7. Drawings and Specifications.pdf
PDF 1 MB Posted
- Attached to
- USFS - M4 Road Slide Repair
- Solicitation number
- 127EAW26Q0007
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a set of construction plans and specifications for the M4 Road Repair S16 project located on the Mendocino National Forest in Tehama County, California, managed by the Grindstone Ranger District of the U.S. Department of Agriculture Forest Service.
The project involves repairing a failed section of Forest Service Road M4 caused by culvert failure. The work includes excavation of unstable fill material to approximately 10 feet below the existing road surface, installation of a new 24-inch diameter corrugated metal pipe (CMP) culvert at a 10% grade with a drop inlet structure, construction of a geogrid-reinforced embankment using Type III geogrid in multiple tiers, placement of Class 2 and Class 3 riprap for slope and outlet protection, installation of surface aggregate, erosion control measures, seeding, and temporary traffic control. The schedule of items includes mobilization, survey and staking, soil erosion and pollution control, roadway excavation and embankment (1,400 cubic yards), geotextile placement (1,560 square yards), riprap placement (2 tons Class 2 and 14 tons Class 3), surface aggregate (30 tons), a 24-inch CMP with fittings (40 linear feet), drop inlet installation (1 each), seeding (215 square yards), and temporary traffic control. The existing 18-inch CMP must be completely removed, and unsuitable material must be disposed of off government lands in accordance with local and state regulations. The contractor is responsible for minimizing equipment travel on existing pavement, obtaining permits for oversize/overload travel, and establishing approved pollution control and traffic control plans.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RECOMMENDED BY:
APPROVED:
FOREST ENGINEER
DISTRICT RANGER DATE
DATE
DATEFOREST SUPERVISOR
INDEX OF SHEETS
SHT SHEET TITLE DATE
TITLE
G-1 LOCATION MAP 8/08/24
G-2 SCHEDULE OF ITEMS & NOTES 4/13/26
D-1 PLANS 4/13/26
D-2 SECTIONS 4/13/26
D-3 DETAILS 8/14/24
D-4 TYPICALS 8/14/24
M4 ROAD REPAIR S16
CALIFORNIA
TEHAMA COUNTY
R05 PACIFIC SOUTHWEST
MENDOCINONATIONAL FOREST
GRINDSTONE RANGER DISTRCT
United States Department of Agriculture Forest Service
TRAVEL DIRECTIONS:
FROM CORNING, TRAVEL WEST
ON TC A9 (CORNING ROAD) FOR
19.5 MILES TO PASKENTA.
CONTINUE SOUTH ON TC 55
(ROUND VALLEY ROAD) PAST THE
SALT CREEK CONSERVATION
CAMP FOR 13.6 MILES TO THE
INTERSECTION WITH FOREST
SERVICE M4. TC 55 CONTINUES
TO THE LEFT. (39.8258, -122.6792).
TC 55 CAN ALSO BE REACHED
FROM THE SOUTH VIA SR 162
(WEST FROM WILLOWS) AND
GLENN COUNTY ROAD 306 TO
TAHAMA COUNTY ROAD 58
THROUGH NEWVILLE.
PROJECT LOCATION
MENDOCINO
NATIONAL
FOREST
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
4/1 5/2
6 1 0:
G
EO
RG
E.
BU
TL
ER
D :\M
NF
\M
4_
FI
LL
FA
IL
\D
W
GS
\M 4_
FI
LL
FA
IL
_R V_
4-
-2 6.D
W G;
(R05)
PACIFIC SOUTHWEST
M4 ROAD REPAIR S16
MENDOCINO
NATIONAL FOREST
GRINGSTONE
RANGER DISTRICT
LOCATION
AND NOTES
8/27/24
G BUTLER
G BUTLER
F. RICO
G-1
2 MILES
TO ELK CREEK
AND WILLOWS
PROJECT LOCATION NOTES:
1. THIS MAP SHOWS COUNTY ROADS AND PRIMARY FS ROADS IN THE AREA. SOME OTHER FS ROADS ADJACENT TO THE WORK ARE SHOWN TO AID IN NAVIGATION. MOST FS AND ANY PRIVATE ROADS IN THIS AREA ARE NOT
SHOWN. FOR A COMPLETE MAP, CONTACT THE GRINDSTONE RANGER DISTRICT OFFICE.
