7-Contractor Qualifications.pdf

PDF 177 KB Posted

Attached to
Driveway and Paving Improvements for Arlington Fire Department Station 15
Solicitation number
Construction SB 26-0151 and CMFD25001
Issued by
Tarrant County, Arlington City, Texas

About this file

This is a contractor qualifications document for the City of Arlington, Texas, related to a driveway and paving improvements project at Arlington Fire Department Station 15, located at 906 Eden Road, Arlington, TX 76001. The project scope includes removal and disposal of existing concrete pavement, sidewalks, and curbs, followed by replacement with new concrete pavement, sidewalks, and curbs, including preparation and installation of required base and subgrade materials. All work must be completed in accordance with project plans and specifications prepared by Simon Engineering & Consulting, dated February 11, 2026. The City of Arlington strongly encourages electronic bid submission, with paper bids requiring submission in a sealed envelope labeled with company name, solicitation number, and title. Late bids will not be accepted, and all solicitations are disseminated exclusively through Euna Procurement; bids received through other means may be non-compliant due to incomplete specifications or addendums.

General contractor organizations must demonstrate capability to perform the proposed construction and provide evidence of consistently and satisfactorily completing public and private facility construction projects of similar scope, complexity, and size over the past five years or the company's entire history if less than five years old. Contractors must submit completed Company Project History forms listing all municipal projects from the past five years, resumes of the proposed project superintendent including educational and work experience with detailed descriptions of completed public and private projects from the last five years, and a questionnaire from the general contractor and all major subcontractors involved in turf establishment, tree transplanting, tree installation, grading, irrigation installation, utility installation, paving construction, and playground equipment installation. If the project includes public water, sewer, or street construction, applicable contractors or subcontractors must be listed on the Arlington Engineering and/or Water Department's Approved Contractor List. All information must be completed and submitted with the bid proposal, and the submitting party must certify that the information provided is true and sufficiently complete so as not to be misleading.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR QUALIFICATIONS

A. The general contractor organization must be able to demonstrate that they and all those performing work under the general contractor’s direction are organized to perform the proposed construction. They must also demonstrate that they have consistently and satisfactorily completed public and private facility construction projects similar in scope, complexity, and size over the past five years (or the company’s entire history if less than five years).

B. The general contractor organization is required to complete the attached Company Project History forms, providing a complete listing of all municipal projects completed over the past five years. Forms must be completed by each company.

C. The general contractor and all major sub-contractors (including those involved in turf establishment, tree transplanting, tree installation, grading, irrigation installation, utility installation, paving construction, and playground equipment installation) are required to complete and submit the following attached questionnaire.

D. A resume of the proposed project superintendent should be prepared and should include educational experience, work experience and a listing of all public and private facility projects completed within the last five years. Include a brief description of the project, its size, construction cost, location, and owner contact.

E. If the project includes public water, sewer, or street construction, applicable contractor or subcontractor must be listed on the Arlington Arlington Engineering and/or Water Department’s Approved Contractor List.

F. All information must be completed and submitted with the bid proposal.

The undersigned certifies that the information provided herein is true and sufficiently complete so as not to be misleading.

SUBMITTED BY:

(Signature)

NAME:

ADDRESS:

PRINCIPAL OFFICE:

WITNESS:

(Signature)

SUBMITTED BY:
NAME:
ADDRESS 1:
ADDRESS 2:
PRINCIPAL OFFICE 1:
PRINCIPAL OFFICE 2:
WITNESS:

File details come from the government source that posted it. Updated .