This document outlines a federal contract opportunity for stewardship services on the Mt. Hood National Forest in Oregon. The contract involves performing essential maintenance of roads impacted by recent fires, mitigating roadside fuel accumulations, preparing sites for reforestation, and conducting erosion control and slash treatment along suppression lines. Two awards may be made, one for work on the White River Fire and one for suppression repair on the Bull Complex Fire, with a preference given to proposals that utilize air curtain burning to dispose of slash on the Bull Complex. The estimated timber volume is 9,818 CCF of various conifer species. The performance period ends on October 31, 2024. A pre-bid site visit will be held on August 17, 2022. The request for quotes is expected to issue on August 12, 2022 and will use a best value evaluation for awarding a firm fixed price commercial services contract.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
White River Fire Recovery Stewardship IRSC Mt. Hood National Forest
Page 1 of 6 Barlow Ranger District
APPENDIX E
Bull Complex Suppression Repair Specifications
SUPPRESION REPAIR TABLE
REPAIR
FEATURE
ACRES
SUPPRESION REPAIR SPECIFICATION
LENGTH WIDTH RT-1 RT-2 RT-3 RT-5 RT-7 RT-8 RT-9
L114 20,008
FT
C C
L120 2,383 FT C C C
L126 1,055 FT C C C
L153 1,272 FT C
L163 22,274
FT
C C
P094 C
P101 C C C
P108 C
P353 C
Notes:
C = Contractor Performance Item
O = Optional Contract Line Item
White River Fire Recovery Stewardship IRSC Mt. Hood National Forest
Page 2 of 6 Barlow Ranger District
SUPPRESION REPAIR SPECIFICATIONS FOR STEWARDSHIP CONTRACTS
Contractor shall perform suppresion repair in accordance with the following Contract Suppresion Repair
Requirements Summary:
REPAIR SPECIFICATIONS
REPAIR TYPE NUMBER SPECIFICATION TITLE
RT-1 Berm Pull Back
RT-2 Waterbars
RT-3 Slash Treatments
RT-5 Skid and Deck
RT-7 Suppression Line Closure
RT-8 Culvert and Spillway Repair
RT-9 Burn Piles
White River Fire Recovery Stewardship IRSC Mt. Hood National Forest
Page 3 of 6 Barlow Ranger District
RT-1 Berm Pull Back
Berms created during suppression actions shall be pulled back and spread back into bladed surface to restore natural contour. Resulting surface shall allow water to spread freely. When slash or other material is present in berms it shall be 1/ treated as per RT-3
RT- 2 Waterbars
Waterbars shall be installed on suppression lines as shown on Contract Area Map and/or designated on the ground with 1/ N/A in accordance with drawings and specifications shown below.
Construct waterbars by cutting a dip in the suppression line and mounding excavated material along the downgrade edge of the Waterbar. Waterbars shall be cut to a sufficient angle so that they will drain to the outside of the repaired line into undisturbed ground and not direct water into stream channels.
Mechanical waterbars shall have a minimum height of 2/ 18 inches and not exceed 2/ 24 inches.
Manual waterbars shall have a minimum height of 2/ 8 inches and not exceed 2/ 12 inches.
All material excavated shall be used in the installation of Waterbar. Bermed material shall be compacted over the length and width of the berm by the equipment performing the work.
Waterbars shall cross the entire suppression line and be constructed to the following spacing unless otherwise designated by the Forest Service.
Fire Line Gradient
(% slope)
Distance Between Waterbars
(feet)
5 to 15 150 to 125
15 to 35 75 to 45
35 to 65 35 to 20
65+ 15
White River Fire Recovery Stewardship IRSC Mt. Hood National Forest
Page 4 of 6 Barlow Ranger District
RT- 3 Slash Treatments
Slash is defined as logs, limbs, rootwads and other woody material, exclusive of stumps that was generated from suppression line construction. Slash shall be removed from berms and keyholes.
Unless otherwise agreed to in writing, Contractor shall perform the following work described below and/or as shown on Contract Area Maps.
Slash Treatment Table
Repair Feature(s) Type of Slash Treatment
L114 and L120 Slash created during suppression line construction shall be masticated and/or chipped to a maximum depth of 6” or disposed of by burning in a contained unit.
White River Fire Recovery Stewardship IRSC Mt. Hood National Forest
Page 5 of 6 Barlow Ranger District
L126 Slash created during suppression line construction shall be scattered over line to a minimum 70% cover.
L163 Cut out and scatter down material covering trail to re-establish trail tread where necessary.
RT- 5 Skid and Deck or Skid and Pile
Mechanically skid cut biomass material to designated landings or piling locations.
Decked biomass material shall have all boles parallel, and deck is compact. Includes tops and limbs of material unless otherwise agreed upon.
Piled biomass material shall be constructed dirt-free and compact to facilitate complete burning. Piled biomass material will be of a size which will not result in damage to residual timber or vegetation.
Skidding and Deck and Pile Requirements Table
Repair Feature(s) Skidding and Deck/Pile Requirements
L153, P260 Remove all cut trees from ditch line and deck/pile as agreed for disposal.
RT- 7 Suppression Line Closure
Unless otherwise agreed in writing, suppression lines shall be closed to vehicular traffic per requirements listed below.
Closure Requirements Table
Repair Feature(s) Closure Requirements
L126 Line to be closed to vehicular off-highway traffic root wads and boulders sourced from suppression line construction.
P101 Block edge and entrance of landing to vehicular traffic with root wads and stumps after deck has been disposed of.
White River Fire Recovery Stewardship IRSC Mt. Hood National Forest
Page 6 of 6 Barlow Ranger District
RT-8 Culvert and Spillway repair
Removal of debris from culverts and spillway ditches to allow for the free flow of water.
Culvert and Spillway Repair Table
Repair Feature(s) Repair Requirements
L114 Clean all culverts, catch basins, outlet ditches, headwalls, and drop inlets on FSR 130 impacted by suppression operations.
RT-9 Pile Disposal
Piled slash to be disposed of onsite.
Repair Feature(s) Repair Requirements
L153, P094, P101, P108, P353 Decked logs and piled slash shall be chipped and spread to a maximum of 15 tons per acre/chip bed depth of 6” or disposed of in a curtain burner type contained unit.