7-MCTA Bid Breakdown PC.pdf
PDF 109 KB Posted
- Solicitation number
- Not on record
- Issued by
- Monroe County, Pennsylvania
About this file
The document is a Bid Breakdown Form for the MCTA Transit Facility Plumbing Construction project, dated August 29, 2025. Within 48 hours of the bid opening, the apparent low bidder for each Prime Contract is required to provide a detailed breakdown of their lump sum bid across multiple specification divisions. The breakdown covers a comprehensive range of construction and infrastructure elements, including general requirements, existing conditions, concrete work, wood and composite materials, thermal and moisture protection, finishes, specialties, equipment, furnishings, special construction, fire suppression, plumbing, HVAC, and earthwork.
The bid breakdown encompasses extremely detailed specification sections, with granular line items for each division and subdiscipline. Specific areas of focus include architectural wood casework, firestopping, joint sealants, acoustical ceilings, interior painting, toilet compartments, countertops, domestic water piping, sanitary sewers, compressed air piping, natural gas piping, water heaters, plumbing fixtures, emergency plumbing fixtures, radiant heaters, rooftop units, air conditioning systems, and excavation support. The document provides a structured template for bidders to itemize their costs across these various technical domains, with blank spaces for entering specific dollar amounts for each line item, culminating in a grand total for all applicable sections.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MCTA Transit Facility BID BREAKDOWN
PROJECT MANUAL 004373 - 1
August 29, 2025
SECTION 004373 - BID BREAKDOWN
1.1 BID BREAKDOWN FORM – Plumbing Construction
A. Within 48 Hours of the bid opening the apparent low bidder for each Prime Contract will be required to provide a breakdown of your firms lump sum bid according to the format listed below.
SPECIFICATION
DIVISION
DIVISION SPECIFICATION DESCRIPTION AMOUNT
DIVISION 01 GENERAL REQUIREMENTS $
DIVISION 02 EXISTING CONDITIONS $
DIVISION 03 CONCRETE $
03 30 00 – Cast In Place Concrete $
DIVISION 06 WOOD AND PLASTIC, AND COMPOSITES $
06 41 00 – Architectural Wood Casework $
DIVISION 07 THERMAL AND MOISTURE PROTECTION $
07 84 00 – Firestopping $
07 92 00 – Joint Sealants $
DIVISION 09 FINISHES $
09 51 00 – Acoustical Ceilings $
09 91 23 – Interior Painting $
DIVISION 10 SPECIALTIES $
10 21 13.19 – Plastic Toilet Compartments $
10 28 00 – Toilet, Bath & Laundry $
DIVISION 11 EQUIPMENT $
DIVISION 12 FURNISHINGS $
12 36 00 – Countertops $
PROJECT MANUAL 004373 - 2
August 29, 2025
DIVISION 13 SPECIAL CONSTRUCTION $
DIVISION 21 FIRE SUPPRESSION $
21 00 00 – General Fire Protection Provisions $
21 05 00 – Common Work Results for Fire Protection $
21 05 19 – Fire Protection Piping Specialties $
21 05 29 – Fire Protection Hangers Supports and Sleeves $
21 05 53 – Identification for Piping $
21 07 00 – Sprinklers $
21 08 00 – Commissioning of Fire Protection Systems $
21 10 00 – Fire Protection Piping $
DIVISION 22 PLUMBING (TOTAL/SUM) $
22 00 00 – General Fire Protection Provisions $
22 05 00 – Common Work Results for Plumbing $
22 05 16 – Expansion Fittings and Loops for Plumbing Piping $
22 05 19 – Meters and Gages for Plumbing Piping $
22 05 23 – Plumbing Valves $
22 05 29 – Plumbing Hangers, Supports and Sleeves $
22 05 53 – Identification for Piping, Valves and Equip-ment $
22 05 93 – Testing, Adjusting and Balancing $
22 07 00 – Plumbing Insulation $
22 11 16 – Domestic Water Piping $
22 11 19 – Domestic Water Piping Specialties $
22 11 23 – Domestic Water Pumps $
22 13 13 – Facility Sanitary Sewer $
22 13 16 – Sanitary, Waste, Vent and Storm Piping $
PROJECT MANUAL 004373 - 3
August 29, 2025
22 13 19 – Sanitary, Waste, Vent and Storm Piping Spe-cialties $
22 14 23 – Storm Drainage Piping Specialties $
22 15 13 – General-Service Compressed-Air Piping $
22 16 16 – Natural Gas Piping $
22 33 00 – Domestic Water Heaters $
22 42 00 – Plumbing Fixtures $
22 45 00 – Emergency Plumbing Fixtures $
DIVISION 23 HVAC (TOTAL/SUM) $
23 55 23.13 – Low Intensity Gas-Fired Radiant Heaters $
23 73 39 – Direct-Fired Heating and Ventilating Makeup- Air Units $
23 74 23 – Packaged Rooftop Gas Fired Units $
23 81 26 – Split-System Air-Conditioners and Heat Pumps $
DIVISION 31 EARTHWORK $
31 23 33 – Trench & Backfill $
31 50 00 – Excavation Support & Protection $
GRAND TOTAL
(FOR ALL APPLICABLE SECTIONS) $
END OF SECTION 004373
File details come from the government source that posted it. Updated .