Summary of 7-02 Drawings - Poison Oak Rd Realignment Project Phase II
This document contains engineering drawings for the Poison Oak Road Realignment Phase II project in Texas. The drawings provide detailed design specifications for approximately 4,200 linear feet of new four-lane roadway construction, including bridge structures, drainage systems, water infrastructure, pedestrian facilities, and lighting installations. The project is valued at an engineer's estimate of $8,900,000, and the selected contractor must complete all work within 550 consecutive calendar days from the Notice to Proceed. These technical drawings serve as the basis for bid preparation and construction execution, detailing the geometric layout, structural elements, utility coordination, and site improvements required for the roadway realignment.
The drawings establish the construction standards and technical requirements that bidding contractors must follow to meet project specifications. As engineering documents, they provide the foundation for accurate cost estimation, material procurement planning, and construction sequencing. The 550-day project timeline indicates a substantial construction schedule requiring coordination of multiple trades and disciplines. Contractors should utilize these drawings in conjunction with the Scope of Work and supporting bid documents to develop comprehensive proposals that address all technical, scheduling, and cost considerations for this infrastructure improvement project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .