5-Rose Park Overall Irrigation Plan.pdf
PDF 1 MB Posted
- Attached to
- Rose Park Golf Course Irrigation and Turf Reduction / Nibley Park Golf Course Irrigation
- Solicitation number
- PRK23041 / PRK26019
- Issued by
- Utah
About this file
Rose Park Golf Course Irrigation and Turf Reduction Project Summary
This is an overall irrigation plan document prepared by the Salt Lake City Department of Public Lands for the Rose Park Golf Course located at 1386 North Redwood Road, Salt Lake City, Utah. The project involves the design and installation of a comprehensive irrigation system for the 18-hole golf course, including the construction of mainline and lateral irrigation infrastructure, a new pump station, settling pond, and associated electrical and control systems. The irrigation plan specifies the installation of 1,561 total sprinkler heads (1,054 full-circle nozzles and 507 part-circle nozzles), 86,570 linear feet of 2-inch HDPE lateral lines, and 25,796 linear feet of HDPE mainline piping. The system includes five Toro Lynx DEC-RSP-1000-DR smart hub controllers with 1,000-station capacity, 296 lateral control valves ranging from 2 to 16 inches, 68 quick coupler valve stations, seven combination air relief valves, and a single Watts 909RPDA 8-inch reduced pressure backflow preventer. The pump station is designed to discharge 1,900 gallons per minute at 90 psi through a 14-inch main line, with dual potable water points of connection: one from Redwood Road (6-inch, 700 gpm at 90 psi) and one from Guadalupe (8-inch, 1,000 gpm at 90 psi).
The irrigation design plan document is dated May 29, 2026, and was prepared for job number PRK23041 under the supervision of R. Jacobsen as the project designer and checker. The plan includes 100-foot buffer zones along the estimated Jordan River edge to maintain riparian compliance requirements. The system incorporates a weather station (Spectrum WatchDog 3250DU) for irrigation optimization and includes grounding grid protection with 13 Paige Wire grounding systems. Site facilities shown include the clubhouse, restroom facilities, driving range with practice tees, practice green, and pump house. The irrigation system serves multiple course areas including the driving range, practice facilities, and 18 holes with proportional coverage through the valley and foothill sections of the property. Contact for the project is Darian Westrick at the Salt Lake City Department of Public Lands (darian.westrick@slcgov.com, 801-231-8588).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
0' B
UFF
ER
ES
T.
RIVE
R ED
GE
100' BUFFER
EST. RIVER EDGE
100' BUFFER
EST. RIVER EDGE
100' BUFFER
EST. RIVER EDGE
100' BUFFER
EST. RIVER EDGE
100' BUFFER
EST. RIVER EDGE
100' BUFFEREST. RIVER EDGE
100' BUFFEREST. RIVER EDGE
100' BUFFER
EST. RIVER EDGE
100' BUFFER
EST. RIVER EDGE
CLUBHOUSE
RESTROOM
DRIVING
RANGE
DRIVING
T-BOX'S
PUMP HOUSE
RE
DW
OO
D
RO
AD
RE
DW
OO
D
RO
AD
RE
DW
OO
D
RO
AD
RE
DW
OO
D
RO
AD
JO
RD
AN
R
IVE
R
JORDAN RIVER
JO
RD
AN
R
IV
ER
JO
RD
AN
R
IVE
R
JORDAN RIVER
JORDAN RIVER
1700 NORTH
1530 NORTH
INDEPENDENCE BLVD.
