Amendment 02 Questions.pdf
PDF 86 KB Posted
- Attached to
- Boiler Inspection and Repairs
- Solicitation number
- 70LCHE26QPFB00004
About this file
This is a Questions and Answers (Q&A) document for federal contract opportunity 70LCHE26QPFB00004, Amendment 01, addressing boiler inspection and repair services at a Federal Law Enforcement Training Centers (FLETC) facility.
The solicitation requires inspection, troubleshooting, diagnostics, and calibration of thirteen boilers across ten buildings, along with gas sensor calibration and Building Automation System (BAS) integration verification. The baseline CLIN 0001 is firm-fixed-price covering only inspection, testing, diagnostics, BAS integration, and a priced deficiency report; actual repairs will be funded separately through a secondary Not-to-Exceed CLIN. The boiler water chemical treatment requirement is limited to testing and analyzing existing chemistry only, not supplying or administering treatment chemicals. Technical personnel must have a minimum of 10 years' experience. The Period of Performance for CLIN 0001 is 60 calendar days from Notice to Proceed, with the delivery order serving as the formal NTP. Gas sensors requiring calibration are MSA Ultima X5000 units, to be calibrated per manufacturer instructions. The BAS is Automated Logic WebCTRL utilizing BACnet communication protocol, with FLETC providing onsite personnel for system access and communication verification. The site visit scheduled for September 4, 2026 is not mandatory, and authorized subcontractors or technical representatives may attend on behalf of prime contractors. Quote submissions should clearly identify technical information and pricing with no specific government form required. This is a new requirement with no incumbent contractor. Detailed boiler technical specifications (manufacturer, model number, heating capacity, fuel type, and design pressure) are provided in an attached sheet referenced in response 1A.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Visit Sign in sheet.pdf | ||
| Amendment 04 Site Visit Questions.pdf | ||
| Amendment 03 Questions.pdf | ||
| 26OCH9006-1 SOW Boilers Revised.pdf | ||
| Boiler Inventory 9-2-2026.pdf | ||
| 26OCH9006-1 SOW Boilers.pdf | ||
| Boiler RFQ.pdf | ||
| Wage Determination 15-4281.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
70LCHE26QPFB00004 AMENDMENT 01
1. Boiler Technical Specifications: The SOW and RFQ identify a total of thirteen
(13) boilers located across ten (10) buildings. However, the specific technical data for these units is not identified. Could the Government provide the manufacturer, model number, heating capacity (MBH/HP), fuel type (e.g., natural gas, propane, or dual-fuel), and design pressure for each of the thirteen boilers? This information is critical for our technical approach under Technical Factor 1 and to ensure appropriate safety relief valve testing procedures.
1A. SEE ATTACHED SHEET.
2. Building Automation System (BAS) Integration: SOW Execution states that the contractor shall "ensure that the boilers and gas sensors are communicating properly with the Building Automation System (BAS)". To ensure compatibility and estimate controls programming labor accurately, could the Government identify the BAS manufacturer, system platform (e.g., Johnson Controls, Honeywell, Siemens, Tridium Niagara), and the communication protocol utilized (e.g., BACnet, Modbus)? Additionally, please clarify if the Government or a separate controls contractor will provide system access and necessary licensing to perform this integration.
2A. Automated Logic WebCTRL, Service provider Albireo Energy, BACnet.
3. Clarification of SOW Section 5 "Workout Stations" Clause: SOW Section 5 (page
2) contains the following instruction: "Contractor Project Manager and Site Superintendent shall meet with the FLETC Project Manager within 3 days of receiving RFP to walk the proposed path to measure and mark the locations of workout stations." As this solicitation is for "Boiler Inspection and Repairs", this clause appears to be a clerical error from an unrelated scope of work. Please clarify if this on-site path-marking for "workout stations" is a requirement under this contract, or if it should be disregarded.
3A. This is a clerical error and is not required (removed from SOW).
