7. Attachment F-4 Mobile Test Bed SIR, updated.pdf

PDF 175 KB Posted

Attached to
6973GH-23-R-00143; 20-042069 Mobile Test Bed Facility Federal contract opportunity
Solicitation number
6973GH-23-R-00143
Issued by
Department of Transportation Federal Aviation Administration Franchise Acquisition Services

About this file

This document is a notification from an organization's environmental, occupational safety and health (EOSH) representative to a contracting officer's representative (COR) regarding applicable operational controls for contractor activities. The notification identifies 14 operational controls spanning environmental, occupational safety, and health topics that apply to the activities outlined in a previously submitted notification of contractor activities or statement of work. The controls address issues including storm and surface water discharges, solid waste generation, electrical safety, fall protection, and physical hazards. The contract company is required to communicate the operational controls to personnel performing the work and ensure competency requirements in the control documents are met. The EOSH representative and COR names and contact information are provided, along with the date.

View the file

Other files for this federal contract opportunity

Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CCDEDCF GHIJKI KLMNLO

Appendix F

F-11

UNCONTROLLED COPY WHEN DOWNLOADED

Verify That This Is The Correct Revision Before Use.

Attachment F-4. Notification of Environmental, Occupational Safety and Health Management System (EOSHMS) Operational Control Applicability.

To (COR): __________________________________________________

From (Organization EOSH Representative):__________________

The attached operational controls have been identified as applying to the activities identified in the “Notification of Contractor Activities” (or an equivalent document such as a statement of work that identified work activities) that you recently submitted. Implementing the operational controls into those activities is required for conformance with the MMAC EOSHMS. The contract company is required to communicate these operational controls to personnel who perform the work activities associated with the operational controls. Competency requirements are contained within the operational control documents. A copy of each operational control is attached.

Please review and contact me if there are any questions.

Applicable Operational Controls (list below):

Signature: _______________________________________________________ Phone Number: ___________________________________________________ Routing Symbol: __________________________________________________ Date: ___________________________________________________________

AMP400-ENV-OC-2.4.3-CC Storm & Surface Water Discharges AMP400-ENV-OC-2.5-CC Solid Waste Generation AMP400-OSH-OC-3.1-CC Electrical AMP400-OSH-OC-5.1-CC Falls AMP44-OSH-OC-8.1-CC Physical

AMP-400

2023-04-27T09:31:20-0500
KOU CHANG
I am the author of this document
EOSH Rep Name: KOU CHANG
Project COR Name: CHAD NIMMO
EOSH Rep Phone Number: 405-954-8719
Date_af_date: 04/27/2023

File details come from the government source that posted it. Updated .