which bearings are we reinstalling?

Answer: Paragraph 3.7.3 should reference to proceed with installation of shaft bearings IAW:

WORK ITEM 10: Intermediate Water-Lubricated Propulsion Shaft Bearings, Renew WORK ITEM 11: Aft Water-Lubricated Propulsion Shaft Bearings, Renew

QUESTION #3:

WORK ITEM 31: Is the intent to install the controller for the Engine Room cooling fan?

Answer: Yes, the intent is to install the motor controller for the Engine Room cooling fan.