SA_Addendum-002 _ MSTB 230801 Complete.pdf
PDF 2 MB Posted
- Attached to
- 6973GH-23-R-00143; 20-042069 Mobile Test Bed Facility Federal contract opportunity
- Solicitation number
- 6973GH-23-R-00143
About this file
This addendum to a federal contract opportunity solicitation provides revisions to construction documents for a Mobile Systems Test Bed facility project. Key details include specifications for pre-finished metal roof and wall panels, drawings noting roof insulation systems and revising details, and responses to bidder questions. Revisions consist of designating spray foam insulation on wall sections, noting roof insulation per specifications, and identifying the basis of design for roof and wall metal panels while removing roof ventilators. The solicitation number is 6973GH-23-R-00143 for the project with work order 6973GH-22-F-00856 issued by the Department of Transportation Federal Aviation Administration.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 002
Date of Issue: August 1, 2023
CONTRACT NO. 6973GH-21-D-000044
WORK ORDER 6973GH-22-F-00856
MSTB FACILITY
US DEPT. OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
Prepared by:
108 South Broadway
Edmond, Oklahoma 73034
405.840.1111 (v) 405.840.1191 (f)
Architect
Thomas Small, AIA
08/01/2023
Addendum No. 002 MSTB, FAA-OKC Work Order 6973GH-22-F-00856 Issued: August 1, 2023
Addendum No. 002 forms a part of the Contract Documents and modifies the original bid documents. Items in this Addendum take precedence over the original documents. Addendum No. 002 consists of the following:
General Information:
The purpose of the Addendum is to respond to Bidders questions and revise the construction documents in response.
Revisions are as follows:
1) Drawing revisions to indicate PEMB Batt roof insulation system noted in Specification
Section 07.21.16.
2) Revised Specification Section 13.34.19 – Metal Building Systems to identify roof and wall metal panels basis of design and delete remove roof ventilators accessory.
3) Bid Questions with responses.
Drawings:
1) Refer to attached Sheet A.501. Revisions to this sheet are the wall hatch designating the foam insulation. This sheet replaces A.501 in the original Construction Documents. This is a new sheet that replaces, in its entirety, the original sheet in the Construction Documents.
2) Refer to attached Sheet A.502. Revisions to this sheet include noting the PEMB roof insulation per spec section 07.21.16. This sheet replaces A.502 in the original Construction Documents. This is a new sheet that replaces, in its entirety, the original sheet in the Construction Documents.
3) Refer to attached Sheet A.702, Revisions to this sheet include noting the PEMB roof insulation per spec section 07.21.16 and revising the details to not show foam insulation on the roof deck. This sheet replaces A.702 in the original Construction Documents. This is a new sheet that replaces, in its entirety, the original sheet in the Construction Documents.
Specifications:
1) Refer to attached specification section 13.34.19 – Metal Building systems. Revisions include identifying basis of design for the roof and wall panels and deletion of roof ventilators in the accessories section. The Section replaces in its entirety the original specification section in the Construction Documents.
Bid Documents:
None.
Addendum No. 002 MSTB, FAA-OKC Work Order 6973GH-22-F-00856 Issued: August 1, 2023
Attachments:
1. A.501 Building Sections
2. A.502 Wall Sections
3. A.702 Wall Section Details
4. Specification Section 13.34.19 – Metal Building Systems
- End of Addendum No. 002 -
FINISH FLOOR
100' - 0"
RIDGE
136' - 9"
A.501
A.501
A.501
PRE-FINISHED METAL
ROOF PANELS BY PEMB
MANUFACTURER, TYP.
PRE-FINISHED METAL
WALL PANEL
BY PEMB
MANUFACTURER, TYP.
RIGID FRAME BY
PEMB MANUFACTURER
PRE-FINISHED METAL WALL
PANEL BY PEMB
MANUFACTURER, TYP.
PRE-FINISHED OVERHEAD
COILING DOOR, TYP.
PRE-FINISHED METAL WALL
PANEL TO 8'-0" A.F.F.
SPRAY FOAM INSULATION WITH
THERMAL BARRIER
PRE-FINISHED METAL WALL
PANEL TO 8'-0" A.F.F.
A.502
A.502
Sim
O.H.
B.O. HIGH WINDOW
126' - 0"
110 109 108 107
105A110A111A109B
101B
BAY 4
BAY 3
BAY 2
BAY 1
101 105112
5" CONC. SLAB ON
VAPOR BARRIER ON
4" GRAVEL BASE ON
SUB BASE. RE: S.200
SELF SUPPORTING, ONE TON,
SINGLE BAY, OVERHEAD
BRIDGE CRANE
2-PERSON, SUSPENDED
FALLARREST MONORAIL
SYSTEM, BRACE RAIL TO
STRUCTURE ABOVE 8'-0" O.C
PEMB ROOF
INSULATION W/ LINER
FINISH FLOOR
100' - 0"
EAVE
130' - 0"
RIDGE
136' - 9"
A.501
PRE-FINISHED METAL WALL PANEL
BY PEMB MANUFACTURER, TYP.
PRE-FINISHED METAL
ROOF PANELS BY PEMB
MANUFACTURER, TYP.
PRE-FINISHED METAL
GUTTER & DOWNSPOUTS, TYP.
PRE-FINISHED METAL WALL PANEL
BY PEMB MANUFACTURER, TYP.
PRE-FINISHED OVERHEAD
COILING DOOR, TYP.
SPRAY FOAM INSULATION WITH
THERMAL BARRIER
PRE-FINISHED METAL WALL
PANEL TO 8'-0" A.F.F.
RIGID FRAME BY PEMB MANUFACTURER.
A.502
A.502
Sim
PRE-FINISHED OVERHEAD
COILING DOOR, TYP.
PRE-FINISHED METAL ROOF PANELS
BY PEMB MANUFACTURER, TYP.
B.O. WINDOW
120' - 0"
B.O. HIGH WINDOW
126' - 0"
101B101A
112 111BAY 1
5" CONC. SLAB ON
VAPOR BARRIER ON
4" GRAVEL BASE ON
SUB BASE. RE: S.200
PAVING. RE: CIVIL
SELF SUPPORTING, ONE TON,
SINGLE BAY, OVERHEAD
BRIDGE CRANE.
2-PERSON, SUSPENDED FALLARREST
MONORAIL SYSTEM, BRACE RAIL TO
STRUCTURE ABOVE 8'-0" O.C
< 8' MAX CENTERS
7' - 10 1/2"
PEMB ROOF
INSULATION W/ LINER 2
FINISH FLOOR
100' - 0"
EAVE
130' - 0"
RIDGE
136' - 9"
LOW EAVE
118' - 4"
A.501
PRE-FINISHED METAL ROOF PANELS
BY PEMB MANUFACTURER, TYP.
PRE-FINISHED METAL
GUTTER & DOWNSPOUTS, TYP.
PRE-FINISHED METAL WALL PANEL
BY PEMB MANUFACTURER, TYP.
PRE-FINISHED OVERHEAD
COILING DOOR, TYP.
SPRAY FOAM INSULATION WITH
THERMAL BARRIER
PRE-FINISHED METAL WALL
PANEL TO 8'-0" A.F.F.
PRE-FINISHED
METAL
GUTTER &
DOWNSPOUTS, TYP.
PRE-FINISHED METAL ROOF PANELS
BY PEMB MANUFACTURER, TYP.
SPRAY FOAM INSULATION WITH
THERMAL BARRIER
PRE-FINISHED METAL ROOF PANELS
BY PEMB MANUFACTURER, TYP.
PRE-FINISHED METAL WALL PANEL
BY PEMB MANUFACTURER, TYP.
SUSPENDED GYPSUM CEILING
10'-0" A.F.F., PAINTED TYP.
METAL DOOR &
METAL FRAME
(PAINTED)
A.502
Sim O.H.
A.502
A.502
B.O. WINDOW
120' - 0"
B.O. HIGH WINDOW
126' - 0"
102A
102C
112A
BAY 2
J.C.
SYSTEMS
ELECT.
GEN.
MAINT/STRG.
5" CONC. SLAB ON
VAPOR BARRIER ON
4" GRAVEL BASE ON
SUB BASE. RE: S.200
PEMB ROOF
INSULATION W/ LINER
FINISH FLOOR
100' - 0"
EAVE
130' - 0"
RIDGE
136' - 9"
LOW EAVE
118' - 4"
A.501
PRE-FINISHED METAL ROOF PANELS
BY PEMB MANUFACTURER, TYP.
PRE-FINISHED METAL
WALL PANEL
BY PEMB
MANUFACTURER, TYP.
SPRAY FOAM INSULATION WITH
THERMAL BARRIER
PRE-FINISHED METAL
GUTTER & DOWNSPOUTS, TYP.
PRE-FINISHED METAL ROOF PANELS
BY PEMB MANUFACTURER, TYP.
PRE-FINISHED METAL
ROOF PANELS BY PEMB
MANUFACTURER, TYP.
PRE-FINISHED METAL
GUTTER & DOWNSPOUTS, TYP.
PRE-FINISHED METAL WALL
PANEL BY PEMB
MANUFACTURER, TYP.
PRE-FINISHED OVERHEAD
COILING DOOR, TYP.
PRE-FINISHED METAL WALL
PANEL TO 8'-0" A.F.F.
METAL DOOR &
METAL FRAME (PAINTED)
RIGID FRAME BY PEMB
MANUFACTURER.
A.502
B.O. WINDOW
120' - 0"
B.O. HIGH WINDOW
126' - 0"
BAY 4
104102C
5" CONC. SLAB ON
VAPOR BARRIER ON
4" GRAVEL BASE ON
SUB BASE. RE: S.200
PAVING. RE: CIVIL
A.502
Sim
PEMB ROOF
INSULATION W/ LINER
DESIGNED
WORK ORDER NO.
DRAWN
OFFICE OF
ISSUED BY DATE:
PREPARED BY
REV DATE
APPROVED BY
DESCRIPTION APP'DCHECK
OF
ADD
DAP
2020-042069
REVIEWED BY
DRAWING NO.
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FACILITY MANAGEMENT
AMP-400
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
MSTB FACILITY
SMALL ARCHITECTS HAROLD STONG
100% FOR CONSTRUCTION SUBMISSION
1 3/18/22 RESPONSE TO 100% REVIEW COMMENTS
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a
"need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.
CONTRACT No. 6973GH-21-D-000044
BUILDING SECTIONS
A.501
November 23, 2022
31 75
1/8" = 1'-0"A.501
1 BUILDING SECTION 1 1/8" = 1'-0"A.501
2 BUILDING SECTION 4
1/8" = 1'-0"A.501
3 BUILDING SECTION 3
1/8" = 1'-0"A.501
4 BUILDING SECTION 2
FINISH FLOOR
100' - 0"
A.602
Sim
A.602
Sim
6" CONC. FILLED BOLLARD
18"
TYP.
SLAB ON GRADE
A.702
A.702
BAY 4
FINISH FLOOR
100' - 0"
EAVE
130' - 0"
A.601
Sim
A.601
Sim
A.602
Sim
O.H.
O.H.
A.602
Sim
A.702
A.F.F
18"
TYP.
B.O. WINDOW
120' - 0"
BAY 4
FINISH FLOOR
100' - 0"
LOW EAVE
118' - 4"
A.702
Sim
18"
TYP.
A.702
Sim
GEN.
MAINT/STRG.
FINISH FLOOR
100' - 0"
RIDGE
136' - 9"
A.602
Sim
A.602
Sim
A.601
Sim
A.601
SimO.H.
O.H.
A.702
Sim
A.702
Sim
18"
TYP.
B.O. HIGH WINDOW
126' - 0"
ARCHITECTURAL
STANDING SEAM
METAL ROOF PANELS
BAY 1
FINISH FLOOR
100' - 0"
RIDGE
136' - 9"
A.602
Sim
A.602
Sim
A.702
A.702
A.702
Sim
B.O. HIGH WINDOW
126' - 0"
J.C.
BAY 2
DESIGNED
WORK ORDER NO.
DRAWN
OFFICE OF
ISSUED BY DATE:
PREPARED BY
REV DATE
APPROVED BY
DESCRIPTION APP'DCHECK
OF
ADD
DAP
2020-042069
REVIEWED BY
DRAWING NO.
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FACILITY MANAGEMENT
AMP-400
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
MSTB FACILITY
SMALL ARCHITECTS HAROLD STONG
100% FOR CONSTRUCTION SUBMISSION
1 3/18/22 RESPONSE TO 100% REVIEW COMMENTS
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a
"need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.
CONTRACT No. 6973GH-21-D-000044
WALL SECTIONS
A.502
November 23, 2022
18 751/2" = 1'-0"A.502
1 WALL SECTION 1
1/2" = 1'-0"A.502
4 WALL SECTION 4
1/2" = 1'-0"A.502
5 WALL SECTION 5
1/2" = 1'-0"A.502
3 WALL SECTION 3
ARCHITECTURAL
STANDING SEAM
METAL ROOF PANELS
ARCHITECTURAL STANDING
SEAM METAL ROOF PANELS
PEMB FRAME
STEEL PURLIN
SPRAY FOAM
INSULATION WITH
THERMAL BARRIER
ARCHITECTURAL STANDING
SEAM METAL ROOF PANELS
LIGHT FIXTURE, RE:
ELECTRICAL
WINDOW, RE: A.603
ARCHITECTURAL
STANDING SEAM
METAL ROOF PANELS
STEEL PURLIN
SPRAY FOAM
INSULATION WITH
THERMAL BARRIER PEMB FRAME
PRE-FINISHED METAL
WALL PANEL, TYP.
(COLOR TBD.)
WALL MOUNTED FIRE
EXTINGUISHER
SLAB ON GRADE
1/2" = 1'-0"A.502
2 WALL SECTION 2
PEMB FRAME
ARCHITECTURAL STANDING
SEAM METAL ROOF PANELS
PEMB FRAME
PEMB FRAME
PEMB FRAME
METAL SYUD WALL
WITH GYPSUM WALL
BOARD FINSIH
(PAINTED) RE:
WALL TYPES
RUBBER BASE COVE,
RE: SCHEDULE
SUSPENDED
GYPSUM CEILING,
(PAINTED) RE:
CEILING PLAN
CONC. FOOTING, RE: STRUCTURAL
CONC. FOOTING,
RE: STRUCTURAL
STEEL PURLIN
SPRAY FOAM
INSULATION WITH
THERMAL BARRIER
(BEYOND)
OPEN
SLAB ON GRADE
PRE-FINISHED METAL
WALL PANEL, TYP.
(COLOR TBD.)
PRE-FINISHED METAL
WALL PANEL, TYP.
(COLOR TBD.)
PRE-FINISHED METAL
WALL PANEL, TYP.
(COLOR TBD.)VF-2 (BEYOND, RE:
MECHANICAL
PRE-FINISHED PEMB
CLOSURE TRIM,
COLOR TBD
PRE-FINISHED METAL
GUTTER AND
DOWNSPOUTS, COLOR
TBD
PRE-FINISHED METAL
GUTTER AND
DOWNSPOUTS, COLOR
TBD
LIGHT FIXTURE, RE:
ELECTRICAL
PRE-FINISHED METAL
WALL PANEL, TYP.
(COLOR TBD.)
LIGHT FIXTURE, RE:
ELECTRICAL
O.H. DOOR, RE:
SCHEDULE
6" CONC. FILLED
BOLLARD
CONC. SPLASH
BLOCK (BEYOND)
ARCHITECTURAL STANDING
SEAM METAL ROOF PANELS
O.H. CRANE
FRAME (BEYOND)
RE: PLAN
WALL MOUNTED FIRE
EXTINGUISHER
SPRAY FOAM
INSULATION WITH
THERMAL BARRIER
(BEYOND)
SPRAY FOAM INSULATION
WITH THERMAL BARRIER
(BEYOND)
STEEL PURLIN
PRE-FINISHED METAL
GUTTER AND
DOWNSPOUTS, COLOR
TBD
6" CONC. FILLED
BOLLARD
CONC. FOOTING,
RE: STRUCTURAL
CONC. FOOTING,
RE: STRUCTURAL
6" CONC. FILLED
BOLLARD
STEEL PURLIN
PRE-FINISHED
METAL WALL
PANEL AND FURR-
OUT, COLOR TBD
PRE-FINISHED
METAL WALL
PANEL AND FURR-
OUT, COLOR TBD
O.H. CRANE
FRAME (BEYOND)
RE: PLAN
O.H. CRANE
FRAME BASE
SPRAY FOAM
INSULATION WITH
THERMAL BARRIER
MOP SINK, RE
MECHANICAL
O.H.
SPRAY FOAM
INSULATION WITH
THERMAL BARRIER
O.H. DOOR, RE:
SCHEDULE
O.H. DOOR, HOUSING, RE:
MANUFACTURER
PEMB ROOF
INSULATION W/
LINER
PEMB ROOF
INSULATION
W/ LINER
PEMB ROOF
INSULATION
PEMB ROOF
INSULATION W/
LINER
PEMB ROOF
INSULATION W/
LINER
PEMB ROOF
INSULATION
W/ LINER
PRE-FINISHED METAL PANEL TO 8'-0"
A.F.F. AT INTERIOR (COLOR TBD)
CONC. SLAB ON SPECIFIED BASE,
RE: STRUCTURAL
STEEL RE-INFORCING,
RE: STRUCTURAL
PRE-FINISHED METAL PANEL (COLOR
TBD)
METAL STUD FRAMING
NOTCH CONCRETE,
CONTRACTOR COORDINATE
WITH METAL PEMB ERECTOR
FINISHED GRADE, RE: CIVIL
CONC. FOOTING, RE: STRUCTURAL
DRAWING FOR FOUNDATION DETAIL
PEMB STEEL FRAME
PRE-FINISHED METAL
WALL PANEL (COLOR
TBD)
SPRAY FOAM
INSULATION WITH
THERMAL BARRIER
PEMB PRE-FINISHED
METAL CLOSURE
TRIM (COLOR TBD)
INSIDE CLOSURE,
TAPED TOP AND
BOTTOM OF PANEL
VF-2 (BEYOND), RE:
MECHANICAL
METAL ROOF PANEL,
TYP. COLOR: BRONZE
PEMB STEEL PURLIN
PEMB STEEL ANGLE
PEMB ROOF
INSULATION W/
LINER
PEMB STEEL
FRAME (BEYOND)
PEMB EAVE STRUT
STEEL PURLIN
PRE-FINISHED METAL
WALL PANEL (COLOR
TBD)
SPRAY FOAM
INSULATION WITH
THERMAL BARRIER
STEEL PURLIN
METAL ROOF PANEL, TYP.
COLOR: BRONZE
PEMB CLOSURE
METAL
INSIDE CLOSURE,
TAPED TOP AND
BOTTOM OF PANEL
PEMB ROOF
INSUATION W/ LINER
STEEL PURLIN
PEMB FRAME
(BEYOND)
METAL ROOF PANEL, TYP.
COLOR: BRONZE
INSIDE CLOSURE
TAPE
METAL GUTTER AND DOWN
SPOUTS, (PAINTED) TYP.
COLOR: COBBLE BROWN
(SW#6082)
PRE-FINISHED
METAL WALL PANEL
(COLOR TBD)
SPRAY FOAM
INSULATION WITH
THERMAL BARRIER
STEEL PURLIN
PRE-FINISHED GUTTER
CLIP, 24" O.C.
PEMB ROOF
INSULATION
W/LINER
STEEL PURLIN
PEMB FRAME
(BEYOND)
METAL ROOF PANEL,
TYP. COLOR: BRONZE
INSIDE CLOSURE
TAPE
PRE-FINISHED
METAL WALL PANEL
(COLOR TBD)
PRE-FINISHED
METAL WALL PANEL
(COLOR TBD)
SPRAY FOAM
INSULATION WITH
THERMAL BARRIER
PEMB ROOF
INSULATION W/
LINER
PRE-FINISHED METAL
WALL PANEL (BEYOND)
5/8" GYPSUM, WALL BOARD
(PAINTED) (BEYOND)
RUBBER BASE COVE (BEYOND)
RE: SCHEDULE
PEMB STEEL COLUMN
STEEL RE-INFORCING, RE: STRUCTURAL
CONC. SLAB ON SPECIFIED BASE,
RE: STRUCURAL
CONC. FOOTING, RE:
STRUCTURAL DRAWING FOR
FOUNDATION DETAIL
DESIGNED
WORK ORDER NO.
DRAWN
OFFICE OF
ISSUED BY DATE:
PREPARED BY
REV DATE
APPROVED BY
DESCRIPTION APP'DCHECK
OF
ADD
DAP
2020-042069
REVIEWED BY
DRAWING NO.
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FACILITY MANAGEMENT
AMP-400
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
MSTB FACILITY
SMALL ARCHITECTS HAROLD STONG
100% FOR CONSTRUCTION SUBMISSION
1 3/18/22 RESPONSE TO 100% REVIEW COMMENTS
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a
"need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.
CONTRACT No. 6973GH-21-D-000044
SECTION DETAILS
A.702
November 23, 2022
36 75
1 1/2" = 1'-0"A.702
1 DETAIL SECTION - CONC. FOOTING
1 1/2" = 1'-0"A.702
2 DETAIL SECTION - LOWER RAKE
1 1/2" = 1'-0"A.702
3 DETAIL SECTION - HIGH RIDGE
1 1/2" = 1'-0"A.702
4 DETAIL SECTION - EAVE & GUTTER
1 1/2" = 1'-0"A.702
6 DETAIL SECTION - LOW EVE
1 1/2" = 1'-0"A.702
DETAIL SECTION - MID-SLAB
FOOTING
GENERAL NOTES:
1. ROOF PANLE COLOR TO BE CHOSEN FROM MANUFACTURER'S STANDARD COLOR SELECTION.
2. PAINTED METAL (DOORS, WINDOW FRAMES, EXPOSED STEEL STRUCTURE) COLOR: COBBLE BROWN (SW#6082).
OWNER MAY CHOOSE ALTERNATE COLOR FROM SHERWIN WILLIAMS COLOR SELECTIONS
3. WALL PANEL COLOR BE CHOSEN FROM MANUFACTURER'S STANDARD COLOR SELECTION.
4. METAL BUILDING TRIM COLOR TO BE CHOSEN FROM STANDARD MANUFACTURER'S COLOR SELECTION.
5. MECHANICAL LOUVER COLOR TO BE CHOSEN FROM MANUFACTURER'S STANDARD COLRO SELECTION.
W.O. 2020-042069 / FAA-MMAC
Mobile Systems Test Bed Facility
(MSTB)
13.34.19 - 1 METAL BUILDING
SYSTEMS
ADDENDUM-02
SECTION 13.34.19
METAL BUILDING SYSTEMS
PART 1 - GENERAL
1.01 SUMMARY
A. Section Includes:
1. Structural-steel framing.
2. Metal roof panels.
3. Metal wall panels.
4. Metal soffit panels.
5. Thermal insulation.
6. Personnel doors and frames.
7. Windows.
8. Accessories.
1.02 ACTION SUBMITTALS
A. Product Data: For each type of metal building system component.
B. Shop Drawings: Indicate components by others. Include full building plan, elevations, sections, details and attachments to other work.
C. Samples: For units with factory-applied finishes.
D. Delegated-Design Submittal: For metal building systems.
1. Include analysis data indicating compliance with performance requirements and design data signed and sealed by the qualified professional engineer responsible for their preparation.
1.03 INFORMATIONAL SUBMITTALS
A. Welding certificates.
B. Letter of Design Certification: Signed and sealed by a qualified professional engineer. Include the following:
1. Name and location of Project.
2. Order number.
3. Name of manufacturer.
4. Name of Contractor.
5. Building dimensions including width, length, height, and roof slope.
6. Indicate compliance with AISC standards for hot-rolled steel and AISI standards for cold-rolled steel, including edition dates of each standard.
7. Governing building code and year of edition.
8. Design Loads: Include dead load, roof live load, collateral loads, roof snow load, deflection, wind loads/speeds and exposure, seismic design category or effective peak velocity-related acceleration/peak acceleration, and auxiliary loads (cranes).
9. Load Combinations: Indicate that loads were applied acting simultaneously with concentrated loads, according to governing building code.
10. Building-Use Category: Indicate category of building use and its effect on load importance factors.
C. Material test reports.
D. Source quality-control reports.
E. Field quality-control reports.
F. Sample warranties.
1.04 CLOSEOUT SUBMITTALS
A. Maintenance data.
(MSTB)
13.34.19 - 2 METAL BUILDING
1.05 QUALITY ASSURANCE
A. Manufacturer Qualifications: A qualified manufacturer.
1. Accreditation: Manufacturer's facility accredited according to the International Accreditation Service's AC472, "Accreditation Criteria for Inspection Programs for Manufacturers of Metal Building Systems."
2. Engineering Responsibility: Preparation of comprehensive engineering analysis and Shop Drawings by a professional engineer who is legally qualified to practice in jurisdiction where Project is located.
B. Erector Qualifications: An experienced erector who specializes in erecting and installing work similar in material, design, and extent to that indicated for this Project and who is acceptable to manufacturer.
C. Welding Qualifications: Qualify procedures and personnel according to the following:
1. AWS D1.1/D1.1M, "Structural Welding Code - Steel."
2. AWS D1.3, "Structural Welding Code - Sheet Steel."
1.06 WARRANTY
A. Special Warranty on Metal Panel Finishes: Manufacturer agrees to repair finish or replace metal panels that show evidence of deterioration of factory-applied finishes within specified warranty period.
1. Finish Warranty Period: 20 years from date of Substantial Completion.
B. Special Weathertightness Warranty for Standing-Seam Metal Roof Panels: Manufacturer agrees to repair or replace standing-seam metal roof panel assemblies that leak or otherwise fail to remain weathertight within specified warranty period.
1. Warranty Period: 20 years from date of Substantial Completion.
C. Roof Panels shall be guaranteed against material performance for a period of 20 years.
PART 2 - PRODUCTS
2.01 MANUFACTURERS
A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
1. A&S Building Systems, Inc.; Division of NCI Building Systems, L.P.
2. Alliance Steel, Inc.
3. American Buildings Company; Division of Magnatrax Corp.
4. American Steel Building Co., Inc.
5. BC Steel Buildings, Inc.
6. Behlen Mfg. Co.
7. Bigbee Steel Buildings, Inc.
8. Butler Manufacturing Company; a BlueScope Steel company.
9. CBC Steel Buildings; Division of Magnatrax Corp.
10. Ceco Building Systems; Division of NCI Building Systems, L.P.
11. Chief Buildings; Division of Chief Industries, Inc.
12. Elite Structures, Inc.
13. Garco Building Systems; Division of NCI Building Systems, L.P.
14. Gulf States Manufacturers, Inc.; Division of Magnatrax Corp.
15. Inland Buildings; Subsidiary of Behlen Mfg. Co.
16. Kirby Building Systems; Division of Magnatrax Corp.
17. Mesco Building Solutions; Division of NCI Building Systems, L.P.
18. Metallic Building Company; Division of NCI Building Systems, L.P.
19. Metco Metal Supply.
(MSTB)
13.34.19 - 3 METAL BUILDING
20. Mid-West Steel Building Company; Division of NCI Building Systems, L.P.
21. Nucor Building Systems.
22. Oakland Metal Buildings, Inc.
23. Olympia Steel Building Systems.
24. Package Industries, Inc.
25. Pinnacle Structures, Inc.
26. Robertson Building Systems; an NCI company.
27. Ruffin Building Systems, Inc.
28. Schulte Building Systems, LLP.
29. Spirco Manufacturing.
30. Star Building Systems; an NCI company.
31. Tyler Building Systems, L.P.
32. USA, Inc.
33. VP Buildings; a United Dominion company.
34. Vulcan Steel Structures, Inc.
35. Whirlwind Building Systems.
2.02 PERFORMANCE REQUIREMENTS
A. Delegated Design: Engage a qualified professional engineer, as defined in Section 01.40.00 "Quality Requirements," to design metal building system.