4. Pricing Boundary for Deficiencies and Repairs: RFQ Section 4.2 requires the contractor to provide "a detailed assessment checklist noting all deficiencies" and "a line-item cost estimate to correct any identified deficiencies." SOW Execution also states that "Required repairs shall be approved and scheduled through the Contracting O icer (CO) or the Contracting O icers Representative (COR)." To ensure equitable bidding, please confirm that the firm-fixed-price (FFP) for CLIN 0001 covers only the inspection, troubleshooting diagnostics, gas sensor calibration, BAS integration, and the subsequent priced deficiency report, and that the actual execution of any repair work will be funded separately via a contract modification or separate task order.
4A. Any subsequent repairs will be made/completed/paid out from a secondary CLIN with a Not to Exceed amount.
5. Scope of Boiler Water "Chemical Treatment": RFQ Section 4.2 lists "Boiler Inspection and Chemical Treatment" as a minimum coverage item. Please clarify if this requirement is limited to testing and analyzing the existing boiler water chemistry to report recommendations in our assessment checklist, or if the contractor is expected to supply and administer water treatment chemicals, flush the systems, and re-dose the boilers under the baseline CLIN 0001 FFP scope.
5A. Test and Analyze water chemistry only.
6. Period of Performance (Notice to Proceed vs. Award Date): RFQ Section 4.3 indicates the Period of Performance for CLIN 0001 is "Notice to Proceed + 60 calendar days". However, Section 5.0 states that a "Project Schedule must be submitted to the FLETC Project Manager within five (5) days of the delivery order issuance." Please clarify whether the issuance of the delivery order serves as the formal Notice to Proceed (NTP), or if a separate NTP will be issued at a later date, triggering the 60-day performance window.
6A. The delivery order will act as NTP.
7. Quote Submission Requirements: Please confirm the exact documents required for quote submission. Should the technical and price portions be submitted as separate attachments by email, and is a completed SF 1449 or other Government pricing form required?
7A. This is up to the submitting contractor. As long as the technical information is easily found/highlighted and the price is identifiable then it would be deemed acceptable. No o icially pricing form is required.
8. Site Visit Attendance: Is attendance at the September 4, 2026 site visit mandatory for an o eror to be eligible for award? Additionally, may an authorized subcontractor or technical representative attend the site visit on behalf of the prime contractor?
8A. The site visit is not mandatory. Subcontractors or technical reps can attend for prime contractors.
9. Experience Requirement: The RFQ states that a “10 Year minimum experience would be acceptable.” Please clarify whether this is a mandatory minimum requirement and whether the 10 years applies to the bidding company, the individual technicians performing the work, or either.
9A. The 10 year experience is the minimum requirement for the technicians performing the work.
10. BAS Access: Amendment 01 identifies the Building Automation System as Automated Logic WebCTRL using BACnet. Will FLETC provide the contractor with the necessary system access, credentials, and coordination required to verify communications, or should the contractor include any third-party BAS access or support costs in its CLIN 0001 price?
10A. FLETC has onsite personnel to access the BAS and assist with communication verification.
11. Gas Sensors: Could the Government provide the manufacturer, model, quantity, and locations of the gas sensors requiring calibration, as well as any required calibration standards or tolerances?
11A. MSA Ultima X5000 perform span calibration in accordance to manufactures instructions.
12. Repair CLIN: Please confirm that the initial quote should include pricing only for the inspection, troubleshooting, testing, and calibration work under CLIN 0001, with identified repairs to be separately authorized under the secondary Not-to- Exceed CLIN. Will the NTE amount or any repair labor/material rates be established or evaluated as part of the initial award?
12A. Quotes should only have CLIN 0001 priced for the inspection, troubleshooting, testing, and calibration. Any repairs that are recommended have the possibility to be funded from the NTE CLIN, and will be priced/evaluated at that time.
13. Previous Requirement: If this requirement has been performed previously, could the Government provide the prior contract or purchase order number, incumbent contractor name, and approximate prior award value, if available?
13A. This is a new requirement and does not have an incumbent.
File details come from the government source that posted it. Updated .