1300 NORTH
ITHACA AVE
EA
RN
SH
AW
LA
NE
W
ES
T
SUNSET DRIVE
srg srg
PRACTICE
GREEN
srg
CC
WS
PD
PD
PD
srg srg srg srg
PD
WS
srg
CC
Valve Number
Valve Flow
Valve Size
Valve Callout
-25D$1�5,9(5
(D
W D �5 $D
29(5$// ,55,*$7,21
P/$10 100' 200' 400'
SCALE: 1"=200'-0"
ISSUE DATE:
CHECKED:
DRAWN:
DESIGNED BY:
PROJ #:
R. JACOBSEN
R. JACOBSEN
05.29.2026
RO
SE
P
AR
K
GO
LF
C
OU
RS
E
IR
RI
GA
TI
ON
T
UR
F
RE
DU
CT
IO
N
N
R
ED
W
OO
D
RD
, S
LC
, U
TA
H
JO
B No
. P
RK
Salt Lake City Department of Public Lands
Contact:
Darian Westrick darian.westrick@slcgov.com 801-231-8588
1965 W 500 S #2 Salt Lake City, Utah 84104
SLC JOB No. PRK23041
SHEET NAME:
SHEET NUMBER:
����D5$)7 5(9,(W
D2C80(17
127�)25 C21S758C7,21
RE
V.
DA
TE
DE
SC
RI
PT
IO
N
/5���
AutoCAD SHX Text
IR
AutoCAD SHX Text
TL
AutoCAD SHX Text
IR
AutoCAD SHX Text
TL
AutoCAD SHX Text
TL
AutoCAD SHX Text W
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
WM
AutoCAD SHX Text S
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text W
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
SDVT
AutoCAD SHX Text
SDVT
AutoCAD SHX Text
SDVT
AutoCAD SHX Text
SDVT
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text
SDVT
AutoCAD SHX Text
SDVT
AutoCAD SHX Text
SDVT
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text
PMP
AutoCAD SHX Text 10"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 10"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 10"
AutoCAD SHX Text 10"
AutoCAD SHX Text A
AutoCAD SHX Text 10"
AutoCAD SHX Text 6"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text
PUMP
AutoCAD SHX Text
6" POC
AutoCAD SHX Text
BF
AutoCAD SHX Text
8"POC
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 6"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text 10"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 8"
AutoCAD SHX Text 4"
AutoCAD SHX Text A
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 4"
AutoCAD SHX Text 10"
AutoCAD SHX Text 10"
AutoCAD SHX Text 6"
AutoCAD SHX Text 10"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 12"
AutoCAD SHX Text 16"
AutoCAD SHX Text 16"
AutoCAD SHX Text 16"
AutoCAD SHX Text 8"
AutoCAD SHX Text 6"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text A
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 10"
AutoCAD SHX Text 8"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 12"
AutoCAD SHX Text 12"
AutoCAD SHX Text 8"
AutoCAD SHX Text 12"
AutoCAD SHX Text 12"
AutoCAD SHX Text 12"
AutoCAD SHX Text 8"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text A
AutoCAD SHX Text 4"
AutoCAD SHX Text 8"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 6"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 4"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 8"
AutoCAD SHX Text 6"
AutoCAD SHX Text 10"
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
MANUFACTURER/MODEL
AutoCAD SHX Text
QTY
AutoCAD SHX Text Toro INF-54-54-8-6 *FULL CIRCLE* Nozzle: 54 25
AutoCAD SHX Text 1,054
AutoCAD SHX Text Toro INF-55-54-8-6 *PART CIRCLE* Nozzle: 54 25
AutoCAD SHX Text
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
MANUFACTURER/MODEL/DESCRIPTION
AutoCAD SHX Text
QTY
AutoCAD SHX Text Toro 1" 474-44 Acme threaded *QUICK COUPLER VALVE* One per green, Two per tee complex, Use 463-03 Key with 477-00 Hose swivel.
AutoCAD SHX Text
AutoCAD SHX Text AquaFuse AFBV0200Y-MFN0-360 2" *LATERAL VALVE* 2" IPS ball valve DR11 PE 4710/PE100 full port
AutoCAD SHX Text
AutoCAD SHX Text AquaFuse ControlFlo Ball Valve AFBVXX00Y-009 4" through 16" High Performance type 1/4 turn with bypass system. DR11 PE4710/PE100 full port
AutoCAD SHX Text
AutoCAD SHX Text Bermad C30-P 2" *COMBINATION AIR RELIEF VALVE*
AutoCAD SHX Text
AutoCAD SHX Text Watts 909RPDA 8" Reduced Pressure Backflow Preventer
AutoCAD SHX Text
AutoCAD SHX Text Toro Lynx DEC-RSP-1000-DR Smart Hub Controller with Green plastic pedestal, 1000 station, (4) 250 station channels, UHF Radio Communication.
