3. Schedule of Items.docx

DOCX document 23 KB Posted

Attached to
USFS - M4 Road Slide Repair
Solicitation number
127EAW26Q0007
Issued by

About this file

This is a Schedule of Items pricing document for the M4 Road Slide Repair project at Mendocino National Forest in California. The schedule outlines 11 line items for a road repair and stabilization project, with quantities estimated and subject to field verification. Key work items include mobilization, construction survey and staking, soil erosion and pollution control, roadway excavation and embankment (1,400 cubic yards), earthwork geogrid installation (1,560 square yards), riprap placement in two classes totaling 16 tons, aggregate surface application (30 tons), 24-inch corrugated metal pipe installation (40 linear feet), drop inlet with grate cover (1 each), seeding with roll application (215 square yards), and temporary traffic control. All quoted items require unit pricing with total cost calculations.

The solicitation is issued by the Department of Agriculture Forest Service as a Request for Quotation (RFQ) under solicitation number 127EAW26Q0007 and is designated as a Total Small Business Set-Aside with a $45 million small business size standard threshold. Payment will be made based on actual work performed rather than estimated quantities. A bid bond or guarantee is required for proposals exceeding $150,000, with premium costs to be included under the Mobilization line item. Contractors must submit pricing for all items, with requests for information due by May 12, 2026, at 11:00 AM Pacific Time. No site visit is scheduled, though contractors are permitted to conduct their own site inspections.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF ITEMS

M4 ROAD SLIDE REPAIR

MENDOCINO NATIONAL FOREST

ITEM
DESCRIPTION
M-M
Unit
Qnty
Unit Price
Cost
15101
Mobilization
CQ
LS
1

15201 Construction survey and staking, Method: I, Tolerance: A

CQ
LS
1
15701
Soil erosion and Pollution control
CQ
LS
1

20401 Roadway Excavation & Embankment, Compaction Method: 1

CQ
CY
1400
20701
Earthwork geogrid, Type: IV
CQ
SY
1560
25102A
Placed riprap, Class: 2
CQ
TON
2
25102B
Placed riprap, Class: 3
CQ
TON
14
30102
Aggregate Surface, Gradation: T
CQ
TON
30

60201 24 inch corrugated Metal Pipe, 14 Gauge, Compaction method: 1

CQ
LF
40
60402
Inlet, Drop w/ grate cover, 30" X 12 Gauge
CQ
EA
1
62901
Seeding, Roll
CQ
SY
215
63501
Temporary traffic control
CQ
LS
1
TOTAL
$

SCHEDULE NOTES

* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.

* All quantities in the bid schedule are contract quantities. Payment will be made on actual work performed.

* One award will be made from this solicitation; contractors must submit pricing for all items.

* Bid Bond/Guarantee. REQUIRED for proposals exceeding $150,000.00 IAW FAR 52.228-1 Bid Guarantee. Payment for bond premiums shall not be in addition to the contract price. Include bond payments under Mobilization.

The contractor shall complete the table below and include the information with their quote.

Company Name:

Company Address:

UEI Number:

POC Name and Title:

Phone Number:

Email:

Tax ID: