Questions_Answers for 70Z03326Q2019000003 UPDATED 25JUN26.pdf
PDF 167 KB Posted
- Solicitation number
- 70Z03326Q2019000003
About this file
This is a Questions & Answers document for federal contract opportunity 70Z03326Q2019000003, updated June 25, 2026.
The document addresses three key clarifications regarding contract performance. Work must be completed during normal business hours Monday through Friday from 0600 to 1700, with after-hours work permitted only upon Contracting Officer approval. Regarding drywall repair associated with removal of existing rubber cove base, offerors should make every effort to prevent damage during removal but must include a unit price add/alternate for drywall patching where unavoidable damage occurs to facilitate new cove base installation. For floor preparation related to undulations noted during site visit, offerors must include all necessary labor, materials, and incidentals per Sections 1.1 and 1.2 of the Statement of Work to ensure proper carpet tile installation, including removal of existing adhesive and subfloor cleaning. If floor undulations require additional preparation activities such as leveling or patching to meet carpet manufacturer installation guidelines and ensure quality results, these activities and associated costs must be clearly identified in the proposal submission.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions & Answers for 70Z03326Q2019000003 Updated: 25 June 2026
What are the working hours for the contract?
Work is to be completed during normal working hours (M-F 0600-1700). After-hours work may be completed upon approval from Contracting OƯicer.
Should oƯerors include pricing for drywall repair in association with the removal of the existing cove base?
When removing the old rubber cove base, every eƯort shall be made to prevent any drywall damage. Where damage is unavoidable, please include a unit price add/alternate to patch the drywall to facilitate new cove base installation.
A few undulations in the floor plate were noted during the site visit. Should floor prep be included in oƯers?
Based on Section 1.1 and 1.2 of the SOW, oƯers should include all necessary labor, materials, and incidentals to ensure proper installation of the new carpet tile. This includes removal of existing adhesive and thorough cleaning of the subfloor. If undulations in the floor plate require additional floor preparation (such as leveling or patching) to meet the carpet manufacturer’s installation guidelines and ensure a quality finished product, floor prep should be included in your oƯer. Please clearly identify any proposed floor prep activities and associated costs in your submission.