AutoCAD SHX Text
AutoCAD SHX Text Toro Lynx DEC-RSP-1000-DR Smart Hub Controller with Green plastic pedestal, 1000 station, (4) 250 station channels, UHF Radio Communication.
AutoCAD SHX Text
AutoCAD SHX Text Toro Lynx DEC-RSP-1000-DR Smart Hub Controller with Green plastic pedestal, 1000 station, (4) 250 station channels, UHF Radio Communication.
AutoCAD SHX Text
AutoCAD SHX Text Toro Lynx DEC-RSP-1000-DR Smart Hub Controller with Green plastic pedestal, 1000 station, (4) 250 station channels, UHF Radio Communication.
AutoCAD SHX Text
AutoCAD SHX Text Toro Lynx DEC-RSP-1000-DR Smart Hub Controller with Green plastic pedestal, 1000 station, (4) 250 station channels, UHF Radio Communication.
AutoCAD SHX Text
AutoCAD SHX Text Paige Wire Grounding Grid
AutoCAD SHX Text
AutoCAD SHX Text Watertronics Pumpstation (See Civil Plans)
AutoCAD SHX Text
AutoCAD SHX Text Physical Disconnect Size per plan
AutoCAD SHX Text
AutoCAD SHX Text Spectrum WatchDog 3250DU Weatherstation Include Spectrum WatchDog Retriever, and Spectrum 3910-T Toro Interface for Toro Lynx Locate per Superintendent direction. Provide Weather station and receiver equipment to be installed by Turf Equipment. Contact Dave Jeffries, Turf Equipment Co. 801 891-1126 for all Weather station equipment
AutoCAD SHX Text
AutoCAD SHX Text Toro DEC-SG-LIN Decoder Line Surge Protector Install as many as required to meet maanufacturer's requirements. NOT ALL UNITS NECESSARY MAY BE SHOWN ON PLAN!
AutoCAD SHX Text
AutoCAD SHX Text Toro Lynx Central Control Computer
AutoCAD SHX Text
AutoCAD SHX Text 6" POTABLE REDWOOD ROAD MININIMUMS REQUIRED: 6", 700 GPM`s @ 90 PSI Dynamic. 6" RPA stepped up to 8" main
AutoCAD SHX Text
AutoCAD SHX Text GUADALUPE POTABLE POC MINIMUMS REQUIRED: 8", 1,000 GPM`s, 90 PSI. RPA stepped up to 10" Near NW corner of Guadalupe Center, 1385 N 1200 W
AutoCAD SHX Text
AutoCAD SHX Text PUMP STATION MAIN PUMP STATION: Discharrge 14", 1900 GPM, 90 PSI
AutoCAD SHX Text
AutoCAD SHX Text Irrigation Lateral Line: POWER WIRE TO CONTROLLER
AutoCAD SHX Text
472.4 lf
AutoCAD SHX Text Irrigation Lateral Line: 2" HDPE PE4710 DR 11 ROLLS ONLY
AutoCAD SHX Text 86,570 lf
AutoCAD SHX Text Irrigation Mainline: HDPE PE4710 DR 13.5
AutoCAD SHX Text 25,796 lf
AutoCAD SHX Text A
AutoCAD SHX Text
BF
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text
PMP
AutoCAD SHX Text
6" POC
AutoCAD SHX Text
8"POC
AutoCAD SHX Text
PUMP
AutoCAD SHX Text
IRRIGATION SCHEDULE
File details come from the government source that posted it. Updated .