About this file
Bid Schedule Summary: Poison Oak Road Realignment Phase II
This document is a Bid Schedule required for the City of Temple, Texas 2017 Poison Oak Road Realignment Project Phase 2, a comprehensive infrastructure development project. The project encompasses approximately 4,200 linear feet of new four-lane roadway construction, including a new 64-foot-wide vehicular bridge, drainage systems, water main installation, pedestrian facilities, and street lighting. The scope of work is divided into three primary categories: roadway construction, storm sewer installation, and water main construction. Roadway items include site mobilization, earthwork, embankment, pavement layers (HMAC and reinforced concrete), curb and gutter installation, sidewalks with ADA-compliant curb ramps, guard railing, striping, signage, and barbed wire fencing totaling approximately 31,370 square yards of base and subgrade work. Storm sewer work involves installation of new 30-inch and 18-inch reinforced concrete pipe (RCP) totaling 850 linear feet, precast concrete curb inlets, headwalls with energy dissipators, and stone rip rap. Water main construction includes 2,860 linear feet of new 12-inch PVC DR18 water main, 410 linear feet of 8-inch PVC DR18 water main, and associated fittings, gate valves, fire hydrant assemblies, and testing. The contractor must complete all work within 550 consecutive calendar days from Notice to Proceed.
All line items in the bid schedule are presented with zero unit prices and zero total amounts, indicating this is a blank template for contractor bidding. The engineer's estimate of probable cost for the entire project is $8,900,000. The bid schedule includes separate exhibits for Roadway, Storm Sewer, and Water components, with subtotals to be calculated based on contractor pricing submissions. All work must comply with City of Temple specifications, project details, and applicable regulatory requirements including TCEQ specifications for storm water pollution prevention plans and water system testing. The document contains formula errors in certain calculation cells, suggesting this is a working template requiring completion by bidders during the submission process.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Roadway
EXHIBIT “A”
BID SCHEDULE
CITY OF TEMPLE, TEXAS
2017 Poison Oak Road Realignment Project Phase 2 Item No. Estimated Quantity Unit Description of Item Unit Price in Figures Total Amount
| SITE MOBILIZATION | |||||
| 1) | 53 | STA | Furnish and install all materials, labor, overhead, and profit required to provide Preparation of Right-of-Way, Haul Off, and Site Clearing, including but not limited to; site demolition; site signage and utility adjustment, removal, and replacement; existing utility and structure bracing, and/or protection; mailbox removal and replacement, landscaping removal and replacement, including tree protection; DVD copies of Video Recording of site pre and post construction; per project specifications and details, complete in place per station. | $ - 0 | $ - 0 |
| 2) | 100% | LS | Furnish and install all materials, labor, overhead, and profit required to provide Mobilization, Bonds, Permits and Insurance, per project specifications and details, complete in place per lump sum. | $ - 0 | $ - 0 |
| 3) | 100% | LS | Furnish and install all materials, labor overhead, and profit required to provide and implement a Storm Water Pollution Prevention Plan, including permits, per City of Temple and TCEQ specifications and requirements, complete in place per lump sum. | $ - 0 | $ - 0 |
| 4) | 100% | LS | Furnish and install all materials, labor, overhead, and profit required to implement a Traffic Control Plan, per project specifications and details, complete in place per lump sum. | $ - 0 | $ - 0 |
| 5) | 100% | LS | Furnish and install all materials, labor, overhead, and profit required to provide and implement a Trench Safety Plan, signed and sealed by Registered Professional Engineer Licensed in the State of Texas, per project specifications and details, complete in place per lump sum. | ||
| $ - 0 | $ - 0 | ||||
| 6) | 100% | LS | Furnish and install all materials, labor, overhead, and profit required to Pothole, Excavate and Locate Existing Utilities, at locations shown on plans, per project specifications, notes and details, complete in place per lump sum. | $ - 0 | $ - 0 |
| NEW ROADWAY CONSTRUCTION |
| 7) | 100% | LS | Furnish and install all materials, labor overhead, and profit required to provide all Earthwork and Embankment, at locations shown on plans, per project specifications and details, complete in place per lump sum. | $ - 0 | $ - 0 |
| 8) | 100% | LS | Furnish and install all materials, labor overhead, and profit required to provide Temporary Irrigation, as required, to provide new roadway and utility construction, as shown on plans, per project specifications and details, complete in place per lump sum. | ||
| $ - 0 | $ - 0 | ||||
