About this file

This document contains a federal contract opportunity and related technical file. The federal contract opportunity is a solicitation from the Department of Homeland Security United States Coast Guard for design-build services to upgrade mooring and structural piers at the US Coast Guard Base in Honolulu, Hawaii. The scope of work includes demolishing an existing floating pier, constructing a fixed pier extension to berth a 225-foot seagoing buoy tender, providing a shore tie mound, and optional items to construct a floating pier to berth a 154-foot fast response cutter and a pier extension between an existing bulkhead and new wharf. The technical file describes the existing telecommunications infrastructure at the Coast Guard base, including copper and fiber optic cabling, telecom cabinets, splices, and related equipment.

View the file

Other files

File Type Posted
Amendment 009.pdf PDF
Davis-Bacon Act WD HI20240001.pdf PDF
70Z04724RPCI0002 Amendment 010.pdf PDF
70Z04724RPCI0002 Amendment 008.pdf PDF
USCG Base Honolulu Preliminary Draft EA_013024.pdf PDF
70Z04724RPCI0002 Amendment 007.pdf PDF
CG Base Hono Marine Report V.2.pdf PDF
Base Map_FG.pdf PDF
U.S. Coast Guard C4&IT Shore Tie Cable Standards (Rev 1.4).pdf PDF
Site Visit Log.pdf PDF
70Z04724RPCI0002 Amendment 006.pdf PDF
2023 Preliminary Topographic Survey.pdf PDF
WLB MOORING AND STRUCTURAL PIER UPGRADES14 NOV 23.pdf PDF
Final-LoC USCG Berth Extension.pdf PDF
BA_EFHA_USCG_Hono_103023_with appendices.pdf PDF
70Z04724RPCI0002 Amendment 005.pdf PDF
70Z04724RPCI0002 Amendment 004.pdf PDF
70Z04724RPCI0002 Amendment 003.pdf PDF
RFI Submittal Form.xlsx XLSX spreadsheet
SITE VISIT ACCESS REQUEST.xlsx XLSX spreadsheet
70Z04724RPCI0002 Amendment 002.pdf PDF
Attachment H_FIRM 15003C0361G.pdf PDF
70Z04724RPCI0002 Amendment 001.pdf PDF
Attachment G_PMDS Form.xlsx XLSX spreadsheet
Attachment K_Electrical Shore Ties SILC-CSTO-36.pdf PDF
14-19099232_WLB HONO_COMBINED DWG_FINAL.pdf PDF
70Z04724RPCNI0002.pdf PDF
Solicitation Price Proposal Form.docx DOCX document
Wage Determination HI20230001.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRITCHARD ST.

EMH

EMH

SFM4

FH

PAR SHOP

FH-3

M A

G A

Z

IN

E

LP FH-2

LP

CMH

S O H

W12

T R

A

IL

E R

X

MSST

ADMIN

BLDG

TRAILER

56 X 12TRAILER

56 X 12

TRAILER

56 X 12 STORAGE

BUILDING

SD48

UNPAVED

AREA

2-4in Crushed conduit

EDGE OF

PAVEMENT

110'

LP

LP

LP

200' 0

EMH

CMH

EMH

EMH

HEALY AVE.

225'

CMH

CMH

EMH

JAMES AVE.

LP

EMH

SS4

DOG HOUSE #2

(w14)

378'

NOTE:

WHARF DIMENSIONS ARE

APPROXIMATE. SEE WHARF

LOADING DRAWINGS FOR ACTUAL

DIMENSIONS.

200' 400'

CMH

EMH

DOG HOUSE #1

(w15)

POWER MOUND #2

arm ory

ESU

WPB telephone room. incoming 50pr from ISC demarc feeds WPB bldg, 110 pier, 87' Ahi pier.

equipment room. terminates 200pr from Galley pedestal. distributes dial tones to Galley and clinic via 25 and/or 50pr

200pair splice feeds Armory, PAR, with extra pairs leftover for range

25pair. side A: 1200pr splice NW corner of ESU bldg. Side B:Club14 telephone room.****Installed 2005****

25pair. side A: 1200pr splice NW corner of ESU bldg. Side B:Club14 telephone room.****Installed 2005****

25pair. side A: 1200pr splice NW corner of ESU bldg. Side B:Club14 telephone room.****Installed 2005****

Contains 1200pr to 1200pr stright thru splice.

main trailer feed to adjacent trailers

50pair 24awg telecom cable installed 2005

50pair 24awg telecom cable installed 2005

50pair 24awg telecom cable installed 2005

25 pair 24 awg copper cable from WPB demarc to 110 power mound. Installed 2006

25 pair copper 24awg WPB demarc to Ahi pier shore tie box

25 pair copper 24awg WPB demarc to Ahi pier shore tie box. Installed 2005

25 pair copper 24awg WPB demarc to Ahi pier shore tie box

100pr from bldg 645 to ESU 1st deck TC. 3 PRI's for PBX ride on this cable***Installed 2005***

25pair. side A: 1200pr splice NW corner of ESU bldg. Side B:Club14 telephone room.****Installed 2005****

100pr from bldg 645 to ESU 1st deck TC. 3 PRI's for PBX ride on this cable***Installed 2005***

25 pair copper 24awg WPB demarc to Ahi pier shore tie box

25 pair copper 24awg WPB demarc to Ahi pier shore tie box

25 pair 24 awg copper cable from WPB demarc to 110 power mound.

25 pair 24 awg copper cable from WPB demarc to 110 power mound.

right click to view MH diagram

3M 4950 telecom cabinet with 3m MS2 connectors

1200 pair splice.***INSTALLED 2005***. prs 1-1150 spliced to Galley 2700pr pedestal. Prs 1151-1175 spliced onto 25prs to Gym TR. Prs 1176-1200 are spliced to Club 14 TR.

outdoor cat5 feeds from northern trailer to small telcom cabinets in each adjacent trailer.

outdoor cat5 feeds from northern trailer to small telcom cabinets in each adjacent trailer.

outdoor cat5 feeds from northern trailer to small telcom cabinets in each adjacent trailer.

outdoor cat5 feeds from northern trailer to small telcom cabinets in each adjacent trailer.

100pr from bldg 645 to ESU 1st deck TC. 3 PRI's for PBX ride on this cable***Installed 2005***

200pr pier feed. terminates to indoor splice in MDF than to Lightning protection blocks. ****installed 2005*** two 600pr 24awg cable from MDF to ESU 1st deck TR. Feeds PBX dial tones back to MDF for distribution around base,***installed 2005****

1200pr feed from MDF to 1200par splice in maint.hole at NW corner of ESU bldg. Feeds Galley telecom cabinet which feeds everything west of ESU bldg. Station, MSST,Galley,Clinic,armory etc.***OLD.NEEDS REPLACING***

25pair. side A: 1200pr splice NW corner of ESU bldg. Side B:Gym telephone room.****Installed 2005****

Two 600pr 24awg copper teleco cable. Side A- 1200pr splice in manhole @ NW corner of ESU bldg. Side B- Galley 2700pr cabinet. *** INSTALLED 2005***

2700pr telecom cabinet feeds terminates two 600pr cables from 1200pr splice near NW corner of ESU bldg.***INSTALLED 2005*** Feeds Galley, clinic, MSST, North40 pedestal crushed conduit. not usable. 2005 -ITC Brashier

200pr copper 24awg from Galley Telecom cabinet to ISC BEQ equipment room. Feeds Clinic, Galley, BEQ OOD offices

200pr from Galley pedestal to North 40 pedestal. ***Installed 2005*** feeds floating Ahi pier, WPB bldg, ANT, MSST, Echo pier, ALL of North40 area

900pr telecom cabinet. 200pr feed terminates from Galley pedestal. this Pedestal feeds WPB pier, WPB bldg, AHI peir, Echo pier, the adjacent Sector Hono Trailer park, MSST 200pr feed from North40 pedestal to MSST pedestal.

Pier powermound feeds. 25pair each. ***Installed 2004***

25pair from 645 incoming demarc to Exchange demark in wherehouse.

100pr from MDF to supply. install date unknown

4pr outdoor cat5 from Club TR to security gate for phone extensions.

CATV feed to ESU 1st deck TR. also possible alt route for PBX/CGDN+ cabling. limited conduit space.

Model Space�

File details come from the government source that posted it. Updated .