5-MCTA Bid Breakdown GC.pdf

PDF 94 KB Posted

Attached to
MCTA Transit Facility-Additions & Renovations (GTC Rebid Only)
Solicitation number
Not on record
Issued by
Monroe County, Pennsylvania

About this file

This document is a Bid Breakdown Form from the MCTA Transit Facility Project Manual dated August 29, 2025, specifically Section 004373 detailing requirements for bid submission. The document outlines a mandatory process for the apparent low bidder for each Prime Contract to provide a comprehensive breakdown of their lump sum bid within 48 hours of bid opening. The breakdown must be organized across 17 specification divisions, ranging from General Requirements (Division 01) to Utilities (Division 33), with each division requiring a specific monetary amount to be listed.

The form is structured to provide granular financial transparency, requiring bidders to allocate their total bid amount across specific construction and infrastructure categories such as Concrete, Masonry, Metals, Wood and Plastics, Thermal and Moisture Protection, Openings, Finishes, Specialties, Equipment, Furnishings, Special Construction, Conveying Equipment, Earthwork, Exterior Improvements, and Utilities. While no specific bid amounts are filled in on this template, the document serves as a standardized framework for detailed bid cost allocation, enabling the MCTA (likely Metropolitan Council of Transit Authorities) to thoroughly analyze and compare the financial components of each construction bid.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MCTA Transit Facility BID BREAKDOWN

PROJECT MANUAL 004373 - 1

August 29, 2025

SECTION 004373 - BID BREAKDOWN

1.1 BID BREAKDOWN FORM – General Trades Construction

A. Within 48 Hours of the bid opening the apparent low bidder for each Prime Contract will be required to provide a breakdown of your firms lump sum bid according to the format listed below.

SPECIFICATION

DIVISION

DIVISION SPECIFICATION DESCRIPTION AMOUNT

DIVISION 01 GENERAL REQUIREMENTS $

DIVISION 02 EXISTING CONDITIONS $

DIVISION 03 CONCRETE $

DIVISION 04 MASONRY $

DIVISION 05 METALS $

DIVISION 06 WOOD AND PLASTIC, AND COMPOSITES $

DIVISION 07 THERMAL AND MOISTURE PROTECTION $

DIVISION 08 OPENINGS $

DIVISION 09 FINISHES $

DIVISION 10 SPECIALTIES $

DIVISION 11 EQUIPMENT $

DIVISION 12 FURNISHINGS $

DIVISION 13 SPECIAL CONSTRUCTION $

DIVISION 14 CONVEYING EQUIPMENT $

DIVISION 31 EARTHWORK $

DIVISION 32 EXTERIOR IMPROVEMENTS $

DIVISION 33 UTILITIES $

GRAND TOTAL

(FOR ALL APPLICABLE SECTIONS) $

MCTA Transit Facility BID BREAKDOWN

PROJECT MANUAL 004373 - 2

August 29, 2025

END OF SECTION 004373

File details come from the government source that posted it. Updated .