J350-158-W-M0501.pdf
PDF 67 KB Posted
- Attached to
- Building 350 Chiller Replacement Phase II
- Solicitation number
- 6-S176-Q-00157-00
- Issued by
-
Department of Energy Office of Science
About this file
This is a design specification document for Building 350 Chiller Replacement Phase II at Argonne National Laboratory, detailing the technical requirements and performance schedule for a water-cooled chiller system installation. The project specifies a three-chiller configuration consisting of two existing chillers (CH-02 and CH-03, each 110 tons capacity using R-134A refrigerant) and one new chiller (CH-01, 125 tons capacity using R-513A low global warming potential refrigerant). The new chiller must feature a magnetic bearing centrifugal compressor with independent refrigerant circuits per compressor, variable primary flow control capability, and BACnet MS/TP communication protocol for coordinated three-chiller operation through a CANbus network.
Critical technical requirements include factory-installed components such as isolation valves on serviceable components, motorized discharge and manual return butterfly valves on evaporator/condenser connections, a harmonic filter maintaining less than 5% total demand distortion per IEEE 519-1992, and a first-year parts/labor warranty with five-year compressor warranty. The chiller modules must be configured to fit through standard 36-inch doors with maximum length of 64 inches and shipped knockdown for on-site reinstallation. Performance specifications are based on varying entering condenser water temperatures (85°F at 100% load down to 65°F at 25% load), with detailed evaporator and condenser performance data, electrical requirements of 460-volt three-phase service, and maximum allowable sound power limits across octave band frequencies. The document references Construction Specifications Document No. J528-109-W-T001 for additional information and was prepared by a licensed professional design firm in Chicago with a revision date of December 22, 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum and Acknowledgement Doc 2.doc | DOC document | |
| Addendum and Acknowledgement Doc.doc | DOC document | |
| Specification Document Building 350 Chiller Replacement Phase 2.pdf | ||
| ANL-70 Request for Quotation.doc | DOC document | |
| ANL-70B Reps and Certs Long-13-JAN-2025.PDF | ||
| Appendix A-71COM-22-OCT-2025.PDF | ||
| ANL-366H (on-site high risk)-01-OCT-2024.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Facilities Management & Services
FMS
FACILITY
REV. NO.
DOCUMENT TITLE
PROJECT NO.
PROJECT MANAGER
CHECKED
DESIGNED
DATE-
ANL-
DRAW A/E DWG. NO.
FACILITY DOCUMENT NUMBER
BIND ORDER
DWG.STAT
CADD NO:
A/E CADD FILE
NO(S)
PROJECT TITLE
REV. NO. DESCRIPTION BY APVD DAT
PATRICK DEMPSEY
NOE HERNANDEZ
OF 1
225 North Michigan Avenue, Suite 1100 Chicago, Illinois 60601
T: 312.332.9600 F: 312.332.9601
PROFESSIONAL DESIGN FIRM
LICENSE NUMBER 184.005683
NOT FOR CONSTRUCTION
BUILDING 350 CHILLER REPLACEMENT -
PHASE II
COORDINATE THIS DRAWING WITH CONSTRUCTION
SPECIFICATIONS DOCUMENT NO. J528-109-W-T001
Argonne
NATIONAL LABORATORY
W
1/8/2026 1:12:31 PM
J350-158-W-M0501
SCHEDULES
J350-158-W
DJS
DJS
PJD
12/22/2025 1
20. OWNER FURNISHED, CONTRACTOR INSTALLED.
19. PROVIDE UNIT WITH BACNET MS/TP.
18. PROVIDE MANUFACTURER PIPE HEADER ASSEMBLY COMPATIBLE WITH EXISTING CHILLER MODULES.
17. REFER TO SPECIFICATION SECTION 23 64 16 FOR ADDITIONAL INFORMATION.
16. SHIP KNOCKDOWN TO JOBSITE AS NEEDED. CONTRACTOR TO REINSTALL COMPONENTS AT SITE.
15. MODULES TO BE BUILT SUCH THAT THEY ARE ABLE TO FIT TRHOUGH STANDARD 36” DOOR. MAX LENGTH = 64”
14. FACTORY INSTALLED FLOW SWITCH.
13. 1ST YEAR PARTS/LABOR WARRANTY AND 5 YEAR COMPRESSOR WARRANTY TO BE PROVIDED BY MANUFACTURER.