2. THE PRIMARY DETOUR ROUTE FOR ACCESS AROUND THE WORK SITE IS SHOWN. SPECIFIC DETAILS OF ANY
TRAFFIC CONTROL AND ROAD CLOSURE SIGNING REQUIREMENTS ARE IN CONTRACT SECTION H.
ENCROACHMENT PERMITS FOR TRAFFIC CONTROL ARE THE RESPONSIBILITY OF THE CONTRACTOR.
3. NON-POTABLE WATER FOR CONSTRUCTION MAY BE OBTAINED AT PASKENTA WORK CENTER. ADDITIONAL
WATER SOURCES MAY BE IDENTIFIED AND APPROVED BY THE CONTRACTING OFFICER.
4. CONTRACTOR SHALL MINIMIZE TRAVEL OF STEEL TRACKED MACHINES ON THE EXISTING AC AND CHIP SEAL PAVEMENT. ANY DAMAGE TO THE ROAD(S) AS A RESULT OF THEIR ACTIVITIES SHALL BE REPAIRED BY THE
CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT.
5. PERMITS FOR OVERSIZE/OVERLOAD TRAVEL ON ANY ROADS SHALL BE OBTAINED BY THE CONTRACTOR
PRIOR TO USE.
PROJECT MAP Paskenta A9
23N3523N109
23N100
N6
23N46
23N04
23N21
23N63
TC 55 DETOUR ROUTE SALT CREEK CCC STATION
WORK SITE
LOG SPRING FS
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text N
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
4/1 5/2
6 1 0:
G
EO
RG
E.
BU
TL
ER
D :\M
NF
\M
4_
FI
LL
FA
IL
\D
W
GS
\M 4_
FI
LL
FA
IL
_R V_
4-
-2 6.D
W G;
(R05)
PACIFIC SOUTHWEST
M4 ROAD REPAIR S16
MENDOCINO
NATIONAL FOREST
GRINGSTONE
RANGER DISTRICT
SCHEDULE AND
NOTES
4/13/26
G BUTLER
G BUTLER
F. RICO
G-2
NOTES TO THE SCHEDULE OF ITEMS
15101 MOBILIZATION: INCLUDES ALL COSTS TO DEPLOY PERSONNEL AND
EQUIPMENT TO THE PROJECT SITE. ALL COSTS TO DEMOBILIZE
PERSONNEL AND EQUIPMENT INCLUDING UNUSED MATERIALS AND
SUPPLIES NOT PURCHASED BY THE GOVERNMENT.
15201 SURVEY AND STAKING: INCLUDES ALL COSTS FOR PERSONNEL,
SUPPLIES, AND EQUIPMENT TO ESTABLISH AND MAINTAIN THE
CONSTRUCTION CONTROLS.
15701 WORK FOR THIS ITEM WILL INCLUDE ALL EQUIPMENT, MATERIALS,
AND LABOR NECESSARY TO PERFORM THE REQUIREMENTS OF THE
APPROVED POLLUTION AND EROSION CONTROL PLAN. THIS ITEM
COVERS ALL PHASES OF THE CONTRACT.
20401 ROADWAY EXCAVATION: INCLUDES ALL COSTS FOR PERSONNEL,
MATERIALS, AND EQUIPMENT NECESSARY FOR THE EXCAVATION,
EMBANKMENT, AND COMPACTION OF THE ROAD REPAIR AS SHOWN IN
THE DRAWINGS
20701 GEOTEXTILE: INCLUDES ALL COSTS TO FURNISH AND PLACE THE
REQUIRED GEOGRID REINFORCEMENT IN ACCORDANCE WITH THE
MANUFACTURER'S RECOMMENDATIONS, THE SPECIFICATIONS, AND
AS SHOWN IN THE DRAWINGS.:
25102 RIPRAP (A&B): INCLUDES ALL COSTS TO FURNISH AND PLACE THE
RIPRAP ROCK IN ACCORDANCE WITH THE SPECIFICATIONS AND AS
SHOWN IN THE DRAWINGS. RIPRAP PLACEMENT INCLUDES THE
REQUIRED FILTER/SEPARATION GEOFABRIC AS SHOWN IN THE
DRAWINGS.
