Goverment Answers Q_As FEMA Plastic Sheeting updated 2.14.20.pdf

PDF 109 KB Posted

Attached to
Plastic Sheeting
Solicitation number
70FB7019R00000025
Issued by

View the file

Other files

File Type Posted
Amendment 00002 Signed.pdf PDF
Goverment Answers Q_As FEMA Plastic Sheeting updated 2.14.20.xlsx XLSX spreadsheet
CLIN Pricing Sheet - Attachment 2 Updated.xlsx XLSX spreadsheet
Amendment 00001 Signed.pdf PDF
Goverment Answers Q_As FEMA Plastic Sheeting.xlsx XLSX spreadsheet
RFP 70FB7019R00000025 v3.pdf PDF
SOW - Attachment 1.pdf PDF
QA Template.xlsx XLSX spreadsheet
CLIN Pricing Sheet - Attachment 2.xlsx XLSX spreadsheet
RFP 70FB7019R00000025 v2.pdf PDF
Past Performance - Attachment 3.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question Number Page Number Questions FEMA Response

Page Number 44 RFP The Government seeks 40,000 units every 30 days. Does the Government realize that for the first shipment there is a 2 week ramp-up period before any rolls can be produced? After that there is continuous supply of 25,000 rolls available every 30 days. The initial ramp-up period of 2 weeks would require contractors to hold 21,000 rolls of inventory against a guranteed minimum of $5,000.

Based on the Request for Information (RFI) and Market Research, it was determine that the industry can meet FEMA requirement.

Page Number 44

RFP

Would the Government reduce the 30 day quantity to 25,000 rolls?

Based on the Request for Information (RFI) and Market Research, it was determine that the industry can meet FEMA requirement.

Page Number 44

RFP

Would the Government allow for a 2 week ramp-up period when the first order is placed each hurricane without invoking the $5 per day liquidated damages clause?

FAR 52.211-11 Liquidated Damages only applies if the vendor cannot meet it's requirements within the Delivery Period stated in the Delivery Order.

Plastic Sheeting Questions and Answer Sheet

Page Number 44

RFP

If contractor is required to inventory rolls, would FEMA advise how many rolls it currently has in its own inventory so the contractor can make the determination if contractor inventory is likely to be purchased within 5 years?

Contractor will only inventory rolls if FEMA utilize the Vendor Management Inventory.

FEMA current inventory is not at full capability. FEMA cannot estimate that the current contractor inventory will not be purchased within the 5 years.

Page Number 44

RFP

Requirement to deliver 6,000 units within 10 days. Will the Government agree to pay for this inventory in advance and the contractor will store for FEMA for future delivery? With a guaranteed minimum of $5,000 and the investment required to hold 6,000 rolls, it is difficult for any contractor to inventory 6,000 rolls that might never sell

This requirement will not utilize advance payments to contractors. Based on the Request for Information and Market Research, it was determine that the industry can meet FEMA requirement.

Page Number 44

RFP

Does the Government relalize that with the wording of the current draft, the contractor would be required to inventory 21,000 rolls of plastic sheeting or be subject to $5 per day, per roll, in liquidated damages if the 6,000 rolls and the 40,000 rolls are ordered together. This could amount to millions of dollars in damages if 21,000 rolls are not held in contractor inventory against a guaranteed minimum of $5,000.

Contractor will only inventory rolls if FEMA utilize the Vendor Management Inventory.

Page Number 44

RFP

Would the Government change the guaranteed minimum to 30,000 rolls for the contract?

The Governments minimum will remain at 72 individual units.

Page Number 24

RFP

Will the Government explain excusable delays where liquidated damages would not be charged?

FAR 52. 211-11(c) explains that contractor will not be charged if the delay are caused by (1) acts of God or of the public enemy,

(2) acts of the government in either its sovereign or contractual capacity, (3) fires,

(4) floods, (5) epidemics, (6) quarantine restrictions, (7) strikes, (8) freight embargoes, and (9) unusually severe weather. In each instance, the failure to perform must be beyond the control and without the fault or negligence of the Contractor. Default includes failure to make progress in the work so as to endanger performance.

Page Number 9

(SOW)

The SOW contains a clause to potentially prepurchase plastic sheeting.. Depending on the quantity pre-purchased, this could easily exceed what a contractor could store.. The solution would be for the contractor to store the rolls at a licensed, bonded 3rd party facility.. There would be a monthly charge for the storage from the facility. Suggestion is to add a provision to the contract adding the ability for the Government to pay for monthly storage of prepurchased rolls of plastic sheeting. The suggested method would be a monthly charge for each pallet.

FEMA will utilize the Vendor Management Inventory CLIN to prepurchase plastic sheeting.

The plastic Sheeting would be purchase with FEMA paying the storage fee through the VMI

CLIN.

how might we be able to see a sample roll? We can purchase a roll, we can have a roll sent to us and returned to FEMA warehouses, or if there might be a local warehouse, we might even be able to personally just visit the warehouse.

Being able to see a currently used and accepted roll may be imperative for ultimate clarification on lists of matters, and allow us to properly respond to this solicitation.

FEMA do not supply samples to the vendor. FEMA expect the vendor to work with the manufacturer to get the right specs of the Plastic Sheeting.

FEMA is requesting the sample roll for evaluation purpose to make sure the vendor can meet the specs located within the RFP. The roll must meet the specs within the RFP Statement of Work on page 3.

SOW

general/p.3&4 can you please clearly confirm material of sheeting, and specifications? (polyethylene, 20”x100”x[thickness]; simple sheeting, or custom/embossed/’reinforced’?). If the sheeting is low density polyethylene, and the thickness is supposed to be 10mil as per the spec sheet, then the weight would be 96lbs; however, the same spec sheet says that rolls shall not exceed 70lbs (and the required pallet weights match the ~70lbs/roll average).

Specification are located within Table 1 of the Statement of Work. Pallet weight will be no more than 2000lbs total weight.

see p. 8/9 is the price based on this contract, or based upon later issued ‘rfps’? (as discussed in ‘delivery order process’, p.8/9)

Price is based on the pricing establshed at the IDIQ level

SOW

Pricing/frieght breakdown.

General: some information starting on p.5 we do not fully understand the freight requirements, and how to break down pricing.

Please clarify. (we can determine a price for the sheeting, and incorporate freight quotes for shipment to each individual location listed, but not entirely sure what else is being requested based on the SOW and price sheet alone).

FEMA previously had a single solicitation destined for PR (last year?), and we recall that shipping was not an option (as no carriers were going into the affected areas); are we supposed set up direct shipments in such situations, are is FEMA handling this? We have not yet directly supplied, so are not yet educated as to your procedures and expectations.

Freight is based on the 87,450 which is equal to 130 drop trailers. The cost should be based on sending the plastic sheeting to the locations listed in the solicitation. Delivery location wiill be at the delivery order level. FEMA is expecting the vendor to set up shipping to the location identified in the delivery order.

might you have pricing from previous contracts, and/or recent actually paid pricing for these rolls? (or how/where to obtain such information)

This information must be requested through the Freedom of Information Act (FOIA) process.

SOW see p. 4 the solicitation briefly mentions ‘prepaid product’. Having ‘6000 rolls’ available for delivery within 10 days may clearly require product to be prerun and sitting on the floor of shipping indefinitely. We can consider housing product for potential release, but would this product all be prepaid? We cannot run product if it will never be purchased and eventually sent to scrap.

The 6000 rolls only applies to the Vendor Management. If the Vendor decide to place a bid VMI, then the government expects the vendor to have the rolls ready for shipping.

Section E - Solicitation

Provisions - page

The “Volume I” section (and “Factor 1” section) state Offerors must complete the “Technical Capability Checklist (Attachment 2) and submit with their Technical Proposal. However, Attachment 2 in the beta.SAM.gov listing is the “CLIN Pricing Sheet” and it does not list a Technical Capability Checklist. Should we create a “Technical Capability Checklist” from the information referenced in the RFP pages 51 through 53?

The technical capability is with the RFP. Vendors are to submit their company's technical capability checklist with the Volume 1 Technical approach.

Volume 2 is Pricing.

Section E - Solicitation

Provisions - page

The “Volume II” section states Offerors must complete Worksheet I and Worksheet II in “Attachment 3-Price Spreadsheet”. However, Attachment 3 in the beta.SAM.gov listing is the “Past Performance Attachment”. Is it correct to assume that Offerors should instead complete “CLIN Pricing Sheet - Attachment 2” included on beta,SAM.gov?

Yes, Attchment 2 is the price spreadsheet that must be completed and return for evaluation.

Section E - Solicitation

Provisions - page

The “Factor 3- Past Performance” section lists information to be provided for each referenced contract and the same section on page 53 states that Offerors will be evaluated based on the information received from the Attachment 3 Past Performance Questionnaire. Is it correct to assume that an Offeror should request that referenced accounts send their completed questionnaire directly to the Contracting Officer or Contracting Officer without copying the Offeror? (If correct, Offerors will not have visibility to whether all reference accounts have completed the questionnaire.)

You are correct, OCPO will not share questionaire with offerors.

Pricing sheet 5 Year IDIQ Estimate worksheet

Can we provide a different freight per delivery (CLIN 0002) price for CONUS and OCONUS locations? Is yes, should we note the different prices below the active cells?

No change in the frieght per delivery price. Offerors are to complete the worksheet as is.

Pricing sheet 5 Year IDIQ Estimate worksheet

The formulas for Year 2 through Year 5 include a multiplier in cell G27 that appears to allow for an annual price increase. Should we assume that there is no price increase in years 2 - 5 and/or propose an annual price change? (Note:

the “Minimum Order” worksheet includes a 3% multiplier in cell G9.)

Please used the updated worksheet.

Pricing sheet 5 Year IDIQ Estimate worksheet

“Freight - per delivery” (CLIN 0002) shows the quantity “130”. Is 6this the assumed number of truckloads to transport the 87,450 sheets indicated in CLIN 0001? Note: Assuming pallets include 28 rolls per the SOW and 26 pallets single stacked (to avoid damage in transport) per 42’ truck trailer, 130 truckloads will not fulfill 87,450 sheets.

Yes . This is the assume load.

Pricing sheet 5 Year IDIQ Estimate worksheet

Should we assume that Offerors are not to complete this worksheet as it appears to be a summary across Offerors?

Please complete Attachment 2 Price CLIN Sheet. This worksheet will not be shared with other offerors.

SOW E Paragraph

With regards to CLIN Price Sheet, CLIN #0003 Drop Trailer Rate - per day; should the Contractor provide a daily rate for a trailer drop based on 130 drops a year with a detention period of 60 days per drop?

Yes

SOW I Paragraph

With regards to CLIN Price Sheet, CLIN #0004 Diversion rate- per mile; should the Contractor provide a per mile price for 150 diversions per year with a 50 mile diversion distance?

Diversion rate is based on the vendor being redirected from the original location to a location within 150 miles.

NFPA 701 Fire Retardant Testing:

Does this need to be for a ‘small scale’ (test 1) or ‘large scale’ test (test 2)?

Both testings are required

CPAI-84 Fire Retardant Testing:

Should this be testing as ‘tent wall’ or a ‘tent floor’ standard?

Both testing standards are required