This is a Scope of Work document for Request for Proposals (RFP) 26-0159 issued by the City of Arlington Water Utilities in Texas for maintenance and repair services of Vertical Turbine Pumps (VTPs) and associated equipment. The City seeks qualified vendors to provide routine and emergency maintenance, inspection, removal, repair, remanufacture, reinstallation, and commissioning services for VTPs located at multiple pump stations and water treatment facilities, including Arkansas Pump Station, Charles F. Anderson Pump Station, JK High Service Pump Station, JK West High Service, JK Backwash Pumps, PB High Service, PB Filter Backwash, PB Recycle Pumps, and Raw Water Pump Stations. Services encompass field work such as pump removal and reinstallation, disconnection and reconnection of assemblies, on-site troubleshooting, vibration analysis, and emergency response within 24 hours of notification, as well as comprehensive shop services including complete disassembly, inspection, remanufacturing to OEM tolerances, machining, dynamic balancing, bearing and shaft replacement, coating application with NSF 61 approved materials, and transportation with appropriate rigging and cranes. The City reserves the right to add or remove facilities during the contract term and requires submission through the Bonfire platform, with late proposals not accepted.
Pricing shall be submitted in a format specified by the City and may include hourly labor rates for routine and emergency services, shop labor rates, staff engineer rates, unit pricing for specific pump services, repair scenario pricing, percentage discounts off published parts price lists, and itemized transportation and crane costs. Qualified proposers must demonstrate experience repairing VTPs in municipal water and wastewater facilities, provide references from Texas municipalities, maintain licensed Professional Engineers (Texas PE preferred), hold appropriate certifications such as ISO 9001 or UL 508A as applicable, and possess field vibration and performance testing capabilities. The contractor must maintain a complete machine shop with two-plane dynamic balancing, grit blasting and coating facilities, overhead cranes, vibration analysis equipment, and a field service fleet. All repaired or remanufactured components carry a minimum twelve-month warranty from installation or eighteen-month warranty from shipment, whichever occurs first. The contractor must comply with OSHA and Texas safety regulations, maintain appropriate insurance and bonding, provide confined space trained personnel when required, and ensure 24-hour emergency service availability with after-hours, weekend, and holiday capability. The City does not guarantee quantities and reserves the right to purchase according to actual need.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP 26-0159
Request for Proposals for Maintenance and Repair of Vertical Turbine Pumps
SCOPE OF WORK
1. INTENT
The City of Arlington Water Utilities is soliciting proposals from qualified firms to provide maintenance, inspection, removal, repair, remanufacture, reinstallation, and emergency services for Vertical Turbine Pumps (VTPs) and associated equipment located at various City pump stations and water treatment facilities.
The intent of this contract is to establish a qualified vendor capable of providing both routine and emergency services, including complete pump remanufacture to OEM tolerances when required.
2. LOCATIONS
Services may be required at, but are not limited to, the following pump stations and facilities:
• Arkansas Pump Station (multiple units)
• Charles F. Anderson Pump Station (multiple units)
• JK High Service Pump Station (multiple units, including engine-driven units with right-angle drives)
• JK West High Service
• JK Backwash Pumps
• PB High Service
• PB Filter Backwash
• PB Recycle Pumps
• Raw Water Pump Stations
The City reserves the right to add or remove facilities during the contract term.
3. GENERAL SCOPE OF SERVICES
The Contractor shall provide all labor, supervision, tools, equipment, transportation, materials, parts, and incidentals necessary to perform the following:
3.1 Field Services
• Removal and reinstallation of vertical turbine pumps
• Disconnection and reconnection of pump and motor assemblies
• Unbolting pumps from baseplates and discharge piping
• Coordination with City personnel for lockout/tagout (City retains responsibility for electrical lockout unless otherwise specified)
• Provision of temporary well or clearwell covers after pump removal
• On-site troubleshooting and diagnostics
• Vibration analysis and field balancing
• Start-up, commissioning, and performance testing
• Emergency response within 24 hours of notification
3.2 Shop Services
• Complete pump disassembly and inspection
• Cleaning for inspection and measurement
• Dimensional analysis of shafts, bearings, wear rings, and registers
• Preparation of written inspection and condition assessment reports
• Remanufacturing to OEM tolerances where required
• Machining (bearing bores, shaft journals, wear ring fits)
• Shaft straightening to specified TIR tolerances
• Dynamic balancing of impellers
• Bearing replacement (bronze, nickel bronze, stainless steel, Viton, etc.)
• Fabrication of special bearings or wear components
• Replacement of shafts (e.g., 416 stainless steel bowl shafts)
• Coupling inspection and repair
• Mechanical seal inspection and repair
• Assembly and final inspection prior to shipment
3.3 Coating and Surface Preparation
• Abrasive blasting to Commercial Finish or White Metal as specified
• Application of NSF 61 approved coatings (e.g., Carboline 891 or approved equal)
• Coating thickness of 12–14 mils DFT unless otherwise specified
• Holiday testing and thickness verification
• Touch-up of painted surfaces when full recoating is not required
3.4 Transportation & Rigging
• Provision of cranes (e.g., 30-ton or as required)
• Provision of transport vehicles (tractor-trailer or equivalent)
• Securing pumps during transport to prevent column deflection
• Coordination of shipping to coating facilities and subcontractors
• Return transport and reinstallation
4. REPAIR METHODOLOGY
The Contractor shall follow a documented repair and remanufacturing methodology including:
1. Receipt and order creation
2. Pre-teardown inspection and dimensional documentation
3. Disassembly
4. Cleaning for inspection
5. Detailed inspection and measurement
6. Internal report and City-facing report with photos
7. Quotation and lead time (if outside predefined scope)
8. Component repair/remanufacture
9. Component coating
10. Reassembly
11. Final inspection
12. Shipment preparation
The City may request either:
• Part Replacement Repairs (replacement of wear components only), or
• Full Remanufacture Repairs (restoration to OEM tolerances and fits)
The selected contractor must be capable of both approaches.
5. INSPECTION & REPORTING REQUIREMENTS
The Contractor shall provide written inspection reports that include:
• As-found dimensional measurements
• Bearing clearances
• Wear ring clearances
• Shaft runout measurements
• Register fits and tolerances
• Photographic documentation
• Repair recommendations
• Identification of components outside acceptable tolerances
• Final test and vibration readings (post-installation)
Reports shall be submitted electronically in PDF format.
6. LABOR CLASSIFICATIONS
The Contractor shall provide, at minimum, the following labor classifications:
• Field Service Technicians (routine and emergency rates)
• Staff Engineers
• Shop Mechanics
• Machinists
• Vibration Analysts
• Project Managers
Emergency service must include on-site response within 24 hours unless otherwise negotiated.
7. MATERIALS & PARTS
The Contractor shall:
• Provide OEM or equivalent quality parts
• Fabricate custom components when necessary
• Supply stainless steel hardware where specified
• Provide specialty bearings and wear components
• Offer a percentage discount off published price lists for parts (if applicable)
• Maintain adequate inventory or supply chain capability
8. EQUIPMENT REQUIREMENTS
The Contractor must have:
• Machine shop capabilities (turning, milling, boring, vertical lathe operations)
• Two-plane dynamic balancing capability
• Grit blasting and enclosed coating facilities
• Overhead crane lifting capacity appropriate for large VTP components
• Field service fleet capable of pump removal and installation
• Vibration analysis equipment
• Coating thickness and holiday detection equipment
9. SAFETY REQUIREMENTS
The Contractor shall:
• Comply with OSHA and all Texas safety regulations
• Provide confined space trained personnel when required
• Coordinate with City safety protocols
• Provide crane operators and certified personnel
• Maintain appropriate insurance and bonding as required by Texas municipal law
10. EMERGENCY SERVICES
Emergency services shall include:
• 24-hour availability
• Mobilization within 24 hours of notification
• After-hours, weekend, and holiday service capability
• Temporary stabilization if full repair cannot immediately occur
11. WARRANTY
All repaired or remanufactured components shall be warranted for a minimum of twelve (12) months from installation or eighteen (18) months from shipment, whichever occurs first, unless otherwise specified in the final contract.
12. QUALIFICATIONS
Proposers must:
• Demonstrate experience repairing vertical turbine pumps in municipal water/wastewater facilities
• Provide references from Texas municipalities
• Have licensed Professional Engineers available (Texas PE preferred)
• Maintain appropriate certifications (e.g., ISO 9001, UL 508A, etc., if applicable)
• Demonstrate field vibration and performance testing capability
13. PRICING STRUCTURE
Pricing shall be submitted in the format required by the City and may include:
• Hourly labor rates (routine and emergency)
• Shop labor rates
• Staff engineer rates
• Unit pricing for pump removal, disassembly, and inspection
• Repair scenario pricing
• Percentage discount off published parts price lists
• Transportation and crane costs (clearly itemized)
The City reserves the right to purchase according to actual need and does not guarantee quantities.