| 9) | 39,400 | SY | Furnish and install all materials, labor overhead, and profit required to provide 4" Sandy Loam Topsoil and Bermuda Grass Seeding via Hydromulch, as required, to provide new roadway and utility construction, as shown on plans, per project specifications and details, complete in place per square yard. | ||
| $ - 0 | $ - 0 | ||||
| 10) | 7 | EA | Furnish and install all materials, labor, overhead, and profit required to adjust Existing Sanitary Sewer Manhole to new grade, as required, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
| Item No. | Estimated Quantity | Unit | Description of Item | Unit Price in Figures | Total Amount |
| 11) | 8 | EA | Furnish and install all materials, labor, overhead, and profit required to provide Connection to Existing Pavement Sections, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
| 12) | 80 | SY | Furnish and install all materials, labor overhead, and profit required to provide 7" Reinforced Concrete Pavement Section, at locations shown on plans, per project specifications and details, complete in place per square yard. | $ - 0 | $ - 0 |
| 13) | 22,700 | SY | Furnish and install all materials, labor overhead, and profit required to provide 2.5" HMAC Pavement, at locations shown plans, per project specifications and details, complete in place per square yard. | $ - 0 | $ - 0 |
| 14) | 31,370 | SY | Furnish and install all materials, labor, overhead and profit required to provide, 13.5" Crushed Limestone Base, at locations shown on plans, per project specifications and details, complete in place per square yard. | $ - 0 | $ - 0 |
| 15) | 31,370 | SY | Furnish and install all materials, labor, overhead and profit required to provide, 6" Moisture Conditioned Subgrade, at locations shown on plans, per project specifications and details, complete in place per square yard. | $ - 0 | $ - 0 |
| 16) | 31,370 | SY | Furnish and install all materials, labor, overhead and profit required to provide, Tensar HX5.5 Geogrid between base and subgrade, at locations shown on plans, per project specifications and details, complete in place per square yard. | $ - 0 | $ - 0 |
| 17) | 7,460 | LF | Furnish and install all materials, labor overhead, and profit required to provide Standard 24” Concrete Curb and Gutter, at locations shown on plans, per project specifications and details, complete in place per linear foot. | $ - 0 | $ - 0 |
| 18) | 580 | LF | Furnish and install all materials, labor overhead, and profit required to provide Standard 24” Concrete Edging, at locations shown on plans, per project specifications and details, complete in place per linear foot. | $ - 0 | $ - 0 |
| 19) | 4,980 | SY | Furnish and install all materials, labor, overhead and profit required to provide Reinforced Concrete Sidewalk, including Detectable Warning Pavers, at locations shown on plans, per project specifications, complete in place per square yard. | $ - 0 | $ - 0 |
| 20) | 17 | EA | Furnish and install all materials, labor, overhead, and profit required to provide New ADA Handicap Curb Ramp, at locations shown on plans, per TAS and project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
| 21) | 2,380 | LF | Furnish and install all materials, labor overhead, and profit required to provide New Metal Beam Guard Railing, at locations shown on plans, per project specifications, notes and details, complete in place per linear foot. | $ - 0 | $ - 0 |
Item No. Estimated Quantity Unit Description of Item Unit Price in Figures Total Amount
| 22) | 100% | LS | Furnish and install all materials, labor, overhead, and profit required to provide New Pedestrian and Traffic Striping at locations shown on plans, per project specifications and details, complete in place per lump sum. | $ - 0 | $ - 0 |
| 23) | 100% | LS | Furnish and install all materials, labor, overhead, and profit required to provide New Pedestrian and Traffic Signage, at locations shown on plans, per project specifications and details, complete in place per lump sum. | $ - 0 | $ - 0 |
| 24) | 6 | EA | Furnish and install all materials, labor, overhead, and profit required to provide New Type III Barricades, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
| 25) | 1,900 | LF | Furnish and install all materials, labor overhead, and profit required to provide New 5-Strand Barbed Wire Fencing and Gates, to match existing, at locations shown on plans, per project specifications, notes and details, complete in place per linear foot. | $ - 0 | $ - 0 |
| 26) | 100% | LS | Furnish and install all materials, labor, overhead, and profit required to provide New Street Lighting; including but not limited to light poles, 2" PVC Schedule 40 electrical conduit, wiring, connection boxes, secondary and service boxes, foundations and all miscellaneous appurtenances, per project plans, specifications, and details, complete in place per lump sum | $ - 0 | $ - 0 |
| 27) | 3,500 | LF | Furnish and install all materials, labor, overhead, and profit required to provide New 4” PVC Schedule 40 Conduit Sleeves, at locations shown on plans, per project specifications and details, complete in place per linear foot. | ||
| $ - 0 | $ - 0 | ||||
| 28) | 100% | LS | Furnish and install all materials, labor, overhead, and profit required to provide New 64' Wide Vehicular Bridge; including but not limited to reinforced concrete approach slabs, earthwork, backfill, compaction, reinforced concrete abutments, reinforced concrete pier footings, precast reinforced concrete I-girders, reinforced concrete decking, guard rails, utility hangers, pedestrian sidewalk, concrete rip rap, and all miscellaneous appurtenances, per project plans, specifications, and details, complete in place per lump sum. | $ - 0 | $ - 0 |
| 29) | 1 | EA | Furnish and install all materials, labor overhead, and profit required to Remove and Replace Existing Mailbox, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
Item No. Estimated Quantity Unit Description of Item Unit Price in Figures Total Amount
STORM SEWER
| 30) | 11 | EA | Furnish and install all materials, labor, overhead, and profit required to provide Connection to Existing Storm Sewer and Existing Junction Boxes, including but not limited to trenching, backfill, and embedment, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 | |||
| 31) | 740 | LF | Furnish and install all materials, labor, overhead, and profit required to provide New 30” RCP Class III Storm Sewer, at locations shown on plans, including but not limited to, bypass pumping and/or dewatering, backfill, embedment, trenching, per project specifications and details, complete in place per linear foot. | |||||
| $ - 0 | $ - 0 | |||||||
| 32) | 110 | LF | Furnish and install all materials, labor, overhead, and profit required to provide New 18” RCP Class III Storm Sewer, at locations shown on plans, per project specifications and details, complete in place per linear foot. | |||||
| $ - 0 | $ - 0 | |||||||
| 33) | 1 | EA | Furnish and install all materials, labor, overhead, and profit required to provide New Precast Concrete Headwall with Energy Dissipators, including but not limited to trenching, backfill, and embedment, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 | |||
| 34) | 6 | EA | Furnish and install all materials, labor, overhead, and profit required to provide New 15’ Precast Reinforced Concrete Curb Inlet, at locations shown on plans, per project specifications and details, complete in place per each. | |||||
| $ - 0 | $ - 0 | |||||||
| 35) | 500 | SY | Furnish and install all materials, labor, overhead, and profit required to provide New Stone Rip Rap, 18" avg. dia., at locations shown on plans, per project specifications and details, complete in place per square yard. | $ - 0 | $ - 0 | $ 1,052,400.00 | ||
| 36) | 4 | EA | Furnish and install all materials, labor, overhead, and profit required to adjust Existing Concrete Junction Boxes to new grade, as required, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 | ERROR:#REF! | 2 | ERROR:#REF! |
| Subtotal City of Temple Poison Oak Road Realignment Project: New Roadway Construction | $ - 0 | 2.25 | ERROR:#REF! |
4.25 ERROR:#REF!
| $ 175,580.00 |
| ERROR:#REF! |
Water
EXHIBIT “A”
BID SCHEDULE
CITY OF TEMPLE, TEXAS
2017 Poison Oak Road Realignment Project Phase 2 Item No. Estimated Quantity Unit Description of Item Unit Price in Figures Total Amount
NEW WATER MAIN CONSTRUCTION
| 1) | 3 | EA | Furnish and install all materials, labor, overhead, and profit required to provide Connection to Existing Water Main, including but not limited to; thrust blocking, Mega-Lug Joint Restraint, and Foster Mechanical Joint Adaptors, or pre-approved equals, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
| 2) | 100% | LS | Furnish and install all materials, labor, overhead, and profit required to Disconnect, Cap, and Abandon Existing Water Main, at locations shown on plans and per City of Temple Requirements, per project specifications, notes and details, complete in place per lump sum. | $ - 0 | $ - 0 |
| 3) | 2,860 | LF | Furnish and install all materials, labor, overhead, and profit required to provide New 12” PVC DR18 Water Main, including but not limited to; trenching, embedment, backfill, miscellaneous fittings, and thrust blocking, at locations shown on plans, per project specifications and details, complete in place per linear foot. | $ - 0 | $ - 0 |
| 4) | 410 | LF | Furnish and install all materials, labor, overhead, and profit required to provide New 8” PVC DR18 Water Main, including but not limited to; trenching, embedment, backfill, miscellaneous fittings, and thrust blocking, at locations shown on plans, per project specifications and details, complete in place per linear foot. | $ - 0 | $ - 0 |
| 5) | 25 | LF | Furnish and install all materials, labor, overhead, and profit required to provide New 6” PVC DR18 Water Main, including but not limited to; trenching, embedment, backfill, miscellaneous fittings, and thrust blocking, at locations shown on plans, per project specifications and details, complete in place per linear foot. | $ - 0 | $ - 0 |
