7-009 Bid Items.pdf
PDF 156 KB Posted
- Solicitation number
- 27000031
- Issued by
- Mason County, Texas
About this file
This Bid Items document from the State of Texas outlines the line-item pricing structure for the Sinclair Phase III and Westridge Loop 250 Deceleration Lane project. The project encompasses the furnishing of materials and labor for roadway improvements, including site preparation, asphalt paving, concrete work, and associated miscellaneous construction activities. The bid items are organized by category and include various quantities for different work elements such as clearing and grubbing, embankment construction, base course installation, asphalt surface courses, concrete pavement, curb and gutter installation, drainage structures, and traffic control devices. Contractors are required to submit unit prices for each bid item, which will be used to calculate total project costs based on the quantities specified in the document.
The pricing structure requires bidders to provide detailed unit costs for all identified line items, enabling the state to evaluate proposals on a standardized basis. The bid items format allows for potential changes in quantities during construction, with final payment determined by actual work completed multiplied by the contracted unit prices. This method protects both the contracting agency and the contractor by establishing clear pricing mechanisms while accommodating unforeseen conditions typical in roadway construction projects. The document serves as the foundation for competitive bidding and establishes the framework through which all proposals will be evaluated and compared.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item No. Quantity Unit Pay Note Unit Price Total Amount
(See Proposal sheet for additional information.)
Description
Total Miscellaneous Items 1 - 4
SINCLAIR PHASE III BID ITEMS
Project Name: Phase III Sinclair Avenue & Westridge Loop 250 Deceleration Lane Project Number: PD25-01 & P26-02
Miscellaneous Items
1)
3) Traffic Control, furnished, installed, complete and in place.
MO
MO
2)
Mobilization, furnished, installed, complete and in place.
Erosion/Sediment Control, furnished, installed, complete and in place.
M1
M2
10 MO
4) Job Site Safety, furnished, installed, complete and in place. 10 MO
M4
M3
D3
Total Demolition Items 1 - 5
Description
3) Unclassified Ditch Excavation, complete and in place.
Demolition Items
SY
LF
D2
D5
LF
2) Unclassified Roadway Excavation (Depth ≤ 30”), complete and in place.
5) Removal & Disposal of Existing Concrete Curb & Gutter, complete and in place.
SY
D4
4) Removal & Dispose of Existing Unclassified Pavement, complete and in place. 38
1) Preparation of Right-of-Way, furnished, installed, complete and in place. 13.16 ACRE D1
2) 8” Gate Valve & Box (MJxMJ/FL), furnished, installed, complete and in place.
Water Items
Description
1) 8” AWWA C-900 DR18, PVC, Water Main, furnished, installed, complete and in place. 567 LF W1
EA W2
3) Ductile Iron Fittings, furnished, installed, complete and in place. 4361 LBS W3
Total Water Items 1 - 5 $___________________________________________________________
5) Open Trenching of Water Main, furnished, installed, complete and in place. 567 LF W5
4) Connect to Existing Water Main, furnished, installed, complete and in place. 6 EA W4
Wastewater Items
Description
1) 8” SDR 26 ASTM D2241, PVC, Wastewater Main, furnished, installed, complete and in place. 500 LF WW1
LF WW4
2) Connection to Existing Manhole, furnished, installed, complete and in place. 5 EA WW2
Total Wastewater Items 1 - 4 $___________________________________________________________
4) Open Trenching of Wastewater Main, furnished, installed, complete and in place.
3) 8” Wastewater Main Plug, furnished, installed, complete and in place. 250 EA WW3
Total Storm Drain Items 1 - 10
2)
4)
36” Reinforced Concrete Pipe (RCP), furnished, installed, complete and in place.
Reinforced Concrete Headwall, furnished, installed, complete and in place.
SD1
LF SD2
EA SD3
Storm Drain Items
Description
1) 6’x2’ Reinforced Concrete Box Culvert furnished, installed, complete and in place. 120 LF
10) 8” Rock Rip-Rap, furnished, installed, complete and in place. 1787 SY SD9
5) Open Trenching of Storm Drain, (0’-10’ Deep), furnished, installed, complete and in place. 290 LF SD4
300 SY SD6
4” Concrete Footing, furnished, installed, complete and in place. 43 SY SD5
8) 6” Concrete Flume, furnished, installed, complete and in place. 713 SY
7)
SD7
6)
Concrete Scupper, furnished, installed, complete and in place.
SD2
3) 24” Reinforced Concrete Pipe (RCP), furnished, installed, complete and in place. 60 LF
1113 SY SD8
9) 6” Concrete Pilot Swale, furnished, installed, complete and in place.
No. Quantity Unit Pay Note Unit Price Total AmountDescription
ST4
LF ST3
Structural Items
12071 LF ST1
2) Fence Gate, complete and in place.
5 EA ST2
1) Barbed-Wire Fence, complete and in place.
4) Bollard, complete and in place.
