7-01 Scope of Work Marion Oaks 2026-05-12.pdf

PDF 181 KB Posted

Attached to
26B-095 2026 Marion Oaks Overlay Units 9, 10 and 12
Solicitation number
26-095
Issued by
Marion County, Florida

About this file

This Scope of Work document, issued by the County of Marion, Florida, outlines a road resurfacing project for approximately 11.65 miles of minor local road sections across Marion Oaks Units 9, 10, and 12. The resurfacing work includes roadway preparation, leveling, shoulder removal, temporary striping, permanent thermoplastic striping, and stabilization of all construction-disturbed areas. The contract term is 120 calendar days from the Notice to Proceed, with all work except thermoplastic striping required to be completed within 90 days. The final 30 days of the contract period are designated for thermoplastic striping placement only. Liquidated damages will be assessed for any incomplete contract items remaining after the 90-day period, excluding thermoplastic striping work. The County strongly recommends that contractors visit the project work location prior to bid submission.

The Notice to Proceed will not be issued until all required documentation is received by the County. No pricing terms, set-asides, funding sources, or award dates are specified in this Scope of Work document. Contractors are advised that site visits prior to bid submission are highly recommended to ensure accurate cost estimation and project feasibility assessment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work

DESCRIPTION OF PROJECT

This project involves resurfacing of approximately 11.65 miles of minor local road sections in Marion

Oaks Units 9, 10 and 12. Resurfacing work is to include roadway prep, leveling, shoulder removal, temporary striping, permanent thermoplastic striping, and stabilizing all areas disturbed during construction.

CONTRACT TERM

This contract will be in effect for 120 calender days from the date of the NOTICE TO PROCEED. The NOTICE TO PROCEED will not be issued until all required documentation is received by the COUNTY. The last 30 days of the contract is to accommodate the placement of thermoplastic striping only. All other contract related work must be completed within 90 days. Liquidated damages will begin to be imposed if there are any outstanding contract items remaining incomplete except for thermoplastic striping after 90 days.

PRIOR TO SUBMITTING BID

It is in the CONTRACTOR’s best interest and highly recommended for CONTRACTOR to visit the project work location before submitting a bid.

File details come from the government source that posted it. Updated .