| 6) | 20 | LF | Furnish and install all materials, labor, overhead, and profit required to provide New 24” Steel Pipe Encasement, including but not limited to; trenching, embedment, backfill, miscellaneous fittings, and thrust blocking, at locations shown on plans, per project specifications and details, complete in place per linear foot. | $ - 0 | $ - 0 |
| 7) | 20 | LF | Furnish and install all materials, labor, overhead, and profit required to provide New 16” Steel Pipe Encasement, including but not limited to; trenching, embedment, backfill, miscellaneous fittings, and thrust blocking, at locations shown on plans, per project specifications and details, complete in place per linear foot. | $ - 0 | $ - 0 |
| 8) | 1 | EA | Furnish and install all materials, labor overhead, and profit required to provide new 8”x8” MJ Tee, including but not limited to; thrust blocking and Mega-Lug Joint Restraint and Foster Mechanical Joint Adaptors, or pre-approved equals, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
Item No. Estimated Quantity Unit Description of Item Unit Price in Figures Total Amount
| 9) | 4 | EA | Furnish and install all materials, labor overhead, and profit required to provide new 12”x6” MJ Tee, including but not limited to; thrust blocking and Mega-Lug Joint Restraint and Foster Mechanical Joint Adaptors, or pre-approved equals, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
| 10) | 1 | EA | Furnish and install all materials, labor overhead, and profit required to provide new 8”x6” MJ Tee, including but not limited to; thrust blocking and Mega-Lug Joint Restraint and Foster Mechanical Joint Adaptors, or pre-approved equals, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
| 11) | 1 | EA | Furnish and install all materials, labor overhead, and profit required to provide new 12”x8” MJ Reducer, including but not limited to; thrust blocking and Mega-Lug Joint Restraint and Foster Mechanical Joint Adaptors, or pre-approved equals, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
| 12) | 1 | EA | Furnish and install all materials, labor overhead, and profit required to provide new 12” MJ Gate Valve, including but not limited to; thrust blocking and Mega-Lug Joint Restraint and Foster Mechanical Joint Adaptors, or pre-approved equals, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
| 13) | 3 | EA | Furnish and install all materials, labor overhead, and profit required to provide new 8” MJ Gate Valve, including but not limited to; thrust blocking and Mega-Lug Joint Restraint and Foster Mechanical Joint Adaptors, or pre-approved equals, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
| 14) | 4 | EA | Furnish and install all materials, labor overhead, and profit required to provide new 6” MJ Gate Valve, including but not limited to; thrust blocking and Mega-Lug Joint Restraint and Foster Mechanical Joint Adaptors, or pre-approved equals, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
| 15) | 8 | EA | Furnish and install all materials, labor overhead, and profit required to provide new 12” MJ 45 Degree Bend, including but not limited to; thrust blocking and Mega-Lug Joint Restraint and Foster Mechanical Joint Adaptors, or pre-approved equals, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
| 16) | 7 | EA | Furnish and install all materials, labor overhead, and profit required to provide new 8” MJ 45 Degree Bend, including but not limited to; thrust blocking and Mega-Lug Joint Restraint and Foster Mechanical Joint Adaptors, or pre-approved equals, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
Item No. Estimated Quantity Unit Description of Item Unit Price in Figures Total Amount
| 17) | 4 | EA | Furnish and install all materials, labor overhead, and profit required to provide new Standard Fire Hydrant Assembly, including but not limited to; saw cut, removal, and replacement of existing pavement sections, miscellaneous fittings, tees, gate valves, piping, trenching, backfill, and embedment, thrust blocking and Mega-Lug Joint Restraint and Foster Mechanical Joint Adaptors, or pre-approved equal, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
| 18) | 1 | EA | Furnish and install all materials, labor overhead, and profit required to Remove and Salvage Existing Fire Hydrant assembly, including but not limited to; saw cut, removal, and replacement of existing pavement sections, miscellaneous fittings, piping, trenching, backfill, and embedment, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
| 19) | 100% | LS | Furnish and install all materials, labor, overhead, and profit required to provide ALL TESTING per TCEQ and City of Temple Requirements and Contract Documents, complete in place per lump sum. | $ - 0 | $ - 0 |
Subtotal City of Temple Poison Oak Road Realignment Project: New Water Main $ - 0
Total City of Temple Poison Oak Road Realignment Project: $ - 0