Responses to Questions Amend 3.pdf
PDF 125 KB Posted
- Attached to
- Fluorescent Penetrant Inspection (FPI) Wastewater Treatment System with Closed-Loop Water Recycler (WWTS)
- Solicitation number
- 70Z03824QK0000024
About this file
This document contains responses to questions regarding a Request for Quotation (RFQ) for a Fluorescent Penetrant Inspection (FPI) Wastewater Treatment System with Closed-Loop Water Recycler for the United States Coast Guard (USCG).
The USCG is seeking to purchase, install, and receive start-up support for an FPI Wastewater Treatment System to be delivered to Elizabeth City, North Carolina. The system must be able to process various metal parts, with the largest part size being 2ft by 3ft. The solicitation includes the purchase of additional items such as Extran A4A Membrane, bag filters, and replacement carbon. This is a 100% small business set-aside with the applicable NAICS code being 333310. Offers must be submitted by 5 July 2024, and the anticipated award date is on or about 12 July 2024. Pricing must include delivery and installation to make the system fully operational, with a required delivery date of 26 September 2024. Detailed specifications and evaluation criteria are provided in the attached "Instructions to Offerors" and Statement of Work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Responses to Questions Amend 2.pdf | ||
| Responses to Questions Amend 1.pdf | ||
| Statement of Work (SOW).pdf | ||
| SOW Attachment 1 ALC Visitor Contractor Brochure.pdf | ||
| SOW Exhibit 1.pdf | ||
| Terms and Conditions.pdf | ||
| Schedule of Supplies and Services.xlsx | XLSX spreadsheet | |
| Notification of Services Rendered Form.pdf | ||
| Instructions to Offerors.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
70Z03824QK0000024
Responses to Questions
Amendment 3 Answers provided 10 July 2024
This document provides United States Coast Guard (USCG) responses for questions that have been asked regarding request for quotation (RFQ) 70Z03824QK0000024. Question numbers are provided simply as a reference and in no way infer a prioritization of the questions.
Number Question USCG Response 1 Estimate of annual consumption (gallons/year) of the raw penetrant by the inspection process line?
25 gallons per year (estimated by draw out and product replacement every year)
2 Base material of parts to be processed? Aluminum, Magnesium, Stainless steel, Titanium
3 Size of largest part? 2ft wide by 3ft long
4 Parts per day to be processed? Average 25 parts per day
5 Basic description of the tanks in the penetrant line?
Typically, as follows:
Tank 1 – Penetrant Tank 2 – Dwell Tank 3 – Rinse (immersion or spray?)
Tank 4 – Emulsifier (If the process is post emulsifiable, or PE) Tank 5 – Rinse (immersion or spray?)
Tank 6 – Dryer Tank 7 – Developer
**Note: If this is a water washable application, omit Tank 4 and Tank 5.
Tank 1 -Penetrant Tank 2 -Dwell Tank 3 -Emulsifier Tank 4 -Dwell Tank 5 -Rinse Tank 6 -Dryer Tank 7 -Developer Tank 8 -Inspection Booth
Type 1 Post-Emulsifiable Lipophilic Method B
6 Are the two rinses spray or immersion.
Parts are rinsed by spray method with hot water at the temperatures indicated in the solicitation.
70Z03824QK0000024
Responses to Questions
Amendment 3 Answers provided 10 July 2024
Typically, there is a rinse, just following the Dwell, after the Penetrant, resulting in two rinse tanks on these lines.
This rinse, oftentimes called the “Pre-Rinse”, is used to rinse off the Penetrant and the second rinse, called the “Post-Rinse” is used to rinse off the emulsifier. Is there a Pre-Rinse.
Basic description of the tanks in the penetrant line: Type 1 Post-Emulsifiable Lipophilic Method B:
1. Penetrant
2. Dwell
3. Emulsifier
4. Dwell
5. Rinse
6. Dryer
7. Developer
8. Inspection Booth
We use only one rinse station; it is used for both of these steps listed in the question.
Currently all the products from both processes end up in a holding tank and are eventually removed as hazardous waste.
This is the reason the solicitation is posted for a Wastewater Treatment System with Water Recycler options, with specifics noted in the SOW. Any company who is interested must meet our requirements and be able to process the chemicals to the levels as noted in the SOW. Size restrictions of the system are of a major concern as well due to the footprint of the shop space as specified in the SOW.
PLEASE REFER TO THE SOLICITATIONS ATTACHMENT 1 “INSTRUCTIONS TO OFFERORS” FOR A
COMPLETE LIST OF THE SALIENT CHARACTERISTICS AND REQUIREMENTS.