A00001 MSRT Boat Maintenance Statement of Work .pdf
PDF 149 KB Posted
- Solicitation number
- 70Z02325R73110001
About this file
This Statement of Work (SOW) details maintenance and upgrade services for U.S. Coast Guard Maritime Security Response Teams' Special Purpose Craft boats. The contract is an Indefinite Delivery Indefinite Quantity (IDIQ) for maintaining eight Special Purpose Craft - Boarding Team Delivery II (SPC-BTD II) and four Special Purpose Craft - Law Enforcement (SPC-LE) boats located in San Diego, California and Chesapeake, Virginia. The boats operate approximately 250 hours annually and require periodic maintenance, repairs, and potential design upgrades to extend their operational life.
The SOW outlines specific maintenance work packages for both boat types, including semi-annual inspections, routine maintenance at defined hour intervals (250 hours for BTD II, 100 and 300 hours for LE boats), and provisions for "Over and Above" maintenance for unexpected repairs. The contract period runs from August 31, 2025 through September 1, 2030, with a base period and four subsequent ordering periods. Contractors will be responsible for comprehensive maintenance services, including inspections, parts replacement, system checks, and compliance with all applicable safety and quality control regulations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A00002 Attachment 2- Pricing Schedule Worksheet.xlsx | XLSX spreadsheet | |
| A00001 Attachment 2- Pricing Schedule Worksheet.xlsx | XLSX spreadsheet | |
| A0001 Boat Maintenance RFQ 7-16-2025.pdf | ||
| A0001 70Z02325R73110001 Questions and Answers.xlsx | XLSX spreadsheet | |
| Attachment 2- Pricing Schedule Worksheet.xlsx | XLSX spreadsheet | |
| Attachment 3 - Past Performance Questionnaire.pdf | ||
| Attachment 1- Boat Maintenance Statement of Work.pdf | ||
| Boat Maintenance RFQ 7-2-2025.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work U.S. Coast Guard
Special Purpose Craft – Boarding Team Delivery II and Special Purpose Craft – Law Enforcement Boats, Maintenance and Upgrades
A00001
1. BACKGROUND
1.1 U. S. Coast Guard Maritime Security Response Teams (MSRT) utilize 11 Meter (11M)
Special Purpose Craft – Boarding Team Delivery II (SPC-BTD II) and 33’Special Purpose Craft – Law Enforcement (SPC-LE) boats as part of the operational resources.
The SPC-BTD II and SPC-LEs require periodic maintenance as well as design upgrades to improve performance and extend usable life of the boats and associated equipment. The repairs and maintenance will be performed in Two (2) Geographical locations, both the West Coast and East Coast.
2. OBJECTIVES
2.1 The objective of this requirement is to establish a Indefinite Delivery Indefinite
Quantity (IDIQ) contract for repair, maintenance, and upgrade services for the SPC- BTD II and 33’ SPC-LE.
3. SCOPE
3.1 The Contractor shall provide the personnel, management, materials, equipment, and facilities (unless otherwise provided by the Government as stated in the Task Order) necessary to perform any required repair, maintenance, and upgrade services for the fleet of SPC-BTD II and 33’ SPC-LEs located in the San Diego, California and Chesapeake, VA localities. The scope includes pre-defined Work Packages as outlined in this Statement of Work (SOW), in addition to Over-and-Above Work Requests (OAWR) for physical installation of Engineering Change Proposals (ECPs), Non- Engineering Change Proposals (NECPs), and other emergent repairs or necessary upgrades to the SPC-BTD II and 33’ SPC-LE and their associated systems and equipment. All specific requirements for repairs, maintenance, upgrades, ECPs and NECPs shall be addressed in each Task Order. The Contractor is solely responsible for its work techniques and control and supervision of Contractor personnel in performance of the contract. The Contractor shall actively retain all appointments, licenses, certifications, and permits required to perform work under this contract and provide any evidence of such to the Government upon request. The Contractor shall comply with all applicable Federal, State, and Local laws regarding the use, handling, or disposal of hazardous materials required under the contract. Hazardous materials may include, but are not limited to, petroleum products, paints, and coatings.
3.2 Boat Maintenance Work Packages
Standard maintenance packages allow the government to estimate lifecycle costs for these boats based on anticipated inspections and routine maintenance. At certain underway hour milestones, units will schedule maintenance inspections and planned maintenance.
This contract seeks repair services for eight SPC-BTD II boats and four SPC-LE II boats.
These boats operate for approximately 250 hours per year. Vendors can anticipate semi-annual requirements from BTD work package 1 and trailer work packages. BTD work packages are based on 250 hours intervals which are approximately annually. LE work packages are based on 100-hour and 300-hour intervals which will occur slightly more frequently than a year (100-hour tasks) and slightly less frequently than a year (300-hour tasks).
With pre-negotiated prices for work packages, the Coast Guard will be able to plan for upcoming boat maintenance costs. When a boat suffers a mechanical casualty that can’t be addressed by the standard work packages, or if a condition is noted during a routine inspection, then the vendor can provide a cost estimate to do the additional work. If the government agrees to this and finds the estimate reasonable, these additional tasks can be requested and paid for in the “Over and Above” maintenance packages for each boat type.
4. SPECIAL PURPOSE CRAFT – BOARDING TEAM DELIVERY II BOAT
MAINTENANCE REQUIREMENTS
4.1 For SPC-BTD II maintenance, vendors are expected to use maintenance manuals (available online) from the Caterpillar C7.1 diesel engine, the Kamewa FF280 water jet, and Myco NSW 11M RIB articulating trailers.
1.1.1 SPC-BTD II: Work Package 1 – Semi-Annual
Drive shaft – inspect and lubricate
1.2.1 SPC-BTD II: Work Package 2 – after 250 hours of use
Engine oil and filter – change Fuel tank, water and sediment – drain
1.3.1 SPC-BTD II: Work Package 3 – after 500 hours of use
Engine crankcase breather – clean Engine oil and filter – change (every 250 hours) Fuel tank, water and sediment – drain (every 250 hours)
1.4.1 SPC-BTD II: Work Package 4 - after 1000 hours of use
Aftercooler Core - clean / test Engine Crankcase Breather – clean (every 500 hours) Engine Mounts – inspect Heat Exchanger – inspect Turbocharger – inspect Engine oil and filter – change (every 250 hours) Fuel tank, water and sediment – drain (every 250 hours)
1.5.1 SPC-BTD II: Work Package 5 – after 2000 hours of use
Alternator – inspect Coolant Temperature Regulator – replace Crankshaft Vibration Damper – inspect Starting Motor – inspect Water Pump – inspect Aftercooler Core - clean / test Engine Crankcase Breather – clean (every 500 hours) Engine Mounts – inspect (every 1000 hours) Heat Exchanger – inspect (every 1000 hours) Turbocharger – inspect (every 1000 hours) Engine oil and filter – change (every 250 hours) Fuel tank, water and sediment – drain (every 250 hours)
1.6.1 SPC-BTD II: Work Package 6 – Over and Above maintenance The “over and above” work package is designed for damage or maintenance that is not listed in the defined work packages. In these cases, the government will request a quote, and the vendor will provide a quote for the work to be completed.
If the quote is reasonable the government can order the work to be completed with this work package.
1.7.1 SPC-BTD IIL: Trailer Work Package (semi-annual)
Inspect frame, axles, and hardware.
Inspect trailer brakes (pads, calipers, rotors).
Inspect seals and wheel bearings.
Inspect electrical wires, lights, and reflectors. Inspect winch.
Inspect trailer tires, wheels, lugs, and hubs.
Inspect trailer jack.
5. SPECIAL PURPOSE CRAFT – LAW ENFORCEMENT BOAT MAINTENANCE
REQUIIREMENTS
5.1 For SPC-LE / SPC-LE II maintenance, vendors are expected to use maintenance manuals (available online) from the SAFE Boats International, Silver Ships Inc, Mercury Verado (300hp) outboard engines, and Boatmaster trailers.
1.1.1 SPC-LE LE: Work Package 1 – after 100 hours of use
Inspect lower units, propellers, and hull for signs of damage and wear.
Conduct pre-check, start the engines, check for proper operation. Check kill switch and lanyard.
Check steering hardware, fluid level, and proper operation.
Check trim operation and trim indicators.
Check all lights, horn, windshield wipers.
Check batteries and electrical connections (shore-tie and battery charger) Test bilge pumps and bilge alarms
1.2.1 SPC-LE Work Package 2 – after 300 hours of use
Perform a complete visual inspection of the hull and deck. Look for cracks, corrosion, deformities, and damage.
Inspect all welds and hardware on cable channels, radar pod, tow post, taff rail, and handrails.
Perform a complete visual inspection of the transom, engine mount, and hardware for cracks, damage, and wear.
Inspect foam collars, seams, and mounting hardware for cracks and damage.
Inspect shock-mitigating seats for wear, damage, and proper operation. Use appropriate OEM guidance.
Inspect electrical system, panel, wiring and in-line fuses for corrosion, chafing, and proper security.
Check all lights, horn, windshield wipers.
Check steering hardware, fluid level, and proper operation. Replace steering pump filter after 300 hours of use.
Check batteries and electrical connections (shore-tie and battery charger) Check condition and operation of gun locks, lubricate and apply corrosion inhibitor.
Check corrosion control anodes, replace before 50% eroded.
Test bilge pumps and alarms
1.3.1 SPC-LE Work Package 3 – Over and Above maintenance
The “over and above” work package is designed for damage or maintenance that is not listed in the defined work packages. In these cases, the government will request a quote, and the vendor will provide a quote for the work to be completed.
If the quote is reasonable the government can order the work to be completed with this work package. The Government will request an inspection and estimate for all over and above work. Vendors can charge the government for an appropriate hourly rate for the inspection/estimate.
1.4.1 SPC-LE Trailer Work Package (semi-annual)
Inspect frame, axles, and hardware.
Inspect trailer brakes (pads, calipers, rotors).
Inspect seals and wheel bearings.
Inspect electrical wires, lights, and reflectors. Inspect winch.
Inspect trailer tires, wheels, lugs, and hubs.
Inspect trailer jack.
6. DELIVERABLES
Description Number SOW Ref.
Delivery Date
Inspection Summary Report
(ISR)
0001 4 Upon Government Inspection, within two (2) work days of completion of work performed under the Task Order
Post Award Conference 0002 10 calendar days after Post Award Conference
Post Award Conference Minutes
0003 4.8 5 calendar days after post award conference, Post award minutes
Contractor Manpower Reporting
0004 6.0 Annually NLT 31 October and at contract completion
7. CONTRACTOR MANPOWER REPORTING
7.1 The Contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30.
8. CONTRACTOR TRAVEL
8.1 Contractor travel outside the San Diego, California or Chesapeake, Virginia locality is not anticipated, unless otherwise specified and negotiated at the Task Order level.
9. SECURITY
9.1 Contractor must be able to obtain personnel and vehicle access to military installations.
Contractor shall coordinate all necessary access through the local Military Pass and Decal Office.
10. SAFETY
10.1 The contractor shall take responsibility for complying with applicable Federal, State, and Local laws, ordinances, codes and regulations (including those requiring applicable licenses and permits) in connection with the performance of this contract.
11. GOVERNMENT PROVIDED PARTS/MATERIALS
11.1 The Government is not expected to provide parts or materials for this contract
12. QUALITY CONTROL
12.1 The contractor shall implement and maintain a Quality Control Plan (QCP) to ensure work performed conforms to the scope of work and meets the requirements under this SOW. The QCP shall, at a minimum provide a method for performing inspections; identifying, correcting, and preventing problems/defective service; addressing customer complaints, and improving the quality of services over the life of the contract.
13. QUALITY ASSURANCE
13.1 The Government reserves the right to perform inspections and surveillance to evaluate the Contractor’s compliance to the contract terms and performance of the requirements in the SOW. The Government will make every effort to ensure that the surveillance methods used are conducted in an objective, fair, and consistent manner. The COR will make every effort to ensure that the surveillance methods used are conducted in an objective, fair, and consistent manner.
13.2 Contract Discrepancy Report (CDR). In the event of unsatisfactory contractor performance, the Contracting Officer (KO) will issue a CDR that will explain the circumstances and findings concerning the incomplete or unsatisfactory service. The contractor shall acknowledge receipt of the CDR and respond in writing as to how he/she shall correct the unacceptable performance and avoid a recurrence. The Government will review the contractor's corrective action response to determine Acceptability and will use any completed CDR as part of an overall evaluation of Contractor performance when determining present or future contractual actions.
14. PLACE OF PERFORMANCE
14.1 This maintenance contract serves two units located in San Diego, California and
Chesapeake, Virginia unless otherwise specified in the Task Order. The contractor will be responsible for transporting boats (i.e., over the road) identified for repairs under this contract between their own designated facilities and the Coast Guard units involved.
15. ANTICPATED PERIOD OF PERFORMANCE
Base Period: August 31, 2025 – September 01, 2026 Ordering Period 1: August 31, 2026 – September 01, 2027 Ordering Period 2: August 31, 2027 – September 01, 2028 Ordering Period 3: August 31, 2028 – September 01, 2029 Ordering Period 4: August 31, 2029 – September 01, 2030
File details come from the government source that posted it. Updated .