B. Structural Performance: Metal building systems shall withstand the effects of gravity loads and the following loads and stresses within limits and under conditions indicated according to procedures in MBMA's "Metal Building Systems Manual."
1. Design Loads: As indicated on Drawings
2. Deflection and Drift Limits: Design metal building system assemblies to withstand serviceability design loads without exceeding deflections and drift limits recommended in AISC Steel Design Guide No. 3 "Serviceability Design Considerations for Steel Buildings."
3. Deflection and Drift Limits: No greater than the following:
a. Purlins and Rafters: Vertical deflection of 1/180 of the span.
b. Girts: Horizontal deflection of 1/120 of the span.
c. Metal Roof Panels: Vertical deflection of 1/150 of the span.
d. Metal Wall Panels: Horizontal deflection of 1/180 of the span.
e. Design secondary-framing system to accommodate deflection of primary framing and construction tolerances, and to maintain clearances at openings.
f. Lateral Drift: Maximum of 1/120 of the building height.
C. Seismic Performance: Metal building system shall withstand the effects of earthquake motions determined according to ASCE/SEI 7
D. Thermal Movements: Allow for thermal movements from ambient and surface temperature changes by preventing buckling, opening of joints, overstressing of components, failure of joint sealants, failure of connections, and other detrimental effects. Base calculations on surface temperatures of materials due to both solar heat gain and nighttime-sky heat loss.
1. Temperature Change: 120 deg F ambient; 180 deg F material surfaces
E. Fire-Resistance Ratings: Where assemblies are indicated to have a fire-resistance rating, provide metal panel assemblies identical to those of assemblies tested for fire resistance per ASTM E119 or ASTM E108 by a qualified testing agency. Identify products with appropriate markings of applicable testing agency.
1. Indicate design designations from UL's "Fire Resistance Directory," FM Global's "Approval Guide," or from the listings of another qualified testing agency.
F. Fire-Rated Door Assemblies: Assemblies complying with NFPA 80 that are listed and labeled by a qualified testing agency, for fire-protection ratings indicated, based on testing at positive pressure according to NFPA 252 or UL 10C.
(MSTB)
13.34.19 - 4 METAL BUILDING
1. Oversize Fire-Rated Door Assemblies: For units exceeding sizes of tested assemblies, provide certification by a qualified testing agency that doors comply with standard construction requirements for tested and labeled fire-rated door assemblies except for size.
G. Structural Performance for Metal Roof and Wall Panels: Provide metal panel systems capable of withstanding the effects of the following loads, based on testing according to ASTM E1592:
1. Wind Loads: As indicated on Drawings.
H. Air Infiltration for Metal Roof Panels: Air leakage of not more than 0.06 cfm/sq. ft. (0.3 L/s per
sq. m) when tested according to ASTM E1680[ or ASTM E283] at the following test-pressure difference:
1. Test-Pressure Difference: 1.57 lbf/sq. ft. (75 Pa).
I. Air Infiltration for Metal Wall Panels: Air leakage of not more than 0.06 cfm/sq. ft. (0.3 L/s per
sq. m) when tested according to ASTM E283 at the following test-pressure difference:
1. Test-Pressure Difference: 1.57 lbf/sq. ft. (75 Pa).
J. Water Penetration for Metal Roof Panels: No water penetration when tested according to ASTM E1646[ or ASTM E331] at the following test-pressure difference:
1. Test-Pressure Difference: [2.86 lbf/sq. ft. (137 Pa).
K. Water Penetration for Metal Wall Panels: No water penetration when tested according to ASTM E331 at the following test-pressure difference:
1. Test-Pressure Difference: [2.86 lbf/sq. ft. (137 Pa).
L. Wind-Uplift Resistance: Provide metal roof panel assemblies that comply with UL 580 for wind-uplift-resistance class indicated.
1. Uplift Rating: UL 90.
M. FM Global Listing: Provide metal roof panels and component materials that comply with requirements in FM Global 4471 as part of a panel roofing system and that are listed in FM Global's "Approval Guide" for Class 1 or noncombustible construction, as applicable. Identify materials with FM Global markings.
1. Fire/Windstorm Classification: Class 1A-120.
2. Hail Resistance: SH.
N. Energy Star Listing: Roof panels that are listed on the DOE's ENERGY STAR "Roof Products Qualified Product List" for low-slope roof products.
O. Energy Performance: Provide roof panels according to one of the following when tested according to CRRC-1:
1. Three-year, aged, solar reflectance of not less than 0.55 and emissivity of not less than 0.75.
2. Three-year, aged, Solar Reflectance Index of not less than 64 when calculated according to ASTM E1980.
P. Thermal Performance for Opaque Elements: Provide the following maximum U-factors and minimum R-values when tested according to ASTM C1363 or ASTM C518:
1. Roof:
a. U-Factor: 0.035
b. R-Value: R-19 + R-11LS
2. Walls:
a. U-Factor: U-0.079
b. R-Value: R-13 + R-6.5ci.
2.03 STRUCTURAL-STEEL FRAMING
A. Structural Steel: Comply with AISC 360, "Specification for Structural Steel Buildings."
(MSTB)
13.34.19 - 5 METAL BUILDING
B. Bolted Connections: Comply with RCSC's "Specification for Structural Joints Using High-Strength Bolts."
C. Cold-Formed Steel: Comply with AISI's "North American Specification for the Design of Cold- Formed Steel Structural Members" for design requirements and allowable stresses.
D. Primary Framing: Manufacturer's standard primary-framing system, designed to withstand required loads and specified requirements. Primary framing includes transverse and lean-to frames; rafters and rake beams; sidewall, intermediate, end-wall, and corner columns; and wind bracing.
1. General: Provide frames with attachment plates, bearing plates, and splice members.
Factory drill for field-bolted assembly. Provide frame span and spacing indicated.
a. Slight variations in span and spacing may be acceptable if necessary to comply with manufacturer's standard, as approved by Architect.
2. Frame Configuration: One-directional, sloped with Lean-to
3. Exterior Column: Tapered.
4. Rafter: Uniform depth.
E. End-Wall Framing: Manufacturer's standard primary end-wall framing fabricated for field-bolted assembly to comply with the following:
F. Secondary Framing: Manufacturer's standard secondary framing, including purlins, girts, eave struts, flange bracing, base members, gable angles, clips, headers, jambs, and other miscellaneous structural members. Unless otherwise indicated, fabricate framing from either cold-formed, structural-steel sheet or roll-formed, metallic-coated steel sheet, prepainted with coil coating, to comply with the following:
G. Anchor Rods: Headed anchor rods as indicated in Anchor Rod Plan for attachment of metal building to foundation.
2.04 METAL ROOF PANELS
A. Standing-Seam, Vertical-Rib, Metal Roof Panels : Formed with interlocking ribs at panel edges and intermediate stiffening ribs symmetrically spaced between ribs; designed for sequential installation by mechanically attaching panels to supports using concealed clips located under one side of panels and engaging opposite edge of adjacent panels. Basis of
Design: Alliance AS-24 Panel.