30102 SURFACE AGGREGATE: INCLUDES ALL COSTS TO FURNISH AND PLACE
THE SURFACE AGGREGATE IN ACCORDANCE WITH THE
SPECIFICATIONS AND AS SHOWN IN THE DRAWINGS.
60201 DRAINAGE CULVERT, CMP: INCLUDES ALL COSTS TO FURNISH AND
INSTALL THE 24" DRAIN CMP AND NECESSARY FITTINGS IN
ACCORDANCE WITH THE SPECIFICATIONS AND AS SHOWN IN THE
DRAWINGS.
60402 DROP INLET: INCLUDES ALL COSTS TO FURNISH AND INSTALL THE
DROP INLET IN ACCORDANCE WITH THE SPECIFICATIONS AND AS
SHOWN IN THE DRAWINGS.
62901 SEEDING: INCLUDES ALL COSTS TO FURNISH AND PLACE THE
SEED/ROLLS IN ACCORDANCE WITH THE SPECIFICATIONS AND AS
SHOWN IN THE DRAWINGS.
63501 THIS ITEM INCLUDES ALL EQUIPMENT, MATERIALS, AND LABOR TO
ESTABLISH AND MAINTAIN THE APPROVED TRAFFIC CONTROL PLAN
FOR THE DURATION OF PROJECT SITE WORK.
SCHEDULE OF ITEMS
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
E
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
4/1 5/2
6 1 0:
G
EO
RG
E.
BU
TL
ER
D :\M
NF
\M
4_
FI
LL
FA
IL
\D
W
GS
\M 4_
FI
LL
FA
IL
_R V_
4-
-2 6.D
W G;
(R05)
PACIFIC SOUTHWEST
M4 ROAD REPAIR S16
MENDOCINO
NATIONAL FOREST
GRINGSTONE
RANGER DISTRICT
PLAN
4/13/26
G BUTLER
G BUTLER
F. RICO
D-1
BASE MAT, 20' X 50'
DROP INLET DETAIL
DRAIN FLOW IN DITCH
NOTES:
1. EXCAVATION FOR THE BASE MAT IS TO ELEVATION 4560
(APPROXIMATELY 10' BELOW THE FINISH GRADE OF THE
RECONSTRUCTED ROAD SURFACE.
2. THE ENTIRE EXISTING CMP CULVERT IS TO BE REMOVED IN
ACCORDANCE WITH SECTION 203
3. THE OUTLET DISSIPATER RIPRAP WILL COVER AN AREA 10' WIDE
(CENTERED ON THE PIPE) AND EXTEND 1' ABOVE AND 12' BELOW THE
OUTLET. ROCK MUST CONFORM TO 705, CLASS 3
4. THE WIDTH OF THE BASE (T-1) GEOTEXTILE WILL VARY SLIGHTLY
DEPENDING ON THE POINT IF INTERSECTION OF THE EXCAVATION FLOOR
WITH THE NATURAL SLOPE
73°±
EXISTING CMP TO BE REMOVED
RIPRAP OUTLET APRON SEE
NOTE 3
GEOGRID STRUCTURE
SEE SHT. D-2
INSIDE EDGE OF ROAD
A
A B
B
110'
39'
A
27'
SEE NOTE 4
63'
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
N
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
4/1 5/2
6 1 0:
G
EO
RG
E.
