7-PWO124335 Pricing Schedule.pdf

PDF 77 KB Posted

Attached to
SLCo PWO124335 Boring for Traffic Signal Construction
Solicitation number
SLCo PWO124335 Boring for Traffic Signal Construction
Issued by
Salt Lake County, Utah

About this file

This is a Pricing Schedule for a Base Bid submitted to Salt Lake County Public Works Operations Division for directional boring and drilling services related to traffic signal construction throughout Salt Lake County, Utah. The contract encompasses directional boring work in both normal and rocky soil conditions, with 25 line items covering various configurations of conduit sizes (2-inch, 3-inch, and 4-inch) and boring lengths (0-150 feet and over 150 feet). Quantities listed are for bidding purposes only, with actual quantities to be determined for each specific project site. The pricing schedule indicates a virtual pre-bid meeting was scheduled for December 10th at 11:00am, with interested bidders directed to contact Aaron Stone at astone@saltlakecounty.gov for meeting details. Bids will be awarded based on the Base Bid Schedule total to responsive and responsible bidders meeting qualifications, with the County reserving the right to award multiple contracts to bidders offering the lowest overall cost.

Unit prices submitted must remain firm for the initial 12 months of the contract. The pricing schedule includes line items for directional boring in normal soil (items 1-11), directional boring in rocky soil (items 12-22), and ancillary services including Vactor Truck hourly rates, attempt fees, and site walk fees (items 23-25). All unit price and amount fields are blank in the submitted document, indicating this is a template awaiting bidder completion. No specific contract term duration, renewal options, set-asides, incumbent information, or funding sources are detailed in this pricing schedule document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PWO124335

BASE BID SCHEULE

A. Bid item quantities are for bidding purposes only. Actual quantities will be determined for each specific site. Additional bid items, which are not listed on this bid sheet, may be added for each specific project if deemed necessary by the Project Manager.

B. Bids will be awarded based on the Base Bid Schedule total.

C. Number of Schedules in Base Bid: one.

EXHIBIT 1. BASE BID SCHEDULE

Item Specification Reference Number Classification of Work

Quantity Unit

Unit Price Amount

33 05 23.35 Directional boring - Normal soil 1 – two-inch (2”) conduit, Length: 0 - 150 feet*

Lineal Feet $ $

33 05 23.35 Directional boring - Normal soil 1 – two-inch (2”) conduit, Length: over 150 feet*

Lineal Feet $ $

33 05 23.35 Directional boring - Normal soil 2 – two-inch (2”) conduit, Length: 0 - 150 feet*

Lineal Feet $ $

33 05 23.35 Directional boring - Normal soil 2 – two-inch (2”) conduit, Length: over 150 feet*

Lineal Feet $ $

33 05 23.35 Directional boring - Normal soil 4 – two-inch (2”) conduit, Length: 0 - 150 feet*

Lineal Feet $ $

33 05 23.35 Directional boring - Normal soil 4 – two-inch (2”) conduit, Length: over 150 feet*

Lineal Feet $ $

33 05 23.35 Directional boring - Normal soil 6 – two-inch (2”) conduit, Length: 0 - 150 feet*

Lineal Feet $ $

33 05 23.35 Directional boring - Normal soil 6 – two-inch (2”) conduit, Length: over 150 feet*

Lineal Feet $ $

Pricing Schedule

Item Specification Reference Number Classification of Work

Quantity Unit

Unit Price Amount

33 05 23.35 Directional boring - Normal soil 1 – three-inch (3”) conduit, Length: 0 - 150 feet*

Lineal Feet $ $

33 05 23.35 Directional boring - Normal soil 1 – three-inch (3”) conduit, Length: over 150 feet*

Lineal Feet $ $

33 05 23.35 Directional boring - Normal soil 1 – four-inch (4”) conduit, Length: over 150 feet*

Lineal Feet $ $

33 05 23.35 Directional boring – Rocky soil 1 – two-inch (2”) conduit, Length: 0 - 150 feet*

Lineal Feet $ $

33 05 23.35 Directional boring – Rocky soil 1 – two-inch (2”) conduit, Length: over 150 feet*

Lineal Feet $ $

33 05 23.35 Directional boring – Rocky soil 2 – two-inch (2”) conduit, Length: 0 - 150 feet*

Lineal Feet $ $

33 05 23.35 Directional boring – Rocky soil 2 – two-inch (2”) conduit, Length: over 150 feet*

Lineal Feet $ $

33 05 23.35 Directional boring – Rocky soil 4 – two-inch (2”) conduit, Length: 0 - 150 feet*

Lineal Feet $ $

33 05 23.35 Directional boring – Rocky soil 4 – two-inch (2”) conduit, Length: over 150 feet*

Lineal Feet $ $

33 05 23.35 Directional boring – Rocky soil 6 – two-inch (2”) conduit, Length: 0 - 150 feet*

Lineal Feet $ $

33 05 23.35 Directional boring – Rocky soil 6 – two-inch (2”) conduit, Length: over 150 feet*

Lineal Feet $ $

Item Specification Reference Number Classification of Work

Quantity Unit

Unit Price Amount

33 05 23.35 Directional boring – Rocky soil 1 – three-inch (3”) conduit, Length: 0 - 150 feet*

Lineal Feet $ $

33 05 23.35 Directional boring – Rocky soil 1 – three-inch (3”) conduit, Length: over 150 feet*

Lineal Feet $ $

33 05 23.35 Directional boring – Rocky soil 1 – four-inch (4”) conduit, Length: over 150 feet*

Lineal Feet $ $

23 Vactor Truck per Hour $ $ 24 Attempt Fee Each $ $ 25 Site Walk Each $ $

*NOTE: Unit price MUST be firm for the initial 12 months of the contract.

See section 8.0

Total Base Bid = $_____________________

EXHIBIT 1
BASE BID SCHEULE
A. Bid item quantities are for bidding purposes only. Actual quantities will be determined for each specific site. Additional bid items, which are not listed on this bid sheet, may be added for each specific project if deemed necessary by the Project...
B. Bids will be awarded based on the Base Bid Schedule total.
C. Number of Schedules in Base Bid: one.
EXHIBIT 1. BASE BID SCHEDULE
Total Base Bid = $_____________________