Amendment A00005 - Attachment_9_Questions_and_Clarifications_Form_CB-LRI III_RFP_A00005.xlsx

XLSX spreadsheet 37 KB Posted

Attached to
Long Range Interceptor Cutter Boat, 3rd Generation (LRI III)
Solicitation number
70Z02322R93250001
Issued by

About this file

This document contains questions and clarifications from potential offerors regarding solicitation number 70Z02322R93250001 for the Long Range Interceptor Cutter Boat 3rd Generation (LRI III) requirement. The U.S. Coast Guard is seeking to procure up to 17 CB-LRI III boats. Clarifications were provided that removed continuous duty cycle language from requirements for marine diesel engines and transmission systems, instead describing mission profiles. An extension to the proposal due date was not granted, despite suppliers still awaiting technical and pricing information.

View the file

Other files

File Type Posted
Amendment A00005 - 70Z02322R93250001 - SF30_A00005.pdf PDF
Amendment A00005 - Attachment_4_Compliance_Matrix_CB_LRI_III_RFP_A00005.xlsx XLSX spreadsheet
Attachment_1_CB_LRI_III_Spec_Rev_A00004.pdf PDF
Amendment A00004 - 70Z02322R93250001 - SF30_A00004.pdf PDF
Amendment A00004 - Attachment_9_Questions_and_Clarifications_Form_CB-LRI III_RFP_A00004-11-18-2022.pdf PDF
Amendment A00003 - SF1449_70Z02322R93250001_A00003.pdf PDF
Amendment A00003 - 70Z02322R93250001 - SF30_A00003.pdf PDF
Amendment A00003 - Attachment_8_Solicitation_Provisions_CB-LRI III_RFP_A00003.pdf PDF
Attachment_7_Questions_and_Clarifications_Form_CB-LRI III_RFP - Phase 2.pdf PDF
Attachment_1_Specification_CB_LRI_III_A00001.pdf PDF
Attachment_4_Compliance_Matrix_CB_LRI_III_RFP_A00001.xlsx XLSX spreadsheet
Amendment A00002 - 70Z02322R93250001 - SF30_A00002.pdf PDF
Amendment A00001 - 70Z02322R93250001 - SF1449_A00001.pdf PDF
Amendment A00001 - Attachment_8_Solicitation_Provisions_CB-LRI III_RFP_A00001.pdf PDF
Amendment A00001 - Attachment_7_Questions_and_Clarifications_Form_CB-LRI III_RFP_A00001.pdf PDF
Amendment A00001 - 70Z02322R93250001 - SF30_A00001.pdf PDF
Amendment A00001 - Attachment_7_Questions_and_Clarifications_Narrative_CB-LRI III_RFP_A00001.pdf PDF
Attachment_6_USCG_Safe_Operating_Envelope_Full-Scale_Trials_Results_July_2016_-_Final_RFP.pdf PDF
Attachment_4_Compliance_Matrix_CB-LRI III_RFP.xlsx XLSX spreadsheet
Attachment_1_Specification_CB-LRI III_RFP.pdf PDF
Attachment_7_Questions_and_Clarifications_Form_CB-LRI III_RFP.xlsx XLSX spreadsheet
RFP_70Z02322R93250001.pdf PDF
Attachment_3_Pricing_Worksheet_CB-LRI III_RFP.xlsx XLSX spreadsheet
Attachment_2_GFI_RFP.zip ZIP file
Attachment_5_Past_Performance_Questionnaire_CB-LRI III_RFP.pdf PDF
Attachment_8_Solicitation_Provisions_CB-LRI III_RFP.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&Rs

Responses
#ReferenceQuestionResponse
1200-1.6
241-1.2200-1.6 states that the "The marine diesel engine shall be capable of operating continuously at rated power and speed without adverse effects on engine performance and warranty…"

241-1.2 states that "The marine reverse/reduction gears shall be rated continuous duty at the diesel engines rated power and speed."

Both of these requirements result in engines and transmissions that are bigger and heavier than typical for a vessel of this size, speed, and operational requirements.

There is no viable continuously rated engine and transmission within the weight and horsepower range required.

Based on operating hours alone, a pleasure or light duty rating would meet the requirements. Please advise if either of these are acceptable for this application. Section 051-9 updated to provide clarification on the propulsion system operating profile.

Section 200-1.5 and 1.6 updated to remove the continuous operation language and provide mission profile descriptions.

Section 241-1.2 updated to remove the continuous operation language and provide mission profile descriptions.

2241-1.3We, and most likely other bidders, are still waiting for technical and pricing information from a suppliers including a particular waterjet supplier. In addition, the Coast Guards response to the question above may affect our approach to satisfy the requirements.
For these reasons, we respectfully request a 2-week extension to resolve these issues.The proposal due date is not being extended. The clarifications on duty cycle are considered minor.

&"Times New Roman,Regular"&12USCG Cutter – Boat Long Range Interceptor (CB‐LRI III) &"Times New Roman,Regular"&12Questions and Clarifications &"Times New Roman,Regular"&12 70Z02322R93250001

&P of &N

File details come from the government source that posted it. Updated .