BU
TL
ER
D :\M
NF
\M
4_
FI
LL
FA
IL
\D
W
GS
\M 4_
FI
LL
FA
IL
_R V_
4-
-2 6.D
W G;
(R05)
PACIFIC SOUTHWEST
M4 ROAD REPAIR S16
MENDOCINO
NATIONAL FOREST
GRINGSTONE
RANGER DISTRICT
DETAILS 1
4/13/26
G BUTLER
G BUTLER
F. RICO
D-2
EXISTING 18" CMP
24" DEEP BASE GEOGRID MAT
20' X 50'. SEE NOTE 3
SECTION B-B, CONSTRUCTED
SECTION A-A, POST FAILURE
41'
OUTLET APRON CLASS 3 RIPRAP
ON GEOTEXTILE FABRIC
NOTES:
1. THE "APPROXIMATE FAILURE PLANE" IS
PROJECTED FROM SURFACE
INDICATORS WHICH SUGGEST A FILL
FAILURE PRECIPITATED BY THE
CULVERT FAILURE. THE PLANNED
EXCAVATION IS 10' BELOW THE
EXISTING ROAD SURFACE.
2. THE EXISTING 18' CMP IS TO BE
REMOVED ENTIRELY. THAT PORTION OF
THE EXCAVATION NOT IN THE AREA OF
THE CONSTRUCTED REINFORCED FILL
SLOPE OR NEW CMP INSTALATION
MUST BE BACKFILLED IN ACCORDANCE
WITH SECTION 203. ALL UNSUITABLE
MATERIAL MUST BE DISPOSED OF OFF
GOVERNMENT LANDS IN ACCORDANCE
WITH LOCAL AND STATE REGULATIONS.
3. THE BASE TIER (BASE MAT) AND TIERS
1-3 MUST UTILIZE TYPE III GEOGRID.
FOR THE BASE MAT, THE FABRIC MUST
BE TURNED UP AND OVER THE 24" LIFT
AND BE LAID BACK NO LESS THAN 36".
THE TIER 1 (T1) GRID IS LAID DIRECTLY
ON THE OVERTURNED FABRIC AND
EXTENDS TO THE RECONSTRUCTED
SLOPE.
4. THE OUTLET APRON RIPRAP MUST BE
PLACED ON GEOTEXTILE CONFORMING
TO CLASS 1, TYPE C. THE SHEET MUST
EXTENDS AT LEAST 12" BEYOND THE
PLACED ROCK.
5. THE 24" CMP IS TO BE INSTALLED AT A
CONTINUOUS GRADE OF 10% (4' DROP
OVER THE 40' RUN). THE OUTLET
FITTING IN THE DROP-INLET MUST BE
FABRICATED TO ACCOMMODATE A
PROPER CONNECTION AT THAT ANGLE.
6. INFORMATION ON THE DROP-INLET
COVER IS NOTED ON SHEET D-2
7. THE POST-FAILURE PROFILE AS SHOWN
HAS BEEN MODIFIED BY RECENT
TEMPORARY REPAIRS. THE
ESSENTIALCONDITIONS REMAIN AS
SHOWN.
RECONSTRUCTED SURFACE PROFILE
APPROXIMATE FAILURE PLANE
POST-FAILURE GROUND PROFILE PRE-FAILURE GROUND PROFILE
INSTALLED DROP-INLET AND CULVERT
SEE DETAIL SHT D-3
SLOPE ARMOR, CLASS 3 RIPRAP
GEOGRID STABILIZED STRUCTURE
BOTTOM TIER (T1): 40' X 110'
T2
T3
1.70
ROAD
20'
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
4/1 5/2
6 1 0:
G
EO
RG
E.
BU
TL
ER
D :\M
NF
\M
4_
FI
LL
FA
IL
\D
W
GS
\M 4_
FI
LL
FA
IL
_R V_
4-
-2 6.D
W G;
(R05)
PACIFIC SOUTHWEST
M4 ROAD REPAIR S16
MENDOCINO
NATIONAL FOREST
GRINGSTONE
RANGER DISTRICT
DETAILS
8/22/24
G BUTLER
G BUTLER
F. RICO
D-3
CLASS 2 RIPRAP
BASIN REINFORCEMENT
CLASS 3 RIPRAP
SLOPE REINFORCEMENT
30" x 12 Ga RISER
24" X 14 Ga CMP
48"
OPEN GRATE COVER
SEE NOTE 5
CULVERT BEDDING6" ABOVE RISER BOTTOM
NATIVE SURFACE SLOPE
ROAD SURFACE
COUPLING BAND
NOTES:
1. THE DROP INLET IS SET ON THE SAME BEDDING MATERIAL AS THE
CULVERT. BEDDING MATERIAL MUST CONFORM WITH AASHTO M6,
BEDDING MATERIAL MUST COME UP TO TO THE MID-POINT OF THE
PIPES VERTICAL DIAMETER. NO ROCK LARGER THAN 1-1/2" WILL
COME IN CONTACT WITH THE CULVERT OR THE INLET IN THE
BACKFILL.
