About this file

This is a Cost Schedule document for contract 70CNR-S3483, a state contract for Anaconda Copper Mine Site Technical Support Services. The contract requires vendors to provide technical support services at the Anaconda Copper Mine Site, with staffing positions including Program Director/Principal, Associate or Project Manager, Senior Engineer, Senior Hydrogeologist, Project Geologist, Project Engineering, Project Draftsperson, Field Technician, and Administrative/Billing personnel. The document does not specify project duration, renewal options, response deadlines, site visit requirements, or bidder conference details.

The Cost Schedule requires vendors to propose fixed billing rates for each position that will remain in effect for the life of the contract, with all direct labor overhead multiplier built into the rates. Indirect costs are itemized separately and include travel reimbursement per current Fiscal Year State and GSA guidelines, a 5% management markup on partnering sub-contractor invoices (main contractor only), a 5% management markup on outside service sub-contractor invoices (main contractor only), equipment costs on a daily or unit basis excluding vehicle usage, and other indirect costs with detailed breakdowns. Vendors must indicate acceptance of each indirect cost category and provide supporting cost sheets where applicable.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

70CNR-S3483 - Cost Schedule Anaconda Copper Mine Site Technical Support Services Contract

Vendor Name__________________________________________________________________

A. Proposed Billing Rates Total billing rate, with direct labor overhead multiplier built in. Rates to remain in effect for the life of the contract for positions noted below:

1. Program Director/Principal

2. Associate or Project Manager

3. Senior Engineer

4. Senior Hydrogeologist

5. Project Geologist

6. Project Engineering

7. Project Draftsperson

8. Field Technician

9. Administrative/Billing

10. (Other Job Title)

11. (Other Job Title)

C. Indirect Costs – To include but not be limited to the following:

1. Travel: Reimbursement for travel, including vehicle use /mileage, reimbursed per current FY State and GSA guidelines only.
Accept:

Yes No

2. Main Contractor Only: Management mark-up of 5% requested on partnering sub-contractor invoices.
Accept:
3. Main Contractor Only: Management mark-up of 5% requested on outside service sub-contractor invoices.
Accept:
4. Equipment: Provide a list of in-house or rented equipment cost per day or unit, excluding all vehicle usage.
Cost sheet included:

5. Other Indirect Cost Request: Provide specific details as attachment including a cost breakdown per day or unit.

Cost sheet included: