This is a Questions and Answers document for RFP 70Z03826QE0000009, issued by the United States Coast Guard (USCG) on February 9, 2026. The document addresses 35 contractor inquiries regarding the installation of intrusion detection systems (IDS) and closed-circuit television (CCTV) systems at two USCG facilities in Elizabeth City, North Carolina: Building 80 (300-400 square feet, 10-12 years old) and a Leased Hangar (1,200-1,600 square feet, 15-25 years old). Building 80 will require three motion sensors while the Leased Hangar will require five. Both locations have single main entrance doors with existing IDS sensors of unknown manufacturability and reusability. An existing CCTV system is in place at Building 80, but none exists at the Leased Hangar. The Government cannot verify equipment reusability and encourages on-site visits for clarification.
Key requirements include integrating the new IDS with the existing access control system, installing DMP XR-550 panels and high-security switches, implementing 24/7 remote security monitoring through a UL-licensed central monitoring station, and providing battery backup with 24-hour capability (each building has a backup generator). Both facilities feature suspended drop ceiling tiles, concrete block/concrete perimeter walls, and metal door frames. The Government will not release facility drawings for the classified workspaces, provide a budget range, or allow partial or progressive payments. Exterior cameras should be mounted at 6' to 10' heights. Both buildings already have proper cipher locks or CDX series pedestrian door combination locks installed. Interested parties are encouraged to schedule on-site visits to assess existing infrastructure, including cable reusability, cable tray availability, and conduit requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Number Question USCG Response 1 Attachment 2 – Statement of Work (SOW) Combined
Synopsis/Solicitation 70Z03826QE0000009, section 2.1. states these systems must meet the requirements for classified workspaces as outlined in COMDTINST M5530.1C Chapter 4.
Where can I get a copy of COMDTINST M5530.1C Chapter 4?
Unable to find in the USCG web site.
Internet release is not authorized. The Government POC cited in the SOW will be able to provide a copy for review during site visits.
2 Attachment 2 – Statement of Work (SOW) Combined Synopsis/Solicitation 70Z03826QE0000009, Page
2. This list installing the DMP XR-550 panels and High Security switches, Install a CCTV system and other devices but there is no list or drawing to show where or the quanity required. Can you provide specific quanities of the devices for the IDS and CCTV systems?
Intrusion detection system for two Govt classified workspaces with single entrance/exit doors, with all control heads/battery backup power and related equipment located inside the classified workspace. Motion sensing equipment for main workspaces, above false ceilings and below floor tiles.
Balanced magnetic switch for two main entrance doors. Video monitoring for exterior of CWS entrance door in leased hanger with remote release and video monitor located inside the CWS. Remote security alert monitoring service 24/7 – 365 with cellular or equivalent communications between the local IDS system and the monitoring service location.
Equipment service and/or warranty contract required.
3 Is there an existing CCTV system? Can any of these componets or cabling be reused? Please provide more details on the CCTV system, Type of cameras required including MP and specifics for FOV, Number of cameras required, Interior or exterior cameras? Is there a specific type of VMS required?
Bldg. 80 Yes an existing CCTV system is in place. Unsure if any of that equipment is reusable. No CCTV is currently installed in the Leased Hanger building.
4 Attachment 2 – Statement of Work (SOW) Combined Synopsis/Solicitation 70Z03826QE0000009, item 2.0, page 2. States to integrate the IDS with the existing access control system. What is the existing access control system to know what is required for integration?
It may be possible to reuse existing installed equipment but the Government cannot verify if any of that equipment is reusable. Interested parties are encourged to schedule an on-site visit.
5 Attachment 2 – Statement of Work (SOW) Page 2, Item 2.1,1. States Continuous Monitoring: IDS systems must be monitored 24 hours a day by an authorized central monitoring station. Is a UL licensed monitoring station an authorized monitoring station?
Yes
6 CLIN 0001 & 0002 have the same description. As there are two locations for installation. ESD, Building 80 1664 Weeksville Road Elizabeth City, NC 27909 & ESD, Leased Hangar (Upstairs Space) 1014 Consolidated Road Elizabeth City, NC 27909. Which CLIN is for which location?
