FOR DHS NMACC III POOL 3 PHASE II OFFERORS ONLY - WLB Mooring and Structural Pier Upgrades at USCG Base Honolulu
Solicitation number
70Z04724RPCNI0002
Issued by

About this file

This document is an amendment to a solicitation for a federal contract opportunity. The amendment incorporates an updated Wage Determination for the "NATIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT (NMACC III) POOL 3; WLB MOORING AND STRUCTURAL UPGRADES, BASE HONOLULU" project. The project requires the Design/Build for a Berth G Pier extension at Coast Guard Base Honolulu, Hawaii, including demolishing and disposing of the floating pier at Berth F, constructing a fixed pier extending from Berth G to berth a 225-ft Seagoing Buoy Tender (WLB), and providing a shore tie mound. There are also optional items to construct a floating pier to berth a 154-ft Fast Response Cutter and a pier extension between the existing bulkhead and new wharf. This amendment is being issued to the Pool 3 Phase II Offerors under Solicitation Number 70Z04724RPCNI0002.

View the file

Other files

File Type Posted
Amendment 009.pdf PDF
Davis-Bacon Act WD HI20240001.pdf PDF
70Z04724RPCI0002 Amendment 008.pdf PDF
USCG Base Honolulu Preliminary Draft EA_013024.pdf PDF
70Z04724RPCI0002 Amendment 007.pdf PDF
CG Base Hono Marine Report V.2.pdf PDF
Base Map_FG.pdf PDF
U.S. Coast Guard C4&IT Shore Tie Cable Standards (Rev 1.4).pdf PDF
Site Visit Log.pdf PDF
70Z04724RPCI0002 Amendment 006.pdf PDF
2023 Preliminary Topographic Survey.pdf PDF
WLB MOORING AND STRUCTURAL PIER UPGRADES14 NOV 23.pdf PDF
ISCcopperOSP.pdf PDF
Final-LoC USCG Berth Extension.pdf PDF
BA_EFHA_USCG_Hono_103023_with appendices.pdf PDF
70Z04724RPCI0002 Amendment 005.pdf PDF
70Z04724RPCI0002 Amendment 004.pdf PDF
70Z04724RPCI0002 Amendment 003.pdf PDF
RFI Submittal Form.xlsx XLSX spreadsheet
SITE VISIT ACCESS REQUEST.xlsx XLSX spreadsheet
70Z04724RPCI0002 Amendment 002.pdf PDF
Attachment H_FIRM 15003C0361G.pdf PDF
70Z04724RPCI0002 Amendment 001.pdf PDF
Attachment G_PMDS Form.xlsx XLSX spreadsheet
Attachment K_Electrical Shore Ties SILC-CSTO-36.pdf PDF
14-19099232_WLB HONO_COMBINED DWG_FINAL.pdf PDF
70Z04724RPCNI0002.pdf PDF
Solicitation Price Proposal Form.docx DOCX document
Wage Determination HI20230001.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

2. AMENDMENT/MODIFICATION NUMBER

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

NATIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT (NMACC III) POOL 3; WLB MOORING AND

STRUCTURAL UPGRADES, BASE HONOLULU

This amendment incorporates the revised/updated Wage Determination. See Attachment.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

Facilities Design & Construction Center 5505 Robin Hood Rd, STE K Norfolk, VA 23513

70Z04724RPCI0002

6/7/2024

9B. DATED (SEE ITEM 11)

11/30/2023

1 1

X

70Z04724RPCI0002 Amendment 002.pdf
Continuation Page
Base Hono Map Pre-Bid Site Visit
Continuation Page .pdf
Insert: CamerA SYSTEM Specs: The camera system shall:
Continuation Page .pdf
Insert: CamerA SYSTEM Specs: The camera system shall: