6-MCTA Bid Breakdown HVAC.pdf
PDF 106 KB Posted
- Solicitation number
- Not on record
- Issued by
- Monroe County, Pennsylvania
About this file
This document is a Bid Breakdown form for the MCTA Transit Facility HVAC Construction project, dated August 29, 2025. The form requires the apparent low bidder for each Prime Contract to provide a detailed breakdown of their lump sum bid within 48 hours of the bid opening. The breakdown covers multiple specification divisions including General Requirements, Existing Conditions, Concrete, Thermal and Moisture Protection, Finishes, Equipment, Special Construction, Plumbing, and HVAC.
The HVAC division contains the most extensive breakdown, listing numerous specific subsections such as General HVAC Provisions, Variable Frequency Drives, HVAC Piping, Hydronic Pumps, Refrigerant Piping, Metal Ducts, Air Terminal Units, Condensing Boilers, Rooftop Units, and Split-System Air Conditioners. The document also includes Earthwork specifications for Trench & Backfill and Excavation Support & Protection. While no specific dollar amounts are filled in, the form provides a comprehensive template for bidders to itemize their proposed costs across various construction and mechanical system categories.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MCTA Transit Facility BID BREAKDOWN
PROJECT MANUAL 004373 - 1
August 29, 2025
SECTION 004373 - BID BREAKDOWN
1.1 BID BREAKDOWN FORM – HVAC Construction
A. Within 48 Hours of the bid opening the apparent low bidder for each Prime Contract will be required to provide a breakdown of your firms lump sum bid according to the format listed below.
SPECIFICATION
DIVISION
DIVISION SPECIFICATION DESCRIPTION AMOUNT
DIVISION 01 GENERAL REQUIREMENTS $
DIVISION 02 EXISTING CONDITIONS $
DIVISION 03 CONCRETE $
03 30 00 – Cast In Place Concrete $
DIVISION 07 THERMAL AND MOISTURE PROTECTION $
07 84 00 – Firestopping $
07 92 00 – Joint Sealants $
DIVISION 09 FINISHES $
09 51 00 – Acoustical Ceilings $
09 91 23 – Interior Painting $
DIVISION 11 EQUIPMENT $
DIVISION 13 SPECIAL CONSTRUCTION $
DIVISION 22 PLUMBING (TOTAL/SUM) $
22 16 16 – Natural Gas Piping $
DIVISION 23 HVAC (TOTAL/SUM) $
23 00 00 – General HVAC Provisions $
23 05 00 – Common Work for HVAC $
23 05 13 – Common Electrical Requirements for HVAC $
PROJECT MANUAL 004373 - 2
August 29, 2025
23 05 14 – Variable Frequency Drives $
23 05 19 – Meters and Gages $
23 05 23 – General Duty Valves for HVAC Piping $
23 05 29 – Hangers and Supports for HVAC Piping and Equipment $
23 05 48 – Vibration Controls for HVAC $
23 05 53 – Identification for HVAC Piping and Equip-ment $
23 05 80 – Roof Curbs and Rails $
23 05 93 – Testing, Adjusting, and Balancing $
23 07 13 – Duct Insulation $
23 08 00 – Commissioning for HVAC $
23 09 00 – Instrumentation and Control for HVAC $
23 09 25 – Engin Exhaust Detection System $
23 21 13 – HVAC Piping $
23 21 23 – Hydronic Pumps $
23 23 00 – Refrigerant Piping $
23 25 00 – HVAC Water Treatment $
23 31 13 – Metal Ducts $
23 33 00 – Air Duct Accessories $
23 34 16 – HVAC Fans $
23 36 00 – Air Terminal Units $
23 37 13 – Diffusers Registers and Grilles $
23 37 23 – HVAC Gravity Ventilators $
23 51 23 – Gas Vents $
23 55 23.13 – Low Intensity Gas-Fired Radiant Heaters $
23 63 30 – Condensing Boilers $
PROJECT MANUAL 004373 - 3
August 29, 2025
23 73 39 – Direct-Fired Heating and Ventilating Makeup- Air Units $
23 74 23 – Packaged Rooftop Gas Fired Units $
23 81 26 – Split-System Air-Conditioners and Heat Pumps $
23 82 39 – Unit Heaters $
DIVISION 31 EARTHWORK $
31 23 33 - Trench & Backfill $
31 50 00 – Excavation Support & Protection $
GRAND TOTAL
(FOR ALL APPLICABLE SECTIONS) $
END OF SECTION 004373