1. Material: Zinc-coated (galvanized) or aluminum-zinc alloy-coated steel sheet, 0.024-inch
(0.61-mm) nominal uncoated steel thickness. Prepainted by the coil-coating process to comply with ASTM A755/A755M.
a. Exterior Finish: Two-coat fluoropolymer.
b. Color: As selected by Architect from manufacturer's full range.
2. Clips: Two-piece floating to accommodate thermal movement.
3. Joint Type: Mechanically seamed.
4. Panel Coverage: 24 inches (914 mm).
5. Panel Height: 2 inches (51 mm).
2.05 METAL WALL PANELS
H. Exposed-Fastener, Tapered-Rib, Metal Wall Panels: Formed with raised, trapezoidal major ribs and flat pan between major ribs; designed to be installed by lapping side edges of adjacent panels and mechanically attaching panels to supports using exposed fasteners in side laps.
1. Material: Zinc-coated (galvanized) or aluminum-zinc alloy-coated steel sheet, 0.024-inch (0.61-mm) nominal uncoated steel thickness. Prepainted by the coil-coating process to comply with ASTM A755/A755M. Basis of Design: Alliance PBM Panel.
a. Exterior Finish: Two-coat fluoropolymer.
b. Color: As selected by Architect from manufacturer's full range.
(MSTB)
13.34.19 - 6 METAL BUILDING
2. Major-Rib Spacing: 6 inches (152 mm) o.c.
3. Panel Coverage: 36 inches (914 mm).
4. Panel Height: 0.75 inch (19 mm).
2.06 METAL SOFFIT PANELS
A. General: Provide factory-formed metal soffit panels designed to be installed by lapping and interconnecting side edges of adjacent panels and mechanically attaching through panel to supports using concealed fasteners[ and factory-applied sealant] in side laps. Include accessories required for weathertight installation.
B. Metal Soffit Panels: Match profile and material of metal wall panels.
1. Finish: Match finish and color of metal wall panels.
2.07 THERMAL INSULATION
1. Vapor-Retarder Facing: ASTM C1136, with permeance not greater than 0.02 perm when tested according to ASTM E96/E96M.
2.10 ACCESSORIES
B. General: Provide accessories as standard with metal building system manufacturer and as specified. Fabricate and finish accessories at the factory to greatest extent possible, by manufacturer's standard procedures and processes. Comply with indicated profiles and with dimensional and structural requirements.
1. Form exposed sheet metal accessories that are without excessive oil-canning, buckling, and tool marks and that are true to line and levels indicated, with exposed edges folded back to form hems.
A. Roof Panel Accessories: Provide components required for a complete metal roof panel assembly including copings, fasciae, corner units, ridge closures, clips, sealants, gaskets, fillers, closure strips, and similar items. Match material and finish of metal roof panels unless otherwise indicated.
B. Wall Panel Accessories: Provide components required for a complete metal wall panel assembly including copings, fasciae, mullions, sills, corner units, clips, sealants, gaskets, fillers, closure strips, and similar items. Match material and finish of metal wall panels unless otherwise indicated.
C. Flashing and Trim: Zinc-coated (galvanized) or aluminum-zinc alloy-coated steel sheet, 0.018-inch (0.46-mm) nominal uncoated steel thickness, prepainted with coil coating; finished to match adjacent metal panels.
D. Gutters: Zinc-coated (galvanized) or aluminum-zinc alloy-coated steel sheet, 0.018-inch (0.46-
mm) nominal uncoated steel thickness, prepainted with coil coating; finished to match roof fascia and rake trim. Match profile of gable trim, complete with end pieces, outlet tubes, and other special pieces as required. Fabricate in minimum 96-inch- (2438-mm-) long sections, sized according to SMACNA's "Architectural Sheet Metal Manual."
1. Gutter Supports: Fabricated from same material and finish as gutters.
2. Strainers: Bronze, copper, or aluminum wire ball type at outlets.
E. Downspouts: Zinc-coated (galvanized) or aluminum-zinc alloy-coated steel sheet, 0.018-inch (0.46-mm) nominal uncoated steel thickness, prepainted with coil coating; finished to match metal wall panels. Fabricate in minimum 10-foot- (3-m-) long sections, complete with formed elbows and offsets.
1. Mounting Straps: Fabricated from same material and finish as gutters.
2.11 FABRICATION
A. General: Design components and field connections required for erection to permit easy assembly.
(MSTB)
13.34.19 - 7 METAL BUILDING
1. Mark each piece and part of the assembly to correspond with previously prepared erection drawings, diagrams, and instruction manuals.
2. Fabricate structural framing to produce clean, smooth cuts and bends. Punch holes of proper size, shape, and location. Members shall be free of cracks, tears, and ruptures.
B. Tolerances: Comply with MBMA's "Metal Building Systems Manual" for fabrication and erection tolerances.
C. Primary Framing: Shop fabricate framing components to indicated size and section, with baseplates, bearing plates, stiffeners, and other items required for erection welded into place.
Cut, form, punch, drill, and weld framing for bolted field assembly.
D. Secondary Framing: Shop fabricate framing components to indicated size and section by roll forming or break forming, with baseplates, bearing plates, stiffeners, and other plates required for erection welded into place. Cut, form, punch, drill, and weld secondary framing for bolted field connections to primary framing.
E. Metal Panels: Fabricate and finish metal panels at the factory to greatest extent possible, by manufacturer's standard procedures and processes, as necessary to fulfill indicated performance requirements. Comply with indicated profiles and with dimensional and structural requirements.
1. Provide panel profile, including major ribs and intermediate stiffening ribs, if any, for full length of metal panel.
2.12 SOURCE QUALITY CONTROL
A. Special Inspection: Owner will engage a qualified special inspector to perform source quality control inspections and to submit reports.
1. Accredited Manufacturers: Special inspections will not be required if fabrication is performed by an IAS AC472-accredited manufacturer approved by authorities having jurisdiction to perform such Work without special inspection.
B. Product will be considered defective if it does not pass tests and inspections.
C. Prepare test and inspection reports.
PART 3 - EXECUTION
3.01 ERECTION OF STRUCTURAL FRAMING
A. Erect metal building system according to manufacturer's written instructions and drawings.
B. Do not field cut, drill, or alter structural members without written approval from metal building system manufacturer's professional engineer.
C. Set structural framing accurately in locations and to elevations indicated, according to AISC specifications referenced in this Section. Maintain structural stability of frame during erection.
D. Base and Bearing Plates: Clean concrete- and masonry-bearing surfaces of bond-reducing materials, and roughen surfaces prior to setting plates. Clean bottom surface of plates.
