Attachment_3_Pricing_Worksheet_CB-LRI III_RFP.xlsx

XLSX spreadsheet 38 KB Posted

Attached to
Long Range Interceptor Cutter Boat, 3rd Generation (LRI III)
Solicitation number
70Z02322R93250001
Issued by

About this file

This document contains a pricing worksheet and evaluation worksheet for a federal solicitation. The United States Coast Guard is seeking to award an indefinite-delivery/indefinite-quantity contract for up to 17 Long Range Interceptor Cutters (LRI III) over five one-year ordering periods. The solicitation includes line items for the cutter boats, trailers, shipping, familiarization services, technical data, insurance stock, models, and ballistic panels. Pricing is provided for the base year and four option years. The evaluation worksheet calculates total prices based on unit prices and estimated ordering quantities to determine a maximum contract value of $475,000 over the five-year period.

View the file

Other files

File Type Posted
Amendment A00005 - Attachment_9_Questions_and_Clarifications_Form_CB-LRI III_RFP_A00005.xlsx XLSX spreadsheet
Amendment A00005 - 70Z02322R93250001 - SF30_A00005.pdf PDF
Amendment A00005 - Attachment_4_Compliance_Matrix_CB_LRI_III_RFP_A00005.xlsx XLSX spreadsheet
Attachment_1_CB_LRI_III_Spec_Rev_A00004.pdf PDF
Amendment A00004 - 70Z02322R93250001 - SF30_A00004.pdf PDF
Amendment A00004 - Attachment_9_Questions_and_Clarifications_Form_CB-LRI III_RFP_A00004-11-18-2022.pdf PDF
Amendment A00003 - SF1449_70Z02322R93250001_A00003.pdf PDF
Amendment A00003 - 70Z02322R93250001 - SF30_A00003.pdf PDF
Amendment A00003 - Attachment_8_Solicitation_Provisions_CB-LRI III_RFP_A00003.pdf PDF
Attachment_7_Questions_and_Clarifications_Form_CB-LRI III_RFP - Phase 2.pdf PDF
Attachment_1_Specification_CB_LRI_III_A00001.pdf PDF
Attachment_4_Compliance_Matrix_CB_LRI_III_RFP_A00001.xlsx XLSX spreadsheet
Amendment A00002 - 70Z02322R93250001 - SF30_A00002.pdf PDF
Amendment A00001 - 70Z02322R93250001 - SF1449_A00001.pdf PDF
Amendment A00001 - Attachment_8_Solicitation_Provisions_CB-LRI III_RFP_A00001.pdf PDF
Amendment A00001 - Attachment_7_Questions_and_Clarifications_Form_CB-LRI III_RFP_A00001.pdf PDF
Amendment A00001 - 70Z02322R93250001 - SF30_A00001.pdf PDF
Amendment A00001 - Attachment_7_Questions_and_Clarifications_Narrative_CB-LRI III_RFP_A00001.pdf PDF
Attachment_6_USCG_Safe_Operating_Envelope_Full-Scale_Trials_Results_July_2016_-_Final_RFP.pdf PDF
Attachment_4_Compliance_Matrix_CB-LRI III_RFP.xlsx XLSX spreadsheet
Attachment_1_Specification_CB-LRI III_RFP.pdf PDF
Attachment_7_Questions_and_Clarifications_Form_CB-LRI III_RFP.xlsx XLSX spreadsheet
RFP_70Z02322R93250001.pdf PDF
Attachment_2_GFI_RFP.zip ZIP file
Attachment_5_Past_Performance_Questionnaire_CB-LRI III_RFP.pdf PDF
Attachment_8_Solicitation_Provisions_CB-LRI III_RFP.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions The Pricing Worksheet shall be completed with unit prices, rates, and the Offeror's name. The Offeror is to only input prices in the "Pricing Worksheet" tab of the Excel file. All other calculations are embedded as formulas in the Evaluation worksheet for purposes of calculating the total evaluated price. The information inserted into Attachment 3 will be used by the Government for evaluation purposes and for purposes of inserting price information into the Schedule SF-1449.

