ATTACHMENT-1__Schedule_for_BLUE_SHARK_DD.xls
XLS spreadsheet 46 KB Posted
- Attached to
- DRYDOCK USCGC BLUE SHARK Federal contract opportunity
- Solicitation number
- 70Z080-19-Q-P4500700
About this file
Attachment-1 Schedule of Services for USCGC BLUE SHARK DD
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| MTU_F_A_771903_(2).pdf | ||
| 4499_243_A.pdf | ||
| REQUEST_FOR_CLARIFICATION_01_BLUE_SHARK.pdf | ||
| SF30_AMEND_A00001_RFQ_70Z080-19-Q-P4500700_BLUE_SHARK_DD.pdf | ||
| SOLC_BLUE_SHARK_DD_100118_-_COMB_SYNOP_NMB.pdf | ||
| ATTACHMENT-3_TECHNICAL_EVALUATION_FACTORS.pdf | ||
| ATTACHMENT-2__STATEMENT_OF_WORK__USCGC_BLUE_SHARK_DRYDOCK_87360_Rev0_10Jul18.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment-1
| PRICING SCHEDULE FOR: | ||||||
| USCGC BLUE SHARK (WPB-87) DRYDOCK AVAILABILITY FY2019 | ||||||
| AFC | ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| 45 | O-001 | Ultrasonic Thickness Measurements, Perform | JOB | 1 | $0.00 | |
| 45 | D-002 | U/W Body, Preserve (100%) | JOB | 1 | $0.00 | |
| 30 | D-003 | Hull Plating Freeboard, Preserve “100%” | JOB | 1 | $0.00 | |
| 45 | D-004 | Tank, Dirty Oil, Clean And Inspect | JOB | 1 | $0.00 | |
| 45 | D-005 | Tank, Oily Water, Clean And Inspect | JOB | 1 | $0.00 | |
| 45 | D-006 | Tanks (Mp Fuel Service), Clean And Inspect | JOB | 1 | $0.00 | |
| 30 | D-007 | Weatherdeck, Preserve | JOB | 1 | $0.00 | |
| 45 | O-008 | Capastic Fairing, Depth Sounder, Renew | JOB | 1 | $0.00 | |
| 45 | O-009 | Main Engine/Reduction Gear, Realign | JOB | 1 | $0.00 | |
| 45 | D-010 | Intermediate Water-Lubricated Propulsion Shaft Bearings, Renew | JOB | 1 | $0.00 | |
| 45 | D-011 | Aft Water-Lubricated Propulsion Shaft Bearings, Renew | JOB | 1 | $0.00 | |
| 45 | O-012 | Intermediate Bearing Carriers, Renew | JOB | 1 | $0.00 | |
| 45 | O-013 | Aft Bearing Carriers, Renew | JOB | 1 | $0.00 | |
| 45 | O-014 | Stern Tube Interior Surfaces, Preserve 100% | JOB | 1 | $0.00 | |
| 45 | D-015 | Propellers, Renew | JOB | 1 | $0.00 | |
| 45 | D-016 | Speed Log, Skin Valve, Renew | JOB | 1 | $0.00 | |
| 45 | D-017 | Sea Water System, Perform Maintenance | JOB | 1 | $0.00 | |
| 45 | D-018 | Rudder Assemblies, Renew | JOB | 1 | $0.00 | |
| 45 | D-019 | Stern Launch Door, Remove, Inspect and Reinstall | JOB | 1 | $0.00 | |
| 45 | D-020 | Cathodic Protection/Zinc Anodes, Renew | JOB | 1 | $0.00 | |
| 45 | D-021 | Drydock | JOB | 1 | $0.00 | |
| 45 | D-022 | Temporary Services, Provide - Cutter | JOB | 1 | $0.00 | |
| 45 | D-023 | Sea Trial Performance, Support, Provide | JOB | 1 | $0.00 | |
| 45 | D-024 | HVAC System, Repair | JOB | 1 | $0.00 | |
| 30 | D-025 | Interior Deck Covering System, Renew | JOB | 1 | $0.00 | |
| 45 | D-026 | Bench, Water Closet, Renew | JOB | 1 | $0.00 | |
| 45 | D-027 | HVAC Air Intake Box, Renew | JOB | 1 | $0.00 | |
| 45 | D-028 | Windows, Pilothouse, Renew | JOB | 1 | $0.00 | |
| 45 | D-029 | Propulsion Shaft and Shaft Seals, Replace | JOB | 1 | $0.00 | |
| 45 | D-030 | Main Mast, Modify | JOB | 1 | $0.00 | |
| 45 | D-031 | MOTOR CONTROLLER, INSTALL | JOB | 1 | $0.00 | |
| 45 | D-032 | Fathometer Transducer, Renew (TCTO TF1010) | JOB | 1 | $0.00 | |
| 45 | D-033 | Oily Water Separator, Remove | JOB | 1 | $0.00 | |
| 45 | D-034 | Structural Analysis, 3D Laser Scan, Perform | JOB | 1 | $0.00 | |
| 30 | D-035 | Insulation, Renew | JOB | 1 | $0.00 | |
| O-00A | Composite Labor Rate | Hour | 1 | $0.00 | ||
| D-00B | GFP Report | NSP | EA | NSP | ||
| O-00Z | Laydays | Day | 5 | $0.00 | ||
| Total Price of Definite Items | $0.00 | |||||
| Total Price of Option Items | $0.00 | |||||
| Total Price of Definite and Optional Items | $0.00 |
&C(6/11/2018) Draft-1 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| O-001 | 1 | 62 | Baltimore, MD | |||||||||||||||||||||
| 1 | 52 | Biloxi, MS | ||||||||||||||||||||||
| 1 | 56 | Boston, MA | ||||||||||||||||||||||
| 1 | 50 | Charleston, SC | ||||||||||||||||||||||
| 1 | 60 | Corpus Christi, TX | ||||||||||||||||||||||
| 1 | 51 | Hampton Roads | ||||||||||||||||||||||
| 1 | 64 | Honolulu, HI | ||||||||||||||||||||||
| O-008 | 1 | 55 | Houston, TX | |||||||||||||||||||||
| O-009 | 1 | 56 | Los Angeles, CA | |||||||||||||||||||||
| 1 | 55 | Median Rate | ||||||||||||||||||||||
| 1 | 49 | Miami | ||||||||||||||||||||||
| O-012 | 1 | 50 | Narragansett Bay, RI | |||||||||||||||||||||
| O-013 | 1 | 55 | New London, CN | |||||||||||||||||||||
| O-014 | 1 | 45 | New Orleans | |||||||||||||||||||||
| 1 | 62 | NYNY | ||||||||||||||||||||||
| 1 | 49 | Panama City, FL | ||||||||||||||||||||||
| 1 | 60 | Philadelphia, PA | ||||||||||||||||||||||
| 1 | 51 | Portland, ME | ||||||||||||||||||||||
| 1 | 57 | Portland, OR | ||||||||||||||||||||||
| 1 | 55 | San Diego, CA | ||||||||||||||||||||||
| 1 | 67 | San Francisco, CA | ||||||||||||||||||||||
| 1 | 55 | Santa Barbara, CA | ||||||||||||||||||||||
| 1 | 55 | SE North Carolina | ||||||||||||||||||||||
| 1 | 65 | Seattle, WA | ||||||||||||||||||||||
| 1 | 48 | Tampa-St. Petersburg | ||||||||||||||||||||||
| 1 | 60 | Wilmington, DE | ||||||||||||||||||||||
| 1 | ||||||||||||||||||||||||
| 1 | ||||||||||||||||||||||||
| 1 | ||||||||||||||||||||||||
| 1 | ||||||||||||||||||||||||
| 1 | ||||||||||||||||||||||||
| 1 | ||||||||||||||||||||||||
| 1 | ||||||||||||||||||||||||
| 1 | ||||||||||||||||||||||||
| 1 |
&C(09/28/2009)_x000D_ Page &P of &N
CostEstimateTemplate