1. Set plates for structural members on wedges, shims, or setting nuts as required.
2. Tighten anchor rods after supported members have been positioned and plumbed. Do not remove wedges or shims but, if protruding, cut off flush with edge of plate before packing with grout.
3. Promptly pack grout solidly between bearing surfaces and plates so no voids remain.
Neatly finish exposed surfaces; protect grout and allow to cure. Comply with manufacturer's written installation instructions for shrinkage-resistant grouts.
E. Align and adjust structural framing before permanently fastening. Before assembly, clean bearing surfaces and other surfaces that will be in permanent contact with framing. Perform necessary adjustments to compensate for discrepancies in elevations and alignment.
1. Level and plumb individual members of structure.
(MSTB)
13.34.19 - 8 METAL BUILDING
2. Make allowances for difference between temperature at time of erection and mean temperature when structure will be completed and in service.
F. Primary Framing and End Walls: Erect framing level, plumb, rigid, secure, and true to line. Level baseplates to a true even plane with full bearing to supporting structures, set with double-nutted anchor bolts. Use grout to obtain uniform bearing and to maintain a level base-line elevation.
Moist-cure grout for not less than seven days after placement.
1. Make field connections using high-strength bolts installed according to RCSC's "Specification for Structural Joints Using High-Strength Bolts" for bolt type and joint type specified.
a. Joint Type: Snug tightened or pretensioned as required by manufacturer.
G. Secondary Framing: Erect framing level, plumb, rigid, secure, and true to line. Field bolt secondary framing to clips attached to primary framing.
1. Provide rake or gable purlins with tight-fitting closure channels and fasciae.
2. Locate and space wall girts to suit openings such as doors and windows.
3. Provide supplemental framing at entire perimeter of openings, including doors, windows, ventilators, and other penetrations of roof and walls.
H. Bracing: Install bracing in roof and sidewalls where indicated on erection drawings.
1. Tighten rod and cable bracing to avoid sag.
2. Locate interior end-bay bracing only where indicated.
I. Framing for Openings: Provide shapes of proper design and size to reinforce openings and to carry loads and vibrations imposed, including equipment furnished under mechanical and electrical work. Securely attach to structural framing.
J. Erection Tolerances: Maintain erection tolerances of structural framing within AISC 303.
3.02 METAL PANEL INSTALLATION, GENERAL
A. General: Anchor metal panels and other components of the Work securely in place, with provisions for thermal and structural movement.
1. Field cut metal panels as required for doors, windows, and other openings. Cut openings as small as possible, neatly to size required, and without damage to adjacent metal panel finishes.
a. Field cutting of metal panels by torch is not permitted unless approved in writing by manufacturer.
2. Install metal panels perpendicular to structural supports unless otherwise indicated.
3. Flash and seal metal panels with weather closures at perimeter of openings and similar elements. Fasten with self-tapping screws.
4. Locate and space fastenings in uniform vertical and horizontal alignment.
5. Locate metal panel splices over structural supports with end laps in alignment.
6. Lap metal flashing over metal panels to allow moisture to run over and off the material.
B. Lap-Seam Metal Panels: Install screw fasteners using power tools with controlled torque adjusted to compress EPDM washers tightly without damage to washers, screw threads, or metal panels.
Install screws in predrilled holes.
1. Arrange and nest side-lap joints so prevailing winds blow over, not into, lapped joints. Lap ribbed or fluted sheets one full rib corrugation. Apply metal panels and associated items for neat and weathertight enclosure. Avoid "panel creep" or application not true to line.
C. Metal Protection: Where dissimilar metals contact each other or corrosive substrates, protect against galvanic action by painting contact surfaces with corrosion-resistant coating, by applying rubberized-asphalt underlayment to each contact surface, or by other permanent separation as recommended by metal roof panel manufacturer.
(MSTB)
13.34.19 - 9 METAL BUILDING
D. Joint Sealers: Install gaskets, joint fillers, and sealants where indicated and where required for weatherproof performance of metal panel assemblies. Provide types of gaskets, fillers, and sealants indicated; or, if not indicated, provide types recommended by metal panel manufacturer.
1. Seal metal panel end laps with double beads of tape or sealant the full width of panel. Seal side joints where recommended by metal panel manufacturer.
2. Prepare joints and apply sealants to comply with requirements in Section 079200 "Joint Sealants."
3.03 METAL ROOF PANEL INSTALLATION
A. General: Provide metal roof panels of full length from eave to ridge unless otherwise indicated or restricted by shipping limitations.
1. Install ridge caps as metal roof panel work proceeds.
2. Flash and seal metal roof panels with weather closures at eaves and rakes. Fasten with self-tapping screws.
B. Standing-Seam Metal Roof Panels: Fasten metal roof panels to supports with concealed clips at each standing-seam joint, at location and spacing and with fasteners recommended by manufacturer.
1. Install clips to supports with self-drilling or self-tapping fasteners.
2. Install pressure plates at locations indicated in manufacturer's written installation instructions.
3. Snap Joint: Nest standing seams and fasten together by interlocking and completely engaging factory-applied sealant.
4. Seamed Joint: Crimp standing seams with manufacturer-approved motorized seamer tool so that clip, metal roof panel, and factory-applied sealant are completely engaged.
5. Rigidly fasten eave end of metal roof panels and allow ridge end free movement for thermal expansion and contraction. Predrill panels for fasteners.
6. Provide metal closures at peaks, rake edges, rake walls, and each side of ridge caps.
C. Lap-Seam Metal Roof Panels: Fasten metal roof panels to supports with exposed fasteners at each lapped joint, at location and spacing recommended by manufacturer.
1. Provide metal-backed sealing washers under heads of exposed fasteners bearing on weather side of metal roof panels.
2. Provide sealant tape at lapped joints of metal roof panels and between panels and protruding equipment, vents, and accessories.
3. Apply a continuous ribbon of sealant tape to weather-side surface of fastenings on end laps and on side laps of nesting-type metal panels, on side laps of ribbed or fluted metal panels, and elsewhere as needed to make metal panels weatherproof to driving rains.
4. At metal panel splices, nest panels with minimum 6-inch end lap, sealed with butyl-rubber sealant and fastened together by interlocking clamping plates.
D. Metal Fascia Panels: Align bottom of metal panels and fasten with blind rivets, bolts, or self-drilling or self-tapping screws. Flash and seal metal panels with weather closures where fasciae meet soffits, along lower panel edges, and at perimeter of all openings.
3.04 METAL WALL PANEL INSTALLATION
A. General: Install metal wall panels in orientation, sizes, and locations indicated on Drawings. Install panels perpendicular to girts, extending full height of building, unless otherwise indicated. Anchor metal wall panels and other components of the Work securely in place, with provisions for thermal and structural movement.
1. Unless otherwise indicated, begin metal panel installation at corners with center of rib lined up with line of framing.
2. Shim or otherwise plumb substrates receiving metal wall panels.
(MSTB)
13.34.19 - 10 METAL BUILDING
3. When two rows of metal panels are required, lap panels 4 inches minimum.
4. When building height requires two rows of metal panels at gable ends, align lap of gable panels over metal wall panels at eave height.