Pricing Worksheet Tab Instructions
Pricing Worksheet Tab: The pricing worksheet tab is for an Offeror’s input of unit prices for each Contract Line Item Number (CLIN) for each ordering period. The unit prices entered will be utilized to evaluate prices in the evaluation worksheet tab and the overall contract value and will be incorporated into the SF-1449 upon award by the Government.
Evaluation Worksheet Tab Instructions
Evaluation Worksheet Tab: The evaluation worksheet tab utilizes unit prices inserted by Offerors in the pricing worksheet tab. The evaluation worksheet displays the estimated ordering quantity for each ordering period. It also provides a unit price based on the inputs from the pricing worksheet tab. The evaluation worksheet calculates the total amount per CLIN and then a total evaluated price. This allows the USCG to evaluate pricing based on what the USCG anticipates ordering. This value will establish maximum contract value and this information will be inserted, by the USCG, into the SF-1449 upon award.
For the CLIN X014 series, a USCG provided ceiling amount is utilized for anticipated materials and subcontracts cost associated with logistic support needs. This amount is used for evaluation purposes only and will be applied to the overall contracting value. Loading rate percentages will be added to the USCG provided ceiling amount. CLIN X014 series also has labor rates, which will be evaluated and applied to the overall CLIN value and the total contract value. Please note: The loading rate percentages will be added to the USCG provided ceiling amounts for anticipated materials and subcontract costs.
RFP No. 70Z02322R93250001CB-LRI III Pricing Worksheet
InstructionsAttachment 3

Pricing Worksheet

{Enter Offeror Name}Contract Year Ordered
CLIN No.Activity/ActionUnitBase1234
X001CB-LRI III.
[IAW SPEC less items priced separately below]EA
X002Trailer and Trailer Equipment.
[SPEC: 910-1]EA
X003Boat Shipping-Includes boat, trailer and all associated outfit/parts.

[SPEC: 084-3]

X003AACONUSJB
X003ABHawaiiJB
X004Trailer Shipping-Independent shipment of trailer without boat.

[SPEC: 084-3]

X004AACONUSJB
X004ABHawaiiJB
X005Boat Familiarization CONUS.
[SPEC: 089-1]JB
X006Boat Familiarization Hawaii.
[SPEC: 089-1]JB
X007System Insurance Stock. FOB CONUS.

[SPEC: 083-6]

X007AAEngineEA
X007ABJet DriveEA
X007ACFenderingEA
X008Logistics Conference.
[SPEC: 080-1, 083, 085, 086]EA
X009Tech Data before Open Hull Inspection (TDP 1).
[SPEC: 068-1.3, 073-1.3, 083-3, 085-7, 096-3, 660-1.2]EA
X010Tech Data with First Delivery Order (TDP 2).
[SPEC: 083-4, 085-3, 086-3, 092-3, 097]EA
X011Tech Data with Second Delivery Order (TDP 3).

[SPEC: 041-2, 041-4.8, 083-4, 085-2, 085-3, 085-7, 086-3, 086-6, 096-3]

X011AAInitialEA
X011ABFinalEA
X012Replica Model.
[SPEC: 098]EA
X013Ballistic Panels. [SPEC: 164]EA
X014Materials and Subcontracts. Loading Rate (%) : All inclusive loading rate to be added to materials and subcontracts. Materials and Subcontracts will be negotiated at time of order/modification.
[SPEC: 080-2]%
Composite Labor Rate Engineering: In accordance with "Composite Labor Rate" in FAR 52.212-4, amended, Terms and Conditions 8.
[SPEC: 080-2]HR
Composite Labor Rate Non-Engineering: In accordance with "Composite Labor Rate" in FAR 52.212-4, amended, Terms and Conditions 8.
[SPEC: 080-2]HR
Travel for Item X014 - Reimbursable at Cost IAW FAR 31.205-46.
[SPEC: 080-2]Total Specified by the Government