2. THE CULVERT IS TO BE GALVANIZED CORRUGATED METAL (STEEL)
PIPE WITH MINIMUM WALL THICKNESS OF 14 Ga. THE DROP INLET
IS TO BE GALVANIZED CORRUGATED METAL (STEEL) PIPE WITH
MINIMUM WALL THICKNESS OF 12 Ga. COUPLING BANDS ARE TO BE
AS RECOMMENDED OR SUPPLIED BY THE PIPE MANUFACTURER.
3. ALL SHOP OR FIELD FABRICATIONS INVOLVING CUTTING OR
WELDING OF THE STRUCTURE MUST BE COATED WITH TWO
COATS OF A ZINC-RICH PAINT INTENDED FOR THAT PURPOSE.
4. THE RISER OUTLET STUB MUST BE FABRICATED WITH THE 10%
DROP ANGLE OF THE CULVERT.
5. THE COVER GRATE SHOWN BELOW IS ONE POSSIBLE
CONFIGURATION. OTHERS ARE PERMITTED PROVIDED THEY MEET
THE FOLLOWING:
a. DEBRIS SMALLER THAN 2" IS ALLOWED TO PASS INTO THE
CULVERT.
b. ALL DEBRIS LARGER THAN 31
2" IS RETAINED ON THE GRATE.
c. THE DESIGN AND MATERIALS MUST WITHSTAND A 10#
ROCK DROPPING 10' WITH OUT SIGNIFICANT
DEFORMATION.
d. FABRICATED FROM STEEL THAT IS HOT-DIPPED
GALVANIZED
e. IS SECURELY ATTACHED TO THE INLET AND REMOVABLE
FOR MAINTENANCE.
2"
INITIAL (SELECT) BACKFILL
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
4/1 5/2
6 1 0:
G
EO
RG
E.
BU
TL
ER
D :\M
NF
\M
4_
FI
LL
FA
IL
\D
W
GS
\M 4_
FI
LL
FA
IL
_R V_
4-
-2 6.D
W G;
(R05)
PACIFIC SOUTHWEST
M4 ROAD REPAIR S16
MENDOCINO
NATIONAL FOREST
GRINGSTONE
RANGER DISTRICT
ROAD TYPICALS
8/22/24
G BUTLER
G BUTLER
F. RICO
D-4
NOTES:
1. THIS DRAWING IS FOR GENERAL
REFERENCE ONLY. IT IS INTENDED TO
GUIDE THE CONTRACTOR IN SHAPPING
AND TRANSITIONING THE INSIDE DITCH
TO THE NEW DROP INLET.
2. DIMENSIONS AS SHOWN ON SHEETS
D-1, D-2, AND D-3 ARE TO BE FOLLOWED
IN CONSTRUCTING THE DRAINAGE
STRUCTURES.
CULVERT INLET - A
SIDE CATCH BASIN
CULVERT INLET - B
DROP INLET
RIPRAP ARMOR NOT SHOWN
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
| Sheets and Views |
| M4_FillFail_Rv_4-15-26-Title |
| M4_FillFail_Rv_4-15-26-G-1_Location |
| M4_FillFail_Rv_4-15-26-G-2 Sch |
| M4_FillFail_Rv_4-15-26-D-1_Plans |
| M4_FillFail_Rv_4-15-26-D-2_RoadSects |
| M4_FillFail_Rv_4-15-26-D-3_Details2 |
| M4_FillFail_Rv_4-15-26-D-4_Typls |
File details come from the government source that posted it. Updated .