5. Rigidly fasten base end of metal wall panels and allow eave end free movement for thermal expansion and contraction. Predrill panels.
6. Flash and seal metal wall panels with weather closures at eaves and rakes, and at perimeter of all openings. Fasten with self-tapping screws.
7. Install screw fasteners in predrilled holes.
8. Install flashing and trim as metal wall panel work proceeds.
9. Apply elastomeric sealant continuously between metal base channel (sill angle) and concrete, and elsewhere as indicated on Drawings; if not indicated, as necessary for waterproofing.
10. Align bottom of metal wall panels and fasten with blind rivets, bolts, or self-drilling or self-tapping screws.
11. Provide weatherproof escutcheons for pipe and conduit penetrating exterior walls.
B. Metal Wall Panels: Install metal wall panels on exterior side of girts. Attach metal wall panels to supports with fasteners as recommended by manufacturer.
3.05 METAL SOFFIT PANEL INSTALLATION
A. Provide metal soffit panels the full width of soffits. Install panels perpendicular to support framing.
B. Flash and seal metal soffit panels with weather closures where panels meet walls and at perimeter of all openings.
3.06 THERMAL INSULATION INSTALLATION
A. General: Install insulation concurrently with metal panel installation, in thickness indicated to cover entire surface, according to manufacturer's written instructions.
1. Set vapor-retarder-faced units with vapor retarder toward warm side of construction unless otherwise indicated. Do not obstruct ventilation spaces except for firestopping.
2. Tape joints and ruptures in vapor retarder, and seal each continuous area of insulation to the surrounding construction to ensure airtight installation.
3. Install factory-laminated, vapor-retarder-faced blankets straight and true in one-piece lengths, with both sets of facing tabs sealed, to provide a complete vapor retarder.
4. Install blankets straight and true in one-piece lengths. Install vapor retarder over insulation, with both sets of facing tabs sealed, to provide a complete vapor retarder.
B. Blanket Roof Insulation: Comply with the following installation method:
1. Over-Framing Installation: Extend insulation and vapor retarder over and perpendicular to top flange of secondary framing. Hold in place by metal roof panels fastened to secondary framing.
2. Between-Purlin Installation: Extend insulation and vapor retarder between purlins. Carry vapor-retarder-facing tabs up and over purlin, overlapping adjoining facing of next insulation course and maintaining continuity of retarder. Hold in place with bands and crossbands below insulation.
3. Over-Purlin-with-Spacer-Block Installation: Extend insulation and vapor retarder over and perpendicular to top flange of secondary framing. Install layer of filler insulation over first layer to fill space formed by metal roof panel standoffs. Hold in place by panels fastened to standoffs.
a. Thermal Spacer Blocks: Where metal roof panels attach directly to purlins, install thermal spacer blocks.
4. Two-Layers-between-Purlin-with-Spacer-Block Installation: Extend insulation and vapor retarder between purlins. Carry vapor-retarder-facing tabs up and over purlin, overlapping
(MSTB)
13.34.19 - 11 METAL BUILDING
adjoining facing of next insulation course and maintaining continuity of retarder. Install layer of filler insulation over first layer to fill space between purlins formed by thermal spacer blocks. Hold in place with bands and crossbands below insulation.
a. Thermal Spacer Blocks: Where metal roof panels attach directly to purlins, install thermal spacer blocks.
5. Retainer Strips: Install retainer strips at each longitudinal insulation joint, straight and taut, nesting with secondary framing to hold insulation in place.
3.07 DOOR AND FRAME INSTALLATION
A. General: Install doors and frames plumb, rigid, properly aligned, and securely fastened in place according to manufacturers' written instructions. Coordinate installation with wall flashings and other components. Seal perimeter of each door frame with elastomeric sealant used for metal wall panels.
B. Personnel Doors and Frames: Install doors and frames according to NAAMM-HMMA 840.
1. At fire-rated openings, install frames according to, and doors with clearances specified in, NFPA 80.
C. Field Glazing: Comply with installation requirements in Section 088000 "Glazing."
D. Door Hardware:
1. Install surface-mounted items after finishes have been completed at heights indicated in DHI's "Recommended Locations for Architectural Hardware for Standard Steel Doors and Frames."
2. Set units level, plumb, and true to line and location. Adjust and reinforce attachment substrates as necessary for proper installation and operation.
3. Drill and countersink units that are not factory prepared for anchorage fasteners. Space fasteners and anchors according to industry standards.
4. Set thresholds for exterior doors in full bed of sealant complying with requirements for concealed mastics specified in Section 079200 "Joint Sealants.
3.08 WINDOW INSTALLATION
A. General: Install windows plumb, rigid, properly aligned, without warp or rack of frames or sash, and securely fasten in place according to manufacturer's written instructions. Coordinate installation with wall flashings and other components. Seal perimeter of each window frame with elastomeric sealant used for metal wall panels.
1. Separate dissimilar materials from sources of corrosion or electrolytic action at points of contact with other materials by complying with requirements specified in
AAMA/WDMA/CSA 101/I.S.2/A440.
B. Set sill members in bed of sealant or with gaskets, for weathertight construction.
C. Install windows and components to drain condensation, water penetrating joints, and moisture migrating within windows to the exterior.
D. Mount screens directly to frames with tapped screw clips.
3.09 ACCESSORY INSTALLATION
A. General: Install accessories with positive anchorage to building and weathertight mounting, and provide for thermal expansion. Coordinate installation with flashings and other components.
1. Install components required for a complete metal roof panel assembly, including trim, copings, ridge closures, seam covers, flashings, sealants, gaskets, fillers, closure strips, and similar items.
(MSTB)
13.34.19 - 12 METAL BUILDING
2. Install components for a complete metal wall panel assembly, including trim, copings, corners, seam covers, flashings, sealants, gaskets, fillers, closure strips, and similar items.
3. Where dissimilar metals contact each other or corrosive substrates, protect against galvanic action by painting contact surfaces with corrosion-resistant coating, by applying rubberized-asphalt underlayment to each contact surface, or by other permanent separation as recommended by manufacturer.
B. Flashing and Trim: Comply with performance requirements, manufacturer's written installation instructions, and SMACNA's "Architectural Sheet Metal Manual." Provide concealed fasteners where possible, and set units true to line and level. Install work with laps, joints, and seams that will be permanently watertight and weather resistant.
1. Install exposed flashing and trim that is without excessive oil-canning, buckling, and tool marks and that is true to line and levels indicated, with exposed edges folded back to form hems. Install sheet metal flashing and trim to fit substrates and to result in waterproof and weather-resistant performance.
2. Expansion Provisions: Provide for thermal expansion of exposed flashing and trim. Space movement joints at a maximum of 10 feet (3 m) with no joints allowed within 24 inches (600
mm) of corner or intersection. Where lapped or bayonet-type expansion provisions cannot be used or would not be sufficiently weather resistant and waterproof, form expansion joints of intermeshing hooked flanges, not less than 1 inch (25 mm) deep, filled with…
This is the start of the file's text. The full file is on GovTribe.