RFP No. 70Z02322R93250001 LRI III Pricing Worksheet Attachment X

Evaluation Worksheet

{Enter Offeror Name}
Five (5) One-Year Ordering Periods
Base Year IDIQ Pricing
CLINDescriptionUnitQtyUnit PriceTotal
0001CB-LRI III [IAW SPEC less items priced separately below]EA2$0.00$0.00
0002Trailer & Trailer Equipment [SPEC: 910-1]EA2$0.00$0.00
0003AABoat Shipping (CONUS) [SPEC: 084-3]JB2$0.00$0.00
0005Boat Familiarization CONUS [SPEC: 089-1]JB2$0.00$0.00
0008Logistics Conference [SPEC: 080-1, 083, 085, 086]EA1$0.00$0.00
0009Tech Data before Open Hull Inspection (TDP 1) [SPEC: 068-1.3, 073-1.3, 083-3, 085-7, 096-3, 660-1.2]EA1$0.00$0.00
0010Tech Data with First Delivery Order (TDP 2) [SPEC: 083-4, 085-3, 086-3, 092-3, 097]EA1$0.00$0.00
0014Rates for Orders Requiring a Proposal$105,000.00
Materials and Subcontracts. Loading Rate (%) : All inclusive loading rate to be added to materials and subcontracts. Materials and Subcontracts will be negotiated at time of order/modification.
[SPEC: 080-2]$$100,000.00100%
Composite Labor Rate Engineering: In accordance with "Composite Labor Rate" in FAR 52.212-4, amended, Terms and Conditions 8.
[SPEC: 080-2]Hr120$0.00
Composite Labor Rate Non-Engineering: In accordance with "Composite Labor Rate" in FAR 52.212-4, amended, Terms and Conditions 8.
[SPEC: 080-2]Hr120$0.00
Travel for Item X014 - Reimbursable at Cost IAW FAR 31.205-46.
[SPEC: 080-2]$$5,000.00
Year 1 IDIQ Pricing
CLINDescriptionUnitQtyUnit PriceTotal
1001CB-LRI III [IAW SPEC less items priced separately below]EA5$0.00$0.00
1002Trailer & Trailer Equipment [SPEC: 910-1]EA5$0.00$0.00
1003AABoat Shipping (CONUS) [SPEC: 084-3]JB5$0.00$0.00
1003ABBoat Shipping Hawaii
[SPEC: 084-3]JB1$0.00$0.00
1004AATrailer Shipping (CONUS) [SPEC: 084-3]JB1$0.00$0.00
1004ABTrailer Shipping Hawaii
[SPEC: 084-3]JB1$0.00$0.00
1005Boat Familiarization CONUS [SPEC: 089-1]JB5$0.00$0.00
1006Boat Familiarization Hawaii
[SPEC: 089-1]JB1$0.00$0.00
1007AASystem Insurance Stock - Engine [SPEC: 083-6]EA2$0.00$0.00
1007ABSystem Insurance Stock - Jet Drive [SPEC: 083-6]EA2$0.00$0.00
1007ACSystem Insurance Stock - Fendering [SPEC: 083-6]EA1$0.00$0.00
1011AATech Data with Second Delivery Order (TDP 3) Initial [SPEC: 041-2, 041-4.8, 083-4, 085-2, 085-3, 085-7, 086-3, 086-6, 096-3]EA1$0.00$0.00
1011ABTech Data with Second Delivery Order (TDP 3) Final [SPEC: 041-2, 041-4.8, 083-4, 085-2, 085-3, 085-7, 086-3, 086-6, 096-3]EA1$0.00$0.00
1012Replica Model [SPEC: 098]EA2$0.00$0.00
1013Ballistic Panels [SPEC: 164]EA1$0.00$0.00
1014Rates for Orders Requiring a Proposal$205,000.00
Materials and Subcontracts. Loading Rate (%) : All inclusive loading rate to be added to materials and subcontracts. Materials and Subcontracts will be negotiated at time of order/modification.
[SPEC: 080-2]$$200,000.00100%
Composite Labor Rate Engineering: In accordance with "Composite Labor Rate" in FAR 52.212-4, amended, Terms and Conditions 8.
[SPEC: 080-2]Hr120$0.00
Composite Labor Rate Non-Engineering: In accordance with "Composite Labor Rate" in FAR 52.212-4, amended, Terms and Conditions 8.
[SPEC: 080-2]Hr120$0.00
Travel for Item X014 - Reimbursable at Cost IAW FAR 31.205-46.
[SPEC: 080-2]$$5,000.00
Year 2 IDIQ Pricing
CLINDescriptionUnitQtyUnit PriceTotal
2001CB-LRI III [IAW SPEC less items priced separately below]EA5$0.00$0.00
2002Trailer & Trailer Equipment [SPEC: 910-1]EA5$0.00$0.00
2003AABoat Shipping (CONUS) [SPEC: 084-3]JB5$0.00$0.00
2003ABBoat Shipping Hawaii
[SPEC: 084-3]JB1$0.00$0.00
2004AATrailer Shipping (CONUS) [SPEC: 084-3]JB1$0.00$0.00
2004ABTrailer Shipping Hawaii
[SPEC: 084-3]JB1$0.00$0.00
2005Boat Familiarization CONUS [SPEC: 089-1]JB5$0.00$0.00
2006Boat Familiarization Hawaii
[SPEC: 089-1]JB1$0.00$0.00
2007AASystem Insurance Stock - Engine [SPEC: 083-6]EA4$0.00$0.00
2007ABSystem Insurance Stock - Jet Drive [SPEC: 083-6]EA4$0.00$0.00
2007ACSystem Insurance Stock - Fendering [SPEC: 083-6]EA2$0.00$0.00