8 EA
3) Type 3 Barricade (Permenant), complete and in place.
Total Structural Items 1 - 4
Paving Items
Description Subgrade Preparation (Depth ≤ 8”), furnished, installed, complete and in place.
6)
7)
8) 12” Flexible Base (Type A, Grade 4), furnished, installed, complete and in place. 63671 SY P7
P6 2” Type C HMAC Asphalt Pavement Surface Course (PG64-22, 110 LBS / SY @ 1” Thick), furnished, installed, complete and in place.
P6
Unclassified Embankment (Density Controlled), furnished, installed, complete and in place.
3” Type C HMAC Asphalt Pavement Surface Course (PG64-22, 110 LBS / SY @ 1” Thick), furnished, installed, complete and in place.
SY
SY
SY
SY
SY
P4
P5
49113
49113
63671
16372
P3
P1
P2
SY
CY
7” Continuously Reinforced Concrete Pavement, furnished, installed, complete and in place.
7” Jointed Concrete Pavement, furnished, installed, complete and in place.
2” Type D HMAC Asphalt Pavement Surface Course (PG70-22, 110 LBS / SY @ 1” Thick), furnished, installed, complete and in place.
4)
5)
3)
2)
1)
418 SY P7
9) 8” Flexible Base (Type A, Grade 4), furnished, installed, complete and in place.
10) Bituminous Prime Coat (MC-30, 0.20 Gal / SY), furnished, installed, complete and in place. 9823 GAL P8
11) Tack Coat (MC-30, 0.10 Gal / SY), furnished, installed, complete and in place. 4911 GAL P9
12) 8” Concrete Median, furnished, installed, complete and in place. 5983 SY P10
13) 8” Concrete Fillet, furnished, installed, complete and in place. 485 SY P11
14) 8” Concrete Valley Gutter, furnished, installed, complete and in place. 1767 SY P12
15) 7” Commercial Concrete Driveway Approach, furnished, installed, complete and in place. 56 SY P13
11735 LF P14
16) Type A Concrete Curb & Gutter, furnished, installed, complete and in place. 12323 LF P14
18) Type II 5-3/4" Concrete Curb & Gutter, furnished, installed, complete and in place. 318 LF P15
17) Type C Concrete Curb & Gutter, furnished, installed, complete and in place.
SY38
Total Paving Items 1 - 23
23) P19
Flowable Fill / 2-Sack Backfill, furnished, installed, complete and in place.
19) Concrete Pedestrian Access Ramp, furnished, installed, complete and in place. 19 SY P16
5 EA P18
20) 4” Concrete Sidewalk, furnished, installed, complete and in place. 1108 SY P17
22) Water Valve Box Ring & Cover Adjustment, furnished, installed, complete and in place. 11 EA P18
21) Manhole Ring & Cover Adjustment, furnished, installed, complete and in place.
No. Quantity Unit Pay Note Unit Price Total AmountDescription
1) Retroreflectorized Pavement Markings, TxDOT Item 666 (8” White, Solid), furnished, installed, complete and in place.
152 LF T1
Total Traffic Control Items 1 - 10 $___________________________________________________________
Traffic Control Items
2) Retroreflectorized Pavement Markings, TxDOT Item 666 (6” White, Solid), furnished, installed, complete and in place.
12304 LF T1
768 LF T1
3) Retroreflectorized Pavement Markings, TxDOT Item 666
(6” White, Broken, 10'/30'), furnished, installed, complete and in place.
12903 LF T1
5) Retroreflectorized Pavement Markings, TxDOT Item 666
(24” Yellow, Solid), furnished, installed, complete and in place.
254 LF T1
4) Retroreflectorized Pavement Markings, TxDOT Item 666 (6” White, Broken, 2'/6'), furnished, installed, complete and in place.
10) Small Sign Assembly, furnished, installed, complete and in place. 9 EA T3
6) Retroreflectorized Pavement Markings, TxDOT Item 666 (6” Yellow, Solid), furnished, installed, complete and in place.
10353 LF T1
12 EA T2
7) Retroreflectorized Pavement Markings, TxDOT Item 666
(6” Yellow, Solid/Solid), furnished, installed, complete and in place.
240 LF T1
9) Prefabricated Pavement Markings, TxDOT Item 666
(White, Pavement Letter), furnished, installed, complete and in place.
1 EA T2
8) Prefabricated Pavement Markings, TxDOT Item 666 (White, Arrow Symbol), furnished, installed, complete and in place.
3. Water Items $___________________________________________________________________________________________
4. Wastewater Items
7. Paving Items $___________________________________________________________________________________________
Price For:
1. Miscellaneous Items
2. Demolition Items
$___________________________________________________________________________________________Total Price
5. Storm Drain Items $___________________________________________________________________________________________
6. Structural Items $___________________________________________________________________________________________
8. Traffic Control Items $___________________________________________________________________________________________
Proposal-Pvng