The job is the same for both locations, so determining which CLIN is which is not important at this time. When the award is made, the two clins will be more detailed.
7 Are there drawings for this solicitation to know where the equipment will be installed? Also is there a list of equipment required, IE: IDS BMS, Motion detectors, CCTV cameras, ETC?
I am unable to release facility drawing for a Govt Classified Workspace. The rest of this question is answered in #2 above; Interested parties are encourged to schedule an on-site visit.
8 How old is the facility? Bldg 80 is 10-12 yrs; Leased hanger is 15-25 yrs
9 How much square footage is in the facility? Bldg 80 is 300-400 square foot (sf); Leased Hanger is 1200 to 1600 sf.
10 How stable is the power? Yes
11 Is there a dropped ceiling in all areas of installation? Yes
12 What type of walls are in the perimeter areas? Concrete block and/or concrete.
13 Do we need to drill between the walls, to run our cable infrastructure?
Possibly, but existing holes / conduit should be available for reuse.
14 Do we need to use conduit? If yes, what do you estimate the total conduit footage will be?
Unlikely but possible. Amount would vary by application.
70Z03826QE0000009
Responses to Questions
Amendment 1 Answers provided 9 February 2026
This document provided United States Coast Guard (USCG) responses for questions that have been asked regarding request for proposal (RFP) 70Z03826QE0000009. Question numbers are provided simply as a reference and in no way infer a prioritization of the questions.
Number Question USCG Response 15 Are the door frames metal and concrete filled? Yes
16 Please provide a comprehensive list of quantities of all IDS items needed (e.g. total number of motion sensors, glass breaks, etc.) per location.
Bldg. 80 will require three (3); Leased Hanger will require five (5).
17 Do you currently have existing IDS Sensors in your doors?
Please specify which doors.
Yes, single main entrance door to both locations has an IDS sensor currently installed, but the Government doesn't know if that equipment could be reused.
18 What is the manufacturer of the existing IDS system? Both spaces have previously used systems installed, but the manufacturer is unknown.
19 Will we be able to reuse the existing cable? If so, what type of cable is there currently?
Possibly, but the cable currently used is unknown; Interested parties are encourged to schedule an on-site visit.
20 Are Ceilings Suspended? Or Hard Lid? Suspended pop out drop ceiling tiles in both spaces.
21 Are there existing Cable Trays for wiring above ceilings? Unknown; Interested parties are encourged to schedule an on-site visit.
22 Can Existing Wiring be utilized? Unknown; Interested parties are encourged to schedule an on-site visit.
23 Is a “UPS” required? If so, What Time/Power Duration is required?
Yes, Battery backup is required with 24 hr capability, but each building is equipped with a backup generator.
24 re “Or Equal” Equipment substitutions allowed? Unknown
25 Is “Plenum Wire” acceptable? Unknown
26 Is “After Hours Access” for said work, available to contractor at no add’l cost to the Government?
No.
27 What is the height of Exterior Cameras? (If any) 6' to 10'
28 Please provide a list of equipment and parts # that are to be installed.
See response to Question # 2.
29 Are there pipe chases between floors? N/A
30 What is the range of the budget for this project, and is it already appropriated?
The Government is unable to disclose a budget for this project. It is a formal solicitation with award being made to the lowest technically acceptable offeror.
31 Because of the high cost of the parts can we bill when parts arrive on site, or in the alternative are progress payments allowed?
No, partitial or progressive payments will be allowed.
32 How many feet of new wire will have to be run? Unknown; Interested parties are encourged to schedule an on-site visit.
33 What kind of cipher lock and quantities are required e.g. X-10 Both buildings already have the proper cypher and/or the required CDX series pedestrian door combination locks
34 Please post the sign in sheet and Q&A's from the site visit. A list of vistors will not be posted. Interested parties are encourged to schedule an on-site visit.
35 Please post the drawings and the key for the drawings. Site drawings cannot be provided for Government Classified workspaces.
Interested parties are encourged to schedule an on-site visit.
RFI's
File details come from the government source that posted it. Updated .