12. PROVIDE HARMONIC FILTER: LESS THAN 5% TDD PER IEEE 519-1992.
11. R-513A LOW GWP NEXT GENERATION REFRIGERANT.
10. PROVIDE ISOLATION VALVES ON ALL SERVICEABLE COMPONENTS.
9. PROVIDE MECHANICAL AND ELECTRICAL ISOLATION FOR EACH COMPRESSOR.
8. FACTORY MOUNTED DISCONNECT.
7. MANUFACTURER’S STARTUP SHALL INCLUDE ALL REQUIRED SOFTWARE/FIRMWARE UPDATES, CONFIGURATION, AND CANBUS INTEGRATION OF THE TWO (2) EXISTING CHILLERS AND THE NEW CHILLER TO ENABLE COORDINATED THREE-CHILLER OPERATION.
6. VARIABLE PRIMARY FLOW CONTROL FOR THE TWO (2) EXISTING AND (1) NEW CHILLER MODULES SHALL BE BASED ON MONITORING THE NUMBER OF OPERATING REFRIGERATION CIRCUITS AND THE DIFFERENTIAL PRESSURE ACROSS THE ACTIVE CHILLERS. ONE CHILLER SHALL ACT AS THE PLANT MASTER VIA THE ONBOARD CANBUS NETWORK AND SHALL MODULATE CHILLED WATER FLOW TO THE LOWER OF THE FLOW REQUIREMENTS DETERMINED BY THESE INPUTS.
5. CHILLER BANK TO BE CAPABLE OF VARIABLE PRIMARY FLOW.
4. MOTORIZED DISCHARGE AND MANUAL RETURN BUTTERFLY VALVE TO BE PROVIDED BY MFR. ON EACH EVAPORATOR/CONDENSER. MANUFACTURER SHALL INSTALL ALL MOTORIZED ACTUATOR VALVES WITH THE ACTUATOR SHAFT ORIENTED PARALLEL TO THE GROUND TO ALLOW INSTALLATION OF A GRAVITY SWITCH FOR OPEN-POSITION DETECTION.
3. PROVIDE AN INDEPENDENT REFRIGERANT CIRCUIT PER COMPRESSOR.
2. PROVIDE WITH MAGNETIC BEARING CENTRIFUGAL COMPRESSOR.
1. BASED ON 85°F ENTERING CONDENSER WATER TEMPERATURE (ECWT) AT 100% LOAD, 75°F (ECWT) AT 75% LOAD, 65°F (ECWT) AT 50% LOAD, AND 65°F (ECWT) AT 25% LOAD.
REMARKS:
CH-03 (FOR REFERENCE) R-134A 110 1 0.88 0.45 0.33 0.37 0.3774 54 44 263 5.89 0.000102 85 94.3 341.1 22.3 0.000250 33.5 44.5 52.3 63 66.5 65.3 73.5 460-3 113.6/ 142.0/ 200.0 MFR - MFR VFD TRANE TACW110AT3546-MINIMOD FOR REFERENCE
CH-02 (FOR REFERENCE) R-134A 110 1 0.68 0.45 0.33 0.37 0.3774 54 44 263 5.89 0.000102 85 94.3 341.1 22.3 0.000250 33.5 44.5 52.3 63 66.5 65.3 73.5 460-3 113.6/ 142.0/ 200.0 MFR - MFR VFD TRANE TACW110AT3546-MINIMOD FOR REFERENCE
CH-01 R-513A 110 1 0.63 0.45 0.31 0.33 0.3634 54 44 263 10 0.000100 85 94.3 334.5 27.2 0.000250 33.5 44.5 52.3 63 66.5 65.3 73.5 460-3 91.7/ 114.7/ 200.0 MFR - MFR VFD TRANE TACW125AT4046-MINIMOD 1-20
100 75 50 25 63 125 250 500 1000 2000 4000 BY TYPE BY TYPE
TOTAL
DESIGN
TONS
NO.
MODULES
MAX. KW/TON AT % LOAD
(NOTE 1) NPLV
EWT
°F
LWT
°F
GPM
MAXIMUM
PRESS DROP
FT. HEAD
FOULING
FACTOR
EWT
°F
LWT
°F
GPM
MAXIMUM
PRESS DROP
FT. HEAD
FOULING
FACTOR
VOLT-P
HASE
FLA/MCA/MOCP
LH CONNECTION
DISCONNECT CONTROLLER/STARTER MANUFACTURE
R
MODEL REMARKS
UNIT NO. REFRIGERANT
CAPACITY/PERFORMANCE EVAPORATOR PERFORMANCE CONDENSER PERFORMANCE
MAXIMUM ALLOWABLE SOUND POWER IN DB RE
10¯¹² WATTS OCTAVE BAND CENTER FREQUENCY
ELECTRICAL
CHILLER SCHEDULE (WATER COOLED)
1 100% PRE-PURCHASE PACKAGE 01/12/261 100% PRE-PURCHASE PACKAGE 01/12/26
| Sheets |
| M0501 - SCHEDULES |