7-PRK23041-PRK26019 Addendum No. 1 GC Qualification.pdf

PDF 233 KB Posted

Attached to
Rose Park Golf Course Irrigation and Turf Reduction / Nibley Park Golf Course Irrigation
Solicitation number
PRK23041 / PRK26019
Issued by
Utah

About this file

This is Addendum No. 1 to a Statement of Qualifications & Interest (RFQ) issued by the City of Salt Lake City, Department of Public Services, Architecture and Construction Management Division, for the pre-qualification of general contractors on two golf course irrigation projects. The work encompasses irrigation system installation, turf reduction, settling pond construction, and pump station installation at Rose Park Golf Course and Nibley Park Golf Course in Salt Lake City, Utah. The addendum was issued on September 25, 2026, and requires acknowledgment of receipt in the cover letter of contractor submissions. Contractors may submit as joint ventures with full disclosure of all participating entities and the venture structure. The projects will be bid separately, allowing contractors to pre-qualify for one or both projects based on their bonding capacity and qualifications.

The engineer's estimates are differentiated by project, with Nibley Park estimated at $2,600,000 and Rose Park estimated at $5,900,000, totaling $8,500,000 for both projects combined. While it is preferable for contractors to demonstrate bonding capacity for both projects, pre-qualification for a single project is permitted if the contractor indicates which project they intend to pre-qualify for and provides corresponding bonding capacity. The addendum clarifies that there are no provisions restricting joint venture bids and that contractors must provide complete information for all joint venture partners within their submissions. No other changes were made to the original pre-qualification documents, contractor prequalification forms, or general information forms.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT of PUBLIC SERVICES

ERIN MENDENHALL SEAN A. FYFE, AIA

MAYOR CITY ARCHITECT

ARCHITECTURE AND CONSTRUCTION MANAGEMENT DIVISION

P.O. BOX 145506

349 S 200 EAST, STE 100 WWW.SLCGOV.COM

SALT LAKE CITY, UT 84114-5506 TEL 801-535-7116 FAX 801-535-6093

September 25, 2026

ADDENDUM NO. 1 (DOCUMENT 00 91 14)

Job Name: Rose Park Golf Course Irrigation and Turf Reduction & Nibley Park Golf Course Irrigation Contractor Pre-Qualification

Job Nos.: PRK23041 & PRK26019

Attached are copies of Addendum No. 1.

Addendum No. 1 provides changes, corrections, deletions and additions to the initial Statement of Qualifications & Interest (RFQ). In case of any conflict between the RFQ and the attached Addendum, the Addendum shall govern.

The Addendum forms a part of the Contract Documents and modifies the original RFQ documents.

Acknowledge receipt of the Addendum in the Cover Letter accompanying your submission.

The Addendum consists of this cover sheet and 2 pages of written addendum.

Sincerely, Sean A. Fyfe, AIA City Architect

SF:dw Attachment cc: Darian Westrick Matt Kammeyer Vault

Addendum No. 1 00 91 14 - 1

DOCUMENT 00 91 14

ADDENDUM No. 1

PART 1 GENERAL

1.1 DOCUMENT INCLUDES

A. Changes to the Statement of Qualifications and Interest (RFQ).

B. Responses to Bonfire Questions.

C. Additional Information.

1.2 CONSTRUCTION CONTRACT

A. Job Name: Rose Park Golf Course Irrigation and Turf Reduction & Nibley Park Golf Course Irrigation Contractor Pre-Qualification

Job No.: PRK23041 & PRK26019

PART 2 CHANGES

2.1 CHANGES TO PRIOR ADDENDA

A. N/A.

2.2 CHANGES TO DOCUMENT – SOLICIATION FOR PREQUALIFICATION OF

CONTRACTORS

A. None.

2.3. CHANGES TO DOCUMENT – CONTRACTOR PREQUALIFICATION

INFORMATION, SCOPE, AND RAKING FORM

A. None.

2.4. CHANGES TO DOCUMENT – CONTRACTOR PREQUALIFICATION AND

REFERENCE FORM

A. None.

2.5. CHANGES TO DOCUMENT – CONTRACTOR PREQUALIFCATION GENERAL

INFORMATION FORM

A. None.

2.6 RESPONSES TO BONFIRE QUESTIONS

A. Question No. 1: Are there any provisions against a Joint Venture Bid?

Answer: There are no provisions against a Joint Venture Bid. Please provide all information needed for both contractors within the submittal, as well as the structure of the Joint Venture.

Addendum No. 1 00 91 14 - 2

B. Question No. 2: Is there any separation in the engineer’s estimate per course? Or just the 8.5 for both courses combined?

Answer: Nibley Park Estimate = $2,600,000 & Rose Park Estimate = $5,900,00.

C. Question No. 3: Can a contractor prequalify for only one of the two projects (Rose Park or Nibley Park) based on sufficient bonding capacity, or do we need to demonstrate sufficient bonding capacity for both projects in order to pass the bonding portion of prequalification?

Answer: It is preferable for the contractor to have the bonding capacity to pre-qualify for both projects, but because the projects will bid separately, please note which project you intend to pre-qualify for and bonding capacity for that project.

2.7 ADDITIONAL INFORMATION

A. None.

END OF ADDENDUM