This is a bid tabulation document for a construction project managed by the State of Utah's Division of Facilities Construction and Management (DFCM) for the Department of Natural Resources. The project, identified as CR27012-27302500, involves electrical upgrades at Scofield Shed that include installation of a new generator, a new exterior building structure, lighting improvements, and an upgrade to the existing photovoltaic system. A new weather-protective enclosure will be constructed around the generator. The project has a construction cost estimate of $76,000.00 and a completion date of November 9, 2026. This was an invitational bid process limited to five pre-selected contractors: Gladwell Construction, Rod Lewis Construction, Slider Construction, Strong Solutions LLC, and Xcel General Contracting.

Three contractors submitted bids in the following order: Rod Lewis Construction, LLC ($264,693.00), Slider Construction, Inc. ($256,736.00), and Xcel General Contracting ($178,176.00). Scofield Shed Solar Power & Generators did not submit a bid. All bids were submitted for the base bid per plans and specifications with no additive alternates accepted. The bid tabulation assigns a bid order ranking of 3, 2, and 1 respectively. The document notes that DFCM reserves the right to award only the base bid or the base bid plus alternates in listed order at its discretion, and that the bid tabulation is not an award notification. A liquidated damages clause of $50.00 per day is specified.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

*Please note: This is document is not an award notification.

Bids are listed left to right in the order they were submitted.

U3P Event # CR27012- DFCM Project # 27302500

Rod Lewis Construction, LLC Slider Construction, Inc. XCEL General Contracting

Scofield Shed Solar Power & Generators $264,693.00 $256,736.00 $178,176.00

Completion Date: 11/09/2026 $0.00 $0.00 $0.00

Construction Budget: $76,000.00 LD: $50.00 $ 0 $ 0 $ 0

Base Bid: Per Plans and Specs $ 264,693.0 $ 256,736.0 $ 178,176.0

Bid Order (base bid + all alternates, if applicable): 3 2 1 Important note regarding Bid Order: The bid order provided above includes the base bid and all additive alternate prices, when applicable, DFCM has requested. Accepted additive alternates, when applicable, will be at the discretion of DFCM after bids are received, which may affect the initial bid order. DFCM reserves the right to award only the base bid, or the base bid plus one or more alternates in the order they have been listed.