2012Replica Model [SPEC: 098]EA1$0.00$0.00
2013Ballistic Panels [SPEC: 164]EA1$0.00$0.00
2014Rates for Orders Requiring a Proposal$55,000.00
Materials and Subcontracts. Loading Rate (%) : All inclusive loading rate to be added to materials and subcontracts. Materials and Subcontracts will be negotiated at time of order/modification.
[SPEC: 080-2]$$50,000.00100%
Composite Labor Rate Engineering: In accordance with "Composite Labor Rate" in FAR 52.212-4, amended, Terms and Conditions 8.
[SPEC: 080-2]Hr40$0.00
Composite Labor Rate Non-Engineering: In accordance with "Composite Labor Rate" in FAR 52.212-4, amended, Terms and Conditions 8.
[SPEC: 080-2]Hr40$0.00
Travel for Item X014 - Reimbursable at Cost IAW FAR 31.205-46.
[SPEC: 080-2]$$5,000.00
Year 3 IDIQ Pricing
CLINDescriptionUnitQtyUnit PriceTotal
3001CB-LRI III [IAW SPEC less items priced separately below]EA4$0.00$0.00
3002Trailer & Trailer Equipment [SPEC: 910-1]EA4$0.00$0.00
3003AABoat Shipping (CONUS) [SPEC: 084-3]JB2$0.00$0.00
3003ABBoat Shipping Hawaii
[SPEC: 084-3]JB2$0.00$0.00
3004AATrailer Shipping (CONUS) [SPEC: 084-3]JB1$0.00$0.00
3004ABTrailer Shipping Hawaii
[SPEC: 084-3]JB1$0.00$0.00
3005Boat Familiarization CONUS [SPEC: 089-1]JB2$0.00$0.00
3006Boat Familiarization Hawaii
[SPEC: 089-1]JB2$0.00$0.00
3007AASystem Insurance Stock - Engine [SPEC: 083-6]EA1$0.00$0.00
3007ABSystem Insurance Stock - Jet Drive [SPEC: 083-6]EA1$0.00$0.00
3007ACSystem Insurance Stock - Fendering [SPEC: 083-6]EA1$0.00$0.00
3012Replica Model [SPEC: 098]EA1$0.00$0.00
3013Ballistic Panels [SPEC: 164]EA1$0.00$0.00
3014Rates for Orders Requiring a Proposal$55,000.00
Materials and Subcontracts. Loading Rate (%) : All inclusive loading rate to be added to materials and subcontracts. Materials and Subcontracts will be negotiated at time of order/modification.
[SPEC: 080-2]$$50,000.00100%
Composite Labor Rate Engineering: In accordance with "Composite Labor Rate" in FAR 52.212-4, amended, Terms and Conditions 8.
[SPEC: 080-2]Hr40$0.00
Composite Labor Rate Non-Engineering: In accordance with "Composite Labor Rate" in FAR 52.212-4, amended, Terms and Conditions 8.
[SPEC: 080-2]Hr40$0.00
Travel for Item X014 - Reimbursable at Cost IAW FAR 31.205-46.
[SPEC: 080-2]$$5,000.00
Year 4 IDIQ Pricing
CLINDescriptionUnitQtyUnit PriceTotal
4001CB-LRI III [IAW SPEC less items priced separately below]EA1$0.00$0.00
4002Trailer & Trailer Equipment [SPEC: 910-1]EA1$0.00$0.00
4003AABoat Shipping (CONUS) [SPEC: 084-3]JB1$0.00$0.00
4003ABBoat Shipping Hawaii
[SPEC: 084-3]JB1$0.00$0.00
4004AATrailer Shipping (CONUS) [SPEC: 084-3]JB1$0.00$0.00
4004ABTrailer Shipping Hawaii
[SPEC: 084-3]JB1$0.00$0.00
4005Boat Familiarization CONUS [SPEC: 089-1]JB1$0.00$0.00
4006Boat Familiarization Hawaii
[SPEC: 089-1]JB1$0.00$0.00
4007AASystem Insurance Stock - Engine [SPEC: 083-6]EA2$0.00$0.00
4007ABSystem Insurance Stock - Jet Drive [SPEC: 083-6]EA2$0.00$0.00
4007ACSystem Insurance Stock - Fendering [SPEC: 083-6]EA2$0.00$0.00
4012Replica Model [SPEC: 098]EA1$0.00$0.00
4013Ballistic Panels [SPEC: 164]EA1$0.00$0.00
4014Rates for Orders Requiring a Proposal$55,000.00
Materials and Subcontracts. Loading Rate (%) : All inclusive loading rate to be added to materials and subcontracts. Materials and Subcontracts will be negotiated at time of order/modification.
[SPEC: 080-2]$$50,000.00100%
Composite Labor Rate Engineering: In accordance with "Composite Labor Rate" in FAR 52.212-4, amended, Terms and Conditions 8.
[SPEC: 080-2]Hr40$0.00
Composite Labor Rate Non-Engineering: In accordance with "Composite Labor Rate" in FAR 52.212-4, amended, Terms and Conditions 8.
[SPEC: 080-2]Hr40$0.00
Travel for Item X014 - Reimbursable at Cost IAW FAR 31.205-46.
[SPEC: 080-2]$$5,000.00

Total Evaluated Price - Five (5) One-Year Ordering Periods $475,000.00

RFP No. 70Z02322R93250001 LRI III Pricing Worksheet Attachment X

File details come from the government source that posted it. Updated .