4-MCTA Bid Breakdown EC.pdf

PDF 122 KB Posted

Attached to
MCTA Transit Facility-Additions & Renovations (GTC Rebid Only)
Solicitation number
Not on record
Issued by
Monroe County, Pennsylvania

About this file

This document is a Bid Breakdown Form for the MCTA Transit Facility Electrical Construction project, dated August 29, 2025. The form requires the apparent low bidder for each Prime Contract to provide a detailed breakdown of their lump sum bid within 48 hours of the bid opening. The breakdown is comprehensive, covering multiple divisions including General Requirements, Existing Conditions, Concrete, Wood and Plastic, Thermal and Moisture Protection, Openings, Finishes, Equipment, Furnishings, Special Construction, Conveying Equipment, Plumbing, HVAC, Electrical, Communications, Electrical Safety and Security, and Earthwork.

The document provides a granular breakdown of specific specifications within each division, such as Cast In Place Concrete, Architectural Wood Casework, Overhead Coiling Doors, Domestic Water Pumps, HVAC Components, Electrical Systems, Communications Cabling, Access Control, and Trench & Backfill. Each specification section includes a placeholder for the monetary amount, culminating in a Grand Total line for all applicable sections. The form is structured to enable a precise financial breakdown of the electrical construction project, allowing for detailed cost tracking and analysis across various technical domains and project components.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MCTA Transit Facility BID BREAKDOWN

PROJECT MANUAL 004373 - 1

August 29, 2025

SECTION 004373 - BID BREAKDOWN

1.1 BID BREAKDOWN FORM – Electrical Construction

A. Within 48 Hours of the bid opening the apparent low bidder for each Prime Contract will be required to provide a breakdown of your firms lump sum bid according to the format listed below.

SPECIFICATION

DIVISION

DIVISION SPECIFICATION DESCRIPTION AMOUNT

DIVISION 01 GENERAL REQUIREMENTS $

DIVISION 02 EXISTING CONDITIONS $

DIVISION 03 CONCRETE $

03 30 00 – Cast In Place Concrete $

DIVISION 06 WOOD AND PLASTIC, AND COMPOSITES $

06 41 00 – Architectural Wood Casework $

DIVISION 07 THERMAL AND MOISTURE PROTECTION $

07 84 00 – Firestopping $

07 92 00 – Joint Sealants $

DIVISION 08 OPENINGS $

08 33 23 – Overhead Coiling Doors $

08 36 13 – Sectional Doors $

08 71 00 – Door Hardware $

DIVISION 09 FINISHES $

09 51 00 – Acoustical Ceilings $

09 96 00 – High Performance Coatings $

DIVISION 11 EQUIPMENT $

DIVISION 12 FURNISHINGS $

PROJECT MANUAL 004373 - 2

August 29, 2025

12 24 00 – Window Shades $

12 36 00 – Countertops $

DIVISION 13 SPECIAL CONSTRUCTION $

DIVISION 14 CONVEYING EQUIPMENT $

14 45 00 – Vehicle Lifts $

DIVISION 22 PLUMBING (TOTAL/SUM) $

22 11 23 – Domestic Water Pumps $

22 13 19 – Sanitary, Waste, Vent and Storm Piping Spe-cialties $

22 33 00 – Domestic Water Heaters $

DIVISION 23 HVAC (TOTAL/SUM) $

23 05 13 – Common Electrical Requirements for HVAC $

23 05 14 – Variable Frequency Drives $

23 09 00 – Instrumentation and Control for HVAC $

23 09 25 – Engin Exhaust Detection System $

23 34 16 – HVAC Fans $

23 55 23.13 – Low Intensity Gas-Fired Radiant Heaters $

23 63 30 – Condensing Boilers $

23 73 39 – Direct-Fired Heating and Ventilating Makeup- Air Units $

23 74 23 – Packaged Rooftop Gas Fired Units $

23 81 26 – Split-System Air-Conditioners and Heat Pumps $

23 82 39 – Unit Heaters $

DIVISION 26 ELECTRICAL (TOTAL/SUM) $

26 00 00 – General Electrical Provisions $

26 05 00 – Common Work Results for Electrical $

26 05 19 – Low-Voltage Electrical Power Conductors and Cables $

PROJECT MANUAL 004373 - 3

August 29, 2025

26 05 26 – Grounding and Bonding $

26 05 29 – Hangers and Supports $

26 05 33 – Raceways and Boxes for Electrical Systems $

26 05 43 – Underground Ducts and Raceways for Elec-trical Systems $

26 05 53 – Identification for Electrical Systems $

26 05 73 – Overcurrent Protective Device Coordination $

26 05 80 – Electrical Powered Equipment $

26 08 10 – Electrical Acceptance Testing $

26 09 23 – Lighting Control Devices $

26 09 43 – Network Lighting Controls $

26 09 93 – Sequence of Operation for Lighting Controls $

26 22 00 – Low-Voltage Transformers $

26 24 13 – Switchboards $

26 24 16 – Panelboards $

26 27 26 – Wiring Devices $

26 28 13 – Fuses $

26 32 13 – Engine Generators $

26 36 00 – Transfer Switches $

26 41 13 – Lightning Protection for Structures $

26 43 13 – Surge Protective Devices $

26 51 19 – Emergency and Exit Lighting $

26 52 19 – Emergency and Exit Lighting $

26 56 13 – Lighting Poles and Standards $

26 56 19 – LED Exterior Lighting $

DIVISION 27 COMMUNICATIONS (TOTAL/SUM) $

PROJECT MANUAL 004373 - 4

August 29, 2025

27 00 00 – General Communications Provisions $

27 05 00 – Common Work for Communications $

27 05 26 – Grounding and Bonding for Communications Systems $

27 05 28 – Pathways for Communications Systems $

27 05 29 – Hangers and Supports for Communications Systems $

27 05 36 – Cable Trays for Communications Systems $

27 05 53 – Identification for Communications Systems $

27 08 00 – Testing of Communications Systems $

27 11 00 – Communications Equipment Roof Fittings $

27 11 23 – Communications Cable Management and Ladder Rack $

27 13 13 – Communications Copper Backbone Cabling $

27 13 23 – Communications Optical Fiber Backbone Ca-bling $

27 15 13 – Communications Copper Horizontal Cabling $

27 15 23 – Communications Optical Fiber Horizontal Ca-bling $

DIVISION 28

ELECTRICAL SAFETY AND SECURITY

(TOTAL/SUM) $

28 00 00 – General Electronic Safety and Security Provi-sions $

28 05 00 – Common Work for Electronic Safety And Se-curity $

28 13 00 – Access Control $

28 23 00 – Video Surveillance $

28 31 11 – Digital Addressable Fire Alarm $

DIVISION 31 EARTHWORK $

31 23 33 – Trench & Backfill $

31 50 00 – Excavation Support & Protection $

GRAND TOTAL

(FOR ALL APPLICABLE SECTIONS) $

PROJECT MANUAL 004373 - 5

August 29, 